Brief Description: Flared the pitot lines for fittings, Started rivet
Flared the pitot tube lines with bushing/fittings for assembly. Verified fit inside the main spar assembly.
Using the phenmatic squeezer I flush riveted the first two rivets on each rib of the leading edge. I used bundges and wedges in the leading edge cradle to fit skin to rib while squeezing the rivets. Then began the flush riveting using the bucking bar and rivet gun
I also rewored the bottom access panel since it didn't fit as nice as I would like. I use a larger dimple and tightened the gapping to really squeeze the metal sheeting (turned out much better than previously