KitLog pro

Powered By Kitlog Pro v2.0

Wesleys Web Site
' style=
Date:  10-24-2016
Number of Hours:  2.00
Manual Reference:  Wing spar assembly
Brief Description:  Electrical pumbing

I finally got the flex conduit lines run in both righ and left wing spars. Drilled out the remaining 3/4" holes in lower ribs and pulled the conduit through.

Purchased knockout drill bit
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.