Powered By Kitlog Pro v2.0
Eddie's Zodiac XL Project
RV-7
Empennage
65 Logs Found
Date
Hours
Work Log Summary
Details
06-09-2012
9.0
Rigging
Details
09-28-2008
2.0
Etch primed rudder
Details
09-25-2008
1.0
Filled and sanded rudder
Details
09-25-2008
1.0
Filled and sanded Elevators
Details
09-16-2008
2.0
Sand left elevator and TC inspection
09-09-2008
3.0
Right Elevator tip
Details
09-06-2008
2.0
Horizontal stab tips
Details
09-06-2008
1.0
Elevator tips with epoxy filler applied
09-06-2008
2.0
Drilled fiberglass tips to the left and right elev
Details
08-17-2008
4.0
Fitting fiberglass tips to elevator
Details
08-17-2008
1.0
Drilling the elevator horns
Details
07-26-2008
15.0
Right rudder
07-26-2008
0.0
Right elevatror, roll leading edge
Details
07-26-2008
0.0
Right elevator
07-26-2008
0.0
Right elevator
06-09-2008
0.0
Roll the nose skin
Details
06-09-2008
0.0
Rivet the right elevator skin
Details
06-09-2008
8.0
Counter weight
Details
06-08-2008
3.0
Install elevator skeleton
Details
06-07-2008
4.0
Primed and riveted right elevator skin
06-07-2008
0.0
Bend elevator skin and install counter weight
06-01-2008
3.5
Rudder stiffeners
Details
06-01-2008
0.0
Elevator skin dimpled
05-29-2008
1.5
Rolled rudder leading edge
Details
05-29-2008
0.0
Pop rivet forward rudder skins
Details
05-28-2008
1.5
Rivet rudder trailing edge
Details
05-27-2008
1.5
Prosealed wedge into rudder
Details
05-25-2008
0.0
Rudder skin installed
05-25-2008
0.0
Rudder skeleton
05-25-2008
8.0
Assemble rudder skeleton
05-24-2008
2.0
Disaasemble and prep rudder
05-18-2008
0.0
Rudder horn brace
05-18-2008
0.0
Riveting right skins and stiffeners
05-18-2008
0.0
Rivet left rudder skin stiffeners
05-18-2008
6.0
Etch priming skins and stiffeners
05-18-2008
0.0
Assemble rudder skeleton
05-15-2008
1.0
Rudder skin stiffeners
Details
05-14-2008
1.5
VS rear spar
05-13-2008
0.0
VS Skin riveted in place
05-13-2008
1.5
Riveted the skin of the VS
05-12-2008
1.5
Rivet rear spar of VS
05-12-2008
0.0
Front spar riveted
Details
05-11-2008
2.0
Skin the Vertical stabiliser
Details
05-11-2008
1.0
Etch prime Vertical Stab
Details
05-11-2008
2.0
Debur, dimple and counter skin VS
Details
05-11-2008
2.0
Assemble Vertical Stab Skeleton
Details
05-10-2008
3.0
Finished right side of Stab
Details
05-08-2008
2.5
Top surface of skin riveted
Details
05-08-2008
0.5
Rivet left horizontal stab nose rib
Details
05-08-2008
1.0
Rivet HS-708, HS-706 in place
Details
05-01-2008
2.0
Rivet the rear sapr
Details
04-27-2008
2.0
FInished deubrring
Details
04-27-2008
2.0
Etch prime parts
Details
04-27-2008
2.0
Dimple parts
Details
04-26-2008
3.0
Disassemble and deburr
Details
04-24-2008
1.2
Trimed plastic from stab
Details
04-23-2008
1.5
Back drilled HS-404, 405
Details
04-22-2008
1.0
Working on right side of Horizontal stab
Details
04-21-2008
1.5
Back drilled skins to ribs
Details
04-20-2008
3.5
Prepare all horizontal ribs and fit skin
Details
04-20-2008
0.6
Notch HS-404 and fit HS-405
Details
04-18-2008
1.0
Cut and taper HS-710, 714
Details
04-18-2008
1.0
Bend HS-710, 714 to 6 degrees
Details
04-15-2008
1.5
Drilled doublers to #30 and attached ribs
Details
04-12-2008
2.0
Prepared both rear support doublers
Details
SITE NAVIGATION
Contact Builder
RV-7 Home
All
Ailerons
Avionics
Brakes
Canopy
Center Fuselage
Centre spar
Cowling
Empennage
Engine
Fairing
Final Assembly
Firewall
Flap assembly
Flight testing
Front Fuselage
Fuselage
FWF
Instrument panel
Miscellaneous
None
Painting
Prop
Rear turtle deck
Roll Bar
Rudder
Seats
Spinner
Vertical Stab
Wheels and brakes
Wings
Zodiac 601 XL Home
Copyright © 2001-2013 Matronics. All Rights Reserved.