KitLog pro

Powered By Kitlog Pro v2.0

Eds Vans RV-6A/7A Web Site
' style=
Date:  12-30-2008
Number of Hours:  0.00
Manual Reference:  
Brief Description:  Aileron - Prime inside of control tubes.

Processed the tubes for primming the inside.

Tube prep.
1.) Used MEK to remove tape residue.
2.) Scotch bright pad the shaft of the larger tube.
3.) Etch clean with Stuart Systems Etch.

Tube prime
4.) Taped shut one end of the tube.
5.) Pour Stuart Systems Primer in the tube. Rotate for full coverage.
6.) Stuck the ends on quickly before the primmer dries. The ends are tight fitting so you better get them on fast.

I'll let the primer dry before I drill the ends for rivets.
' style=

Insides primmed.

Insides primmed.

' style=

Close up view of ends stuck on.

Close up view of ends stuck on.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.