KitLog pro

Powered By Kitlog Pro v2.0

Eds Vans RV-6A/7A Web Site
' style=
Date:  5-11-2013
Number of Hours:  0.00
Manual Reference:  
Brief Description:  Finish drilling 1/4" holes through Goose Neck.

Time to complete drilling of the 1/4” hole in the Canopy Frame Goose neck. As most have done, I clamped the goose neck to the work bench. The top 2x4 has a 1/4” pilot hole. As seen in image 2, a 1/4” bit is placed through the 2x4 and into the goose neck to help locate the 2x4 for clamping to the work bench.
Then I simply continued drilling the 1/4” hole all the way through the goose neck.
' style=

Clamp Goose Neck to bench.

Clamp Goose Neck to bench.

' style=

1/4

1/4" bit help locate clamping.

' style=

Finish drilling 1/4

Finish drilling 1/4" goose neck.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.