KitLog pro

Powered By Kitlog Pro v2.0

Eds Vans RV-6A/7A Web Site
Work Logs Found: 20
Category Work Time: 0 Hours
 Date
Hours
Work Log Summary

Details

 12-10-2009
0.00
Prep and prime flap actuator cover parts.
Details
       

 12-09-2009
0.00
Drill for platenuts on the flap backrest brace.
Details
       

 12-08-2009
0.00
Misc flap actuator cover fabrication.
Details
       

 12-07-2009
0.00
Rercess bolt in flap actuator channel.
Details
       

 11-17-2009
0.00
Drill flap center bearing block.
Details
       

 11-16-2009
0.00
Straighten WD-613 Flap Actuator Weldment.
Details
       

 11-15-2009
0.00
9. Trim F-767 Attch Bracket to length.
Details
       

 11-15-2009
0.00
8. Fabricate and drill F-767 Attach Plate.
Details
       

 11-15-2009
0.00
7. Drill top of F-785A Backrest Brace.
Details
       

 11-15-2009
0.00
6. Drill bottom of 785A Backrest Brace.
Details
       

 11-15-2009
0.00
5. Fabricate flap actuator housing F-785B
Details
     

 11-15-2009
0.00
4. Flap bearing block attach hole location is bad.
Details
       

 11-15-2009
0.00
3. Fabricate flap center bearing block.
Details
       

 11-15-2009
0.00
2. Mark up flap center bearing block F-680.
Details
       

 11-15-2009
0.00
14. Fabricate spacer and fit Flap Actuator.
Details
       

 11-15-2009
0.00
13. Match Drill 3 holes in F-766B through Channel.
Details
       

 11-15-2009
0.00
12. Match Drill hole in F-766B Angle.
Details
       

 11-15-2009
0.00
11. Match drill center hole in F-766C Plate.
Details
       

 11-15-2009
0.00
10. Match Drill Actuator Channel through F-766C.
Details
       

 11-15-2009
0.00
1. Fabricate flap actuator F-766B.
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.