KitLog pro

Powered By Kitlog Pro v2.0

Eddie's Zodiac XL Project
' style=
Date:  12-29-2006
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Re-Installed instruments after painting

After the mornings outing and before heading out again for dinner I installed the instruments in the panel, I am still missing a few cap screws which I will get next week, along with the EGT gauge. Also at some point I'll order the radio and GPS cradle mount for the top middle part of the dash...lots of money still to go. I managed to pick up two pre-loved throttle controls from the local aircraft maintenance place, they are from a Cessna, all they needed was to be flushed through with some thinners to remove the built up grease and oil and then some sewing machine oil and they feel like brand new, and the best thing was the price, $10.00...can't argue with that.
' style=

Instrument panel with instruments re-installed

Instrument panel with instruments re-installed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.