Powered By Kitlog Pro v2.0
Eddie's Zodiac XL Project
RV-7
Avionics
12 Logs Found
Date
Hours
Work Log Summary
Details
06-30-2012
3.0
Trim over ride switch and other stuff
Details
06-28-2012
8.0
Instrument calibration
Details
01-10-2012
0.5
Labels
01-01-2012
2.0
Lights, strobes and capacitive fuel senders
Details
12-16-2011
3.0
Last of the cockpit wiring
12-10-2011
6.0
Wiring
Details
12-04-2011
12.0
Wiring
Details
11-27-2011
4.0
Dynon pitot and angle of attack probe
Details
11-06-2011
18.0
Wiring
Details
02-18-2011
2.0
Routed pitot, aoa and static lines
Details
10-24-2010
6.0
Wiring the rear of the fuselage
Details
10-20-2010
2.0
ADAHRS Shelf
Details
SITE NAVIGATION
Contact Builder
RV-7 Home
All
Ailerons
Avionics
Brakes
Canopy
Center Fuselage
Centre spar
Cowling
Empennage
Engine
Fairing
Final Assembly
Firewall
Flap assembly
Flight testing
Front Fuselage
Fuselage
FWF
Instrument panel
Miscellaneous
None
Painting
Prop
Rear turtle deck
Roll Bar
Rudder
Seats
Spinner
Vertical Stab
Wheels and brakes
Wings
Zodiac 601 XL Home
Copyright © 2001-2013 Matronics. All Rights Reserved.