KitLog pro

Powered By Kitlog Pro v2.0

Eddie's Zodiac XL Project
' style=
Date:  4-30-2006
Number of Hours:  2.50
Manual Reference:  
Brief Description:  Attach nose ribs and hang nose skin

This morning I started the day by attaching the nose ribs after tehy where deburred, dimpled and coated with Cortec. Once they where pop riveted in place Anne-Marie gave me a hand to lift the nose skin into place under the rear skin, I had previously drilled the front of the rear skin to the main spar and was going to use this as a locating template to back drill the nose skin as can eb seen in image 1. I then extend the rear rib rivet lines onto the nose skin in preparation for drilling the #40 pilot holes
' style=

Nose skin lifted into place

Nose skin lifted into place

' style=

Nose skin O/B view

Nose skin O/B view

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.