KitLog pro

Powered By Kitlog Pro v2.0

Eddie's Zodiac XL Project
20 Logs Found 
 Date
Hours
Work Log Summary

Details

 05-27-2012
6.0
Plenum bump and nut plates
Details
     

 05-26-2012
5.0
Fitting cooling plenum
Details
       

 05-19-2012
2.0
Stainless cowl pins
Details
       

 02-20-2012
1.5
Top and bottom cowl done
       

 02-19-2012
0.0
Pin holes
Details
       

 02-19-2012
4.5
Filling pin holes
Details
       

 02-18-2012
4.0
Sanding and Re-priming all the fibreglass parts
       

 02-16-2012
10.0
Pinholes
Details
       

 02-03-2012
2.0
Applied epoxy and filler to the cowl, lots of pin

 07-17-2011
1.0
Internal eyebrows
Details
       

 07-16-2011
8.0
Oil door
Details
       

 07-10-2011
4.5
Hinges
Details
       

 07-06-2011
4.4
Riveted hinge and installed camlocs
Details
       

 07-01-2011
9.0
Cowl hinge installation
Details
       

 06-26-2011
5.0
Top and bottom cowl install
Details
       

 06-11-2011
3.5
3. Top cowl hinge
       

 06-11-2011
0.5
2. Top cowl cut
       

 06-11-2011
2.5
1. Top cowl
       

 07-26-2008
0.0
Right elevator skeleton
       

 04-16-2008
1.5
Squeezed rivets for the elevator hinge
Details
       











Copyright © 2001-2013 Matronics. All Rights Reserved.