KitLog pro

Powered By Kitlog Pro v2.0

Eddie's Zodiac XL Project
' style=
Date:  11-21-2006
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Right NACA duct installed

Work is a frenzy before Christmas as per usual, and I am working from 10am to 8pm for the next 2 weeks to provide coverage to our overseas projects, which is going to impact on doing any work in the evenings, so.... I got up early this morning to do a little work on the plane before heading off for the day. First job was to install the right NACA duct, too easy after installing the left side the other day. The air vents in the images below where obtained by my friend Dusan from a motor wreckers for around $2 each, it was a great find at the right price. The front ring screws off the body to allow for installation onto an aluminium sheet, and the vents can also be closed by rotating the center knob. Air flow can also be increased or reduced via the same knob and of course they rotate so you can adjust them to the most comfortable position.
' style=

Right NACA duct installed, much easier the second time around

Right NACA duct installed, much easier the second time around

' style=

Air vents from the motor wreckers

Air vents from the motor wreckers

' style=

These are great, but will have to install under the dash as they are a touch large

These are great, but will have to install under the dash as they are a touch large

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.