KitLog pro

Powered By Kitlog Pro v2.0

Eds Vans RV-6A/7A Web Site
' style=
Date:  10-27-2009
Number of Hours:  0.00
Manual Reference:  
Brief Description:  Prep forward cabin area, Part2.

Image 1 shows again how I back drill through 1/8” scrap to get holes where I want them. The caliper is actually serving as a clamp as well as proper dimension positioning.

Image 2 shows one of the visual clues that the tunnel is in proper position for and aft. Notice the consistent dimension between the vertical tunnel and firewall.

Image 3 shows the holes in the firewall recess backed drilled through the tunnel. I’ll platenut the firewall recess now.
' style=

Backdrill through 1/8

Backdrill through 1/8" scrap.

' style=

Vertical spacing consistent.

Vertical spacing consistent.

' style=

Drill through firewall recess.

Drill through firewall recess.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.