KitLog pro

Powered By Kitlog Pro v2.0

Eddie's Zodiac XL Project
' style=
Date:  6-15-2007
Number of Hours:  3.50
Manual Reference:  
Brief Description:  Finished front spat installation

I finished the wheel spat installation by first filling the holes I had drilled for thr mounting brackets with some resin miced with chopped strand fibreglass. Once this had cured I re-drilled the holes and then mounted the spats, the mounting system is really quite solid, and I think once they are painted they will look better, or at least I hope they do.
' style=

Right side holes drilled for mounting brackets and screws installed

Right side holes drilled for mounting brackets and screws installed

' style=

Left side holes drilled for mounting brackets and screws installed

Left side holes drilled for mounting brackets and screws installed

' style=

Head on view, I am hoping that after the spats are patched and painted that they will look much better

Head on view, I am hoping that after the spats are patched and painted that they will look much better

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.