KitLog pro

Powered By Kitlog Pro v2.0

Eddie's Zodiac XL Project
65 Logs Found 
 Date
Hours
Work Log Summary

Details

 06-09-2012
9.0
Rigging
Details
       

 09-28-2008
2.0
Etch primed rudder
Details

 09-25-2008
1.0
Filled and sanded rudder
Details
       

 09-25-2008
1.0
Filled and sanded Elevators
Details
       

 09-16-2008
2.0
Sand left elevator and TC inspection
       

 09-09-2008
3.0
Right Elevator tip
Details
       

 09-06-2008
2.0
Horizontal stab tips
Details
       

 09-06-2008
1.0
Elevator tips with epoxy filler applied
       

 09-06-2008
2.0
Drilled fiberglass tips to the left and right elev
Details
       

 08-17-2008
4.0
Fitting fiberglass tips to elevator
Details
       

 08-17-2008
1.0
Drilling the elevator horns
Details
       

 07-26-2008
15.0
Right rudder
       

 07-26-2008
0.0
Right elevatror, roll leading edge
Details
       

 07-26-2008
0.0
Right elevator
       

 07-26-2008
0.0
Right elevator
       

 06-09-2008
0.0
Roll the nose skin
Details
       

 06-09-2008
0.0
Rivet the right elevator skin
Details
       

 06-09-2008
8.0
Counter weight
Details
       

 06-08-2008
3.0
Install elevator skeleton
Details
       

 06-07-2008
4.0
Primed and riveted right elevator skin
       

 06-07-2008
0.0
Bend elevator skin and install counter weight
       

 06-01-2008
3.5
Rudder stiffeners
Details
       

 06-01-2008
0.0
Elevator skin dimpled
       

 05-29-2008
1.5
Rolled rudder leading edge
Details
       

 05-29-2008
0.0
Pop rivet forward rudder skins
Details
       

 05-28-2008
1.5
Rivet rudder trailing edge
Details
       

 05-27-2008
1.5
Prosealed wedge into rudder
Details
       

 05-25-2008
0.0
Rudder skin installed
       

 05-25-2008
0.0
Rudder skeleton
       

 05-25-2008
8.0
Assemble rudder skeleton
       

 05-24-2008
2.0
Disaasemble and prep rudder
       

 05-18-2008
0.0
Rudder horn brace
       

 05-18-2008
0.0
Riveting right skins and stiffeners
       

 05-18-2008
0.0
Rivet left rudder skin stiffeners
       

 05-18-2008
6.0
Etch priming skins and stiffeners
       

 05-18-2008
0.0
Assemble rudder skeleton
       

 05-15-2008
1.0
Rudder skin stiffeners
Details
       

 05-14-2008
1.5
VS rear spar
       

 05-13-2008
0.0
VS Skin riveted in place
       

 05-13-2008
1.5
Riveted the skin of the VS
       

 05-12-2008
1.5
Rivet rear spar of VS
       

 05-12-2008
0.0
Front spar riveted
Details
       

 05-11-2008
2.0
Skin the Vertical stabiliser
Details
       

 05-11-2008
1.0
Etch prime Vertical Stab
Details
       

 05-11-2008
2.0
Debur, dimple and counter skin VS
Details
       

 05-11-2008
2.0
Assemble Vertical Stab Skeleton
Details
       

 05-10-2008
3.0
Finished right side of Stab
Details
       

 05-08-2008
2.5
Top surface of skin riveted
Details
       

 05-08-2008
0.5
Rivet left horizontal stab nose rib
Details
       

 05-08-2008
1.0
Rivet HS-708, HS-706 in place
Details
       

 05-01-2008
2.0
Rivet the rear sapr
Details
       

 04-27-2008
2.0
FInished deubrring
Details
       

 04-27-2008
2.0
Etch prime parts
Details
       

 04-27-2008
2.0
Dimple parts
Details
       

 04-26-2008
3.0
Disassemble and deburr
Details
       

 04-24-2008
1.2
Trimed plastic from stab
Details
       

 04-23-2008
1.5
Back drilled HS-404, 405
Details
       

 04-22-2008
1.0
Working on right side of Horizontal stab
Details
     

 04-21-2008
1.5
Back drilled skins to ribs
Details
       

 04-20-2008
3.5
Prepare all horizontal ribs and fit skin
Details
       

 04-20-2008
0.6
Notch HS-404 and fit HS-405
Details
       

 04-18-2008
1.0
Cut and taper HS-710, 714
Details
       

 04-18-2008
1.0
Bend HS-710, 714 to 6 degrees
Details
       

 04-15-2008
1.5
Drilled doublers to #30 and attached ribs
Details
       

 04-12-2008
2.0
Prepared both rear support doublers
Details
       











Copyright © 2001-2013 Matronics. All Rights Reserved.