KitLog pro

Powered By Kitlog Pro v2.0

Eds Vans RV-6A/7A Web Site
' style=
Date:  4-4-2009
Number of Hours:  0.00
Manual Reference:  
Brief Description:  F-712 BH - Match drill 712E to bulkhead.

The vertical placement is called out in the plans. I little confusing though. The dimension line is obscured behind bolt thread lines and it's not obvious what the dimension line is lined up with. A close look and it becomes clear.

No match drilling here. You have to mark it up as per plans. Clamp and drill. I didn't drill the holes that are left open for Vert. Stab Attachment. 2 of these holes need precise positioning to bolt to the vert. stab hinge. I have to think about this a bit.
' style=

Mark, clamp and drill.

Mark, clamp and drill.

' style=

I like it. Happy with this.

I like it. Happy with this.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.