KitLog pro

Powered By Kitlog Pro v2.0

Eds Vans RV-7A Web Site
75 Logs Found 
 Date
Hours
Work Log Summary

Details

 03-18-2013
0.0
Canopy Frame. Prep Canopy Frame Top Skin. 2
Details
       

 03-17-2013
0.0
Canopy Frame. Prep Canopy Frame. 1
Details
       

 03-10-2013
0.0
Install Steps. Prep and prime Steps. 10
Details
       

 03-09-2013
0.0
Install Steps. Drill Step Anchor Block. 9
Details
       

 03-08-2013
0.0
Install Steps. Step Plate rivet hole locations. 8
Details
       

 03-07-2013
0.0
Install Steps. Drill remaining column of rivets. 7
Details
       

 03-06-2013
0.0
Install Steps. Drill Step Plate to Fuselage. 6
Details
       

 03-05-2013
0.0
Install Steps. Shape plate and cut off corner. 5
Details
       

 03-04-2013
0.0
Install Steps. Mark and drill Step Plate Holes. 4
Details
       

 03-03-2013
0.0
Install Steps. Mark and drill Step Plate Holes. 3
Details
       

 03-02-2013
0.0
Install Steps. Adjust tube length. 2
Details
       

 03-01-2013
0.0
Install Steps. Adjust tube length. 1
Details
       

 02-19-2013
0.0
Bolt and tourqe the Seat Belt Anchors.
Details
       

 02-18-2013
0.0
Rivet Top Rear Skin with Stephanie.
Details
       

 02-17-2013
0.0
Rivet Rudder Pedal Center Support to Firewall.
Details
       

 02-16-2013
0.0
Rivet the cool air vent bracket.
Details
     

 02-15-2013
0.0
Canopy latch Mechanism. Final Assembly . 4
Details
       

 02-14-2013
0.0
Canopy latch Mechanism. Prep Latch Angles. 3
Details
       

 02-13-2013
0.0
Canopy latch Mechanism. Tap Push Rod. 2
Details
     

 02-12-2013
0.0
Canopy latch Mechanism. Drill C-611 Blocks. 1
Details
       

 02-11-2013
0.0
Canopy Latch Handle, Rivet Latch Angles. 8
Details
       

 02-10-2013
0.0
Canopy Latch Handle, Install spring and wire. 7
Details
       

 02-09-2013
0.0
Canopy Latch Handle, Drill angles throgh skin. 6
Details
       

 02-08-2013
0.0
Canopy Latch Handle, File handle slots in skin. 5
Details
     

 02-07-2013
0.0
Canopy Latch Handle, File handle slots in skin. 4
Details
       

 02-06-2013
0.0
Canopy Latch Handle, Drill skin using angles, 3
Details
       

 02-05-2013
0.0
Canopy Latch Handle, Mark Hole Locations. 2
Details
       

 02-04-2013
0.0
Canopy Latch Handle, Prepare Handle, 1
Details
       

 12-09-2012
0.0
Canopy Release Handle mounted vertically.
Details
     

 12-08-2012
0.0
Sub-Panel Complete and Installed in Fuselage.
Details
       

 12-07-2012
0.0
Sub-Panel Revited.
Details
     

 12-06-2012
0.0
Rivet Sub-Panel
Details
       

 12-05-2012
0.0
Rivet Hat Channel/Seal Supports to Sub Panel.
Details
       

 12-04-2012
0.0
Alternative Canopy Release Handle Position.
Details
       

 12-03-2012
0.0
F-643-1 Channel Interference Modification. 2
Details
     

 12-02-2012
0.0
F-643-1 Channel Interference Modification. 1
Details
       

 12-01-2012
0.0
More F-679 Hat Channel Interference.
Details
       

 11-30-2012
0.0
Drilling Canopy Release Shaft and Arm Together.
Details
       

 11-29-2012
0.0
1/2" Hole instrument Panel for jettison Handle.
Details
       

 11-28-2012
0.0
F-643-1 Channel Interference Modification.
Details
     

 11-27-2012
0.0
Bearing Block and Hat Channel Modification.
Details
       

 11-26-2012
0.0
Hinge Pin Interference bottoming out on Short Rib.
Details
       

 11-25-2012
0.0
Dill holes in end of Canopy Release Links.
Details
       

 11-24-2012
0.0
Canopy Release Bearing Block, Fabrication, 2
Details
       

 11-23-2012
0.0
Canopy Release Bearing Block, Fabrication, 1
Details
       

 11-22-2012
0.0
Cut Slots in Canopy Release Steel Links.
Details
       

 11-21-2012
0.0
Remove Threads and Shape Canopy Hinge Pins.
Details
       

 11-20-2012
0.0
Decrease Diameter of WD-619 Release Shaft.
Details
       

 11-19-2012
0.0
Conopy Hinge, Fit Hinge Blocks
Details
       

 11-18-2012
0.0
Canopy Hinge, Fit Hinge Blocks.
Details
       

 11-17-2012
0.0
Canopy Hinge, Drill Hinge Blocks.
Details
       

 11-16-2012
0.0
Canopy Latch, Fabricate C-619 Spacers.
Details
       

 12-13-2009
0.0
Attach rotisserie frame to engine stand.
Details
       

 12-12-2009
0.0
Build rotisserie engine stand attach brace.
Details
       

 12-11-2009
0.0
Build rotisserie firewall frame.
Details
     

 12-04-2009
0.0
Drill engine mount to firewall using bushings.
Details
       

 12-03-2009
0.0
Top engine mount hole to firewall alignment.
Details
       

 12-03-2009
0.0
Bottom engine mount hole to firewall alignment.
Details
       

 12-02-2009
0.0
Clamp engine mount to saw horses for drilling.
Details
       

 11-30-2009
0.0
7 Wing bolts, Cherry max rivets, stack of boxes.
Details
       

 11-30-2009
0.0
6 Just more parts orgainzed in bug boxes.
Details
       

 11-30-2009
0.0
5 Special washers, screws, cotter pins, platenuts.
Details
       

 11-30-2009
0.0
4 Nuts, bolts and washer bug boxes
Details
       

 11-30-2009
0.0
3 Bug boxes filled with parts.
Details
       

 11-30-2009
0.0
2 Another package to break apart.
Details
       

 11-30-2009
0.0
1 Smaller package break down.
Details
       

 11-29-2009
0.0
8 store away the canopy and engine cowl.
Details
     

 11-29-2009
0.0
7 Cleveland wheels and brakes.
Details
       

 11-29-2009
0.0
6 Unwrap packages.
Details
       

 11-29-2009
0.0
5 Small package with engine mount under canopy.
Details
       

 11-29-2009
0.0
4 Remove small packages and cowl.
Details
       

 11-29-2009
0.0
3 Remove small wrapped items.
Details
       

 11-29-2009
0.0
2 Closer look inside finish kit box.
Details
       

 11-29-2009
0.0
1 Pop the top.
Details
       

 11-28-2009
0.0
.....PICKED UP FINISH KIT......
Details
       











Copyright © 2001-2013 Matronics. All Rights Reserved.