Date
|
Hours
|
Work Log Summary

|
Details

|
02-09-2013
|
0.1
|
|
|
 |
|
07-25-2012
|
0.0
|
Door interior/fiberglass
|
|
|
|
07-25-2012
|
0.0
|
Door interior/fiberglass
|
|
|
|
07-25-2012
|
5.0
|
Brake lines, Door interior
|
|
|
|
07-24-2012
|
6.0
|
Landing gear
|
|
|
|
07-24-2012
|
0.0
|
Landing gear
|
|
|
|
07-24-2012
|
0.0
|
Landing gear
|
|
|
|
07-23-2012
|
6.0
|
Landing gear
|
|
|
|
07-23-2012
|
0.0
|
Landing gear
|
|
|
|
07-22-2012
|
4.0
|
Engine mount "mounting"
|
|
|
|
07-20-2012
|
2.0
|
Cowl hinges/Gear
|
|
  |
|
07-18-2012
|
2.5
|
Landing gear assembly
|
|
|
|
07-17-2012
|
2.0
|
Cowl hinges
|
|
  |
|
07-16-2012
|
1.0
|
Cowl hinges
|
|
  |
|
07-15-2012
|
4.0
|
Prep work for firesleeving and anodizing
|
|
|
|
07-13-2012
|
1.0
|
Gear assembly
|
|
  |
|
07-12-2012
|
6.0
|
Left door interior prep, Gear assembly
|
|
|
|
07-08-2012
|
2.0
|
Rivet oil cooler box
|
|
|
|
07-07-2012
|
4.0
|
Door struts, Baggage door seal
|
|
 |
|
07-06-2012
|
2.0
|
Cabin cover attach
|
|
  |
|
06-27-2012
|
10.0
|
OH console, cabin cover attach
|
|
|
|
06-26-2012
|
2.0
|
OH panel upholstery
|
|
|
|
06-25-2012
|
4.0
|
Oil cooler box
|
|
 |
|
06-23-2012
|
4.5
|
Interior panels
|
Details
|
  |
|
06-22-2012
|
5.0
|
Interior panels
|
|
  |
|
06-21-2012
|
2.0
|
Interior panels
|
|
  |
|
06-19-2012
|
1.5
|
Interior panels
|
|
  |
|
06-18-2012
|
1.5
|
Interior panels
|
|
|
|
06-17-2012
|
2.0
|
Interior panels
|
|
|
|
06-16-2012
|
6.0
|
Drilling cabin cover for attachment
|
Details
|
|
|
06-13-2012
|
2.0
|
Tire balancing
|
Details
|
|
|
06-12-2012
|
2.5
|
Overhead done!
|
|
|
|
06-12-2012
|
0.0
|
Overhead done (electrical view)
|
|
|
|
05-26-2012
|
0.0
|
Overhead/cabin cover
|
|
|
|
05-26-2012
|
0.0
|
Overhead/cabin cover
|
|
|
|
05-26-2012
|
10.0
|
Overhead console/cabin cover paint. Headliner trim
|
|
|
|
05-25-2012
|
5.0
|
Overhead/cabin cover priming
|
|
|
|
05-21-2012
|
2.0
|
Landing gear
|
|
|
|
05-20-2012
|
0.0
|
Overhead console
|
|
|
|
05-20-2012
|
8.0
|
Overhead console
|
|
|
|
05-19-2012
|
2.0
|
Overhead console
|
|
|
|
05-18-2012
|
4.0
|
Overhead console
|
|
  |
|
05-17-2012
|
2.0
|
Overhead console
|
|
 |
|
05-16-2012
|
3.0
|
Mid seat rail bracket
|
|
  |
|
05-15-2012
|
0.0
|
Wheel bearings
|
|
|
|
05-15-2012
|
0.0
|
Tires, wheels, bearings
|
|
|
|
05-15-2012
|
2.0
|
Tire, wheel, bearing assembly
|
|
|
|
05-14-2012
|
2.0
|
OH console and wheel assembly
|
|
|
|
05-13-2012
|
5.0
|
Overhead console
|
|
|
|
05-11-2012
|
6.5
|
OH epoxied
|
|
|
|
05-09-2012
|
2.5
|
Cabin cover
|
|
  |
|
05-06-2012
|
2.0
|
OH and electrical
|
|
|
|
05-05-2012
|
3.0
|
OH lighting
|
Details
|
|
|
05-02-2012
|
5.0
|
Overhead console
|
Details
|
|
|
04-29-2012
|
6.5
|
Overhead console, test fit of windshield
|
|
|
|
04-29-2012
|
0.0
|
Overhead console
|
Details
|
|
|
04-26-2012
|
2.0
|
Overhead console
|
|
  |
|
04-22-2012
|
1.0
|
Eyeball lights
|
Details
|
|
|
04-22-2012
|
4.0
|
Cabin cover
|
|
|
|
04-22-2012
|
0.0
|
Cabin cover
|
|
|
|
04-20-2012
|
4.0
|
Cabin cover
|
|
  |
|
04-19-2012
|
1.5
|
Cabin cover
|
|
  |
|
04-18-2012
|
2.0
|
Cabin cover
|
|
  |
|
04-17-2012
|
2.0
|
Cabin cover
|
|
  |
|
04-15-2012
|
4.0
|
Cabin cover
|
|
  |
|
04-14-2012
|
4.5
|
Cabin cover
|
Details
|
|
|
04-11-2012
|
1.0
|
Cabin cover
|
|
  |
|
04-08-2012
|
4.5
|
Cabin cover
|
|
  |
|
04-07-2012
|
3.5
|
Overhead console
|
|
|
|
04-06-2012
|
4.0
|
Cabin cover, Overhead console
|
Details
|
  |
|
04-04-2012
|
4.5
|
Cabin cover
|
|
  |
|
04-03-2012
|
1.0
|
Cabin cover
|
|
  |
|
04-02-2012
|
1.0
|
Cabin cover
|
|
  |
|
04-01-2012
|
1.0
|
Doors lock
|
|
|
|
03-31-2012
|
4.0
|
Doors
|
|
  |
|
03-30-2012
|
7.5
|
Passenger side door lock assembly
|
|
|
|
03-29-2012
|
2.0
|
Doors
|
Details
|
|
|
03-28-2012
|
2.0
|
Door lock mechanism, passenger side
|
Details
|
 |
|
03-26-2012
|
2.7
|
Doors
|
|
  |
|
03-24-2012
|
4.5
|
Doors
|
|
  |
|
03-23-2012
|
2.0
|
Door lock covers
|
|
  |
|
03-21-2012
|
2.0
|
Door locks, cover
|
|
|
|
03-19-2012
|
2.5
|
Door locks
|
|
  |
|
03-18-2012
|
1.0
|
Doors
|
|
  |
|
03-17-2012
|
3.0
|
Doors
|
|
  |
|
03-16-2012
|
2.5
|
Door lock
|
|
  |
|
03-14-2012
|
1.5
|
Doors
|
|
  |
|
03-12-2012
|
2.0
|
Doors
|
|
  |
|
03-10-2012
|
2.5
|
Doors
|
|
  |
|
03-07-2012
|
4.0
|
Doors
|
|
  |
|
03-05-2012
|
2.0
|
Doors
|
|
  |
|
03-04-2012
|
2.5
|
Doors
|
|
  |
|
03-03-2012
|
3.0
|
Doors
|
|
  |
|
03-02-2012
|
5.0
|
Doors
|
|
  |
|
02-22-2012
|
6.0
|
Doors
|
|
|
|
02-22-2012
|
0.0
|
Doors
|
|
 |
|
02-21-2012
|
2.5
|
Doors
|
|
  |
|
02-18-2012
|
3.5
|
Doors
|
|
|
|
02-18-2012
|
0.0
|
Doors
|
|
|
|
02-16-2012
|
2.5
|
Doors
|
|
  |
|
02-15-2012
|
1.0
|
Doors
|
|
  |
|
02-14-2012
|
2.0
|
Door hinges, Planearound instructions
|
|
  |
|
02-11-2012
|
4.0
|
Door hinges
|
|
|
|
02-08-2012
|
2.5
|
Door trimming
|
|
  |
|
02-07-2012
|
2.5
|
Door trimming
|
|
  |
|
02-06-2012
|
2.0
|
Door trim, AP trim module install
|
|
|
|
02-01-2012
|
2.0
|
Door pushrod assembly
|
|
  |
|
01-31-2012
|
3.0
|
Door pushrod assembly
|
Details
|
  |
|
01-30-2012
|
2.0
|
Door handles
|
Details
|
  |
|
01-29-2012
|
3.0
|
Right door halves joined
|
|
  |
|
01-28-2012
|
3.0
|
Left door halves joined
|
|
 |
|
01-27-2012
|
3.0
|
Doors
|
|
  |
|
01-26-2012
|
2.0
|
Doors, AP servo
|
|
|
|
01-26-2012
|
0.0
|
AP servo
|
|
|
|
01-25-2012
|
7.0
|
Doors
|
|
  |
|
01-24-2012
|
2.0
|
Doors
|
|
|
|
01-23-2012
|
2.0
|
Doors
|
|
  |
|
01-22-2012
|
3.0
|
Window/door trimming
|
|
|
|
01-21-2012
|
4.0
|
Cabin door trimming
|
Details
|
|
|
01-16-2012
|
2.0
|
Nutplates, Fuel strainer
|
|
  |
|
01-11-2012
|
6.5
|
Nutplate install on wing root
|
|
  |
|
01-10-2012
|
1.0
|
Marker beacon install
|
|
|
|
01-08-2012
|
2.0
|
Riveting of nav antenna doubler
|
|
  |
|
01-06-2012
|
5.0
|
Nav antenna doubler
|
Details
|
|
|
01-01-2012
|
6.0
|
Wing tip
|
Details
|
 |
|
12-31-2011
|
6.0
|
Left wing tip fiberglass work
|
|
|
|
12-30-2011
|
5.0
|
Left wing tip
|
Details
|
|
|
12-29-2011
|
7.0
|
Left wing tip
|
|
|
|
12-28-2011
|
5.0
|
Wing tip assembly
|
|
|
|
12-27-2011
|
5.0
|
left wing tip
|
|
|
|
12-26-2011
|
5.0
|
Wing tip lens assembly
|
|
  |
|
12-25-2011
|
6.0
|
Duckworks install
|
|
  |
|
12-23-2011
|
4.0
|
Bellcrank to aileron assembly
|
|
  |
|
12-18-2011
|
7.0
|
Duckworks installation
|
|
|
|
12-18-2011
|
0.0
|
Duckworks install
|
|
|
|
12-18-2011
|
0.0
|
Duckworks install
|
|
|
|
12-18-2011
|
0.0
|
Duckworks install
|
|
 |
|
12-17-2011
|
1.0
|
Testing
|
Details
|
 |
|
12-14-2011
|
6.0
|
Aileronbly, flap, torque tube assem
|
Details
|
|
|
12-10-2011
|
4.0
|
Inventory finish kit, tap tie downs, install tank
|
|
  |
|
12-03-2011
|
0.0
|
Synergy Air
|
|
 |
|
12-03-2011
|
0.0
|
My other helper
|
|
|
|
12-03-2011
|
1.0
|
Finish Kit pick up
|
Details
|
|
|
12-02-2011
|
0.0
|
Synergy Air
|
|
|
|
12-02-2011
|
0.0
|
Synergy Air
|
|
|
|
12-02-2011
|
0.0
|
Synergy Air
|
|
|
|
12-02-2011
|
0.0
|
Synergy Air
|
|
|
|
12-02-2011
|
0.0
|
Synergy Air
|
|
|
|
12-02-2011
|
0.0
|
Synergy Air
|
|
|
|
12-02-2011
|
0.0
|
Synergy Air
|
Details
|
|
|
12-02-2011
|
5.0
|
Synergy Air
|
|
|
|
12-02-2011
|
0.0
|
Synergy Air
|
|
|
|
12-01-2011
|
5.0
|
Synergy Air
|
|
|
|
11-30-2011
|
5.0
|
Synergy Air builder assist
|
Details
|
|
|
11-24-2011
|
2.0
|
Aileron torque tube
|
|
  |
|
11-23-2011
|
6.0
|
Fuel tanks
|
Details
|
|
|
11-21-2011
|
2.0
|
Aileron pushrods
|
Details
|
  |
|
11-20-2011
|
6.0
|
Stall switch and aileron pushrods
|
Details
|
|
|
11-19-2011
|
3.0
|
Stall warning switch, aileron pushrod
|
Details
|
 |
|
11-18-2011
|
2.5
|
Fabrication of access hatch
|
Details
|
|
|
11-16-2011
|
1.7
|
Confirmation of QB steps
|
|
  |
|
11-15-2011
|
2.0
|
Confirmation of QB steps
|
|
  |
|
11-14-2011
|
2.5
|
QB wings inspection and confirmation of quality
|
Details
|
  |
|
11-12-2011
|
6.0
|
QB wings inspection and confirmation of quality
|
|
  |
|
10-26-2011
|
1.5
|
Cabin cover
|
|
  |
|
10-21-2011
|
3.0
|
Cabin cover strip, Wing tip electrical schematic
|
|
 |
|
10-16-2011
|
4.0
|
Cabin drilling
|
Details
|
|
|
10-12-2011
|
4.0
|
Cabin top drilling
|
|
  |
|
10-10-2011
|
1.7
|
Cabin top trimming
|
|
|
|
10-09-2011
|
4.5
|
Cabin top trimming
|
|
|
|
10-07-2011
|
3.0
|
Cabin top trimming
|
|
  |
|
10-06-2011
|
2.0
|
Cabin top trimming
|
|
  |
|
10-03-2011
|
0.0
|
Sorry for the delay in updates!
|
Details
|
  |
|
10-03-2011
|
2.0
|
Cabin top trimming
|
|
  |
|
10-02-2011
|
3.0
|
Cabin Cover
|
Details
|
 |
|
09-28-2011
|
5.0
|
Flap system
|
Details
|
|
|
09-27-2011
|
2.5
|
Flap System
|
Details
|
|
|
09-26-2011
|
2.0
|
Elevator control rod installation
|
|
  |
|
09-23-2011
|
4.0
|
Control system
|
|
|
|
09-23-2011
|
1.0
|
Control system
|
|
|
|
09-22-2011
|
2.0
|
Control system
|
|
  |
|
09-20-2011
|
1.5
|
Control System
|
Details
|
  |
|
09-19-2011
|
2.0
|
Fairings
|
Details
|
 |
|
09-18-2011
|
6.0
|
|
|
  |
|
09-17-2011
|
2.0
|
Fuel valve and line work
|
|
  |
|
09-16-2011
|
3.0
|
Valve bracket continued
|
|
 |
|
09-15-2011
|
2.0
|
Brake line and andair fuel valve install
|
Details
|
|
|
09-14-2011
|
5.0
|
Tunnel insulation/seats
|
|
  |
|
09-13-2011
|
2.0
|
Rudder/Brake assembly
|
Details
|
|
|
09-12-2011
|
2.2
|
Rudder pedal frame assembly
|
|
  |
|
09-11-2011
|
3.0
|
Interior paint!
|
Details
|
|
|
09-11-2011
|
3.0
|
Interior paint
|
|
|
|
09-10-2011
|
3.0
|
Interior prep for paint
|
|
  |
|
09-09-2011
|
3.0
|
Interior prep for paint
|
|
  |
|
09-07-2011
|
2.0
|
Interior prep for paint
|
|
  |
|
09-06-2011
|
2.0
|
Interior prep for paint
|
|
  |
|
09-05-2011
|
2.5
|
Interior prep for paint
|
|
  |
|
09-02-2011
|
5.5
|
Rear seat fabrication
|
|
 |
|
09-01-2011
|
1.2
|
Rear seat fabrication
|
|
  |
|
08-31-2011
|
6.0
|
Rudder cables
|
Details
|
|
|
08-31-2011
|
0.5
|
Rudder cable fairings
|
|
|
|
08-30-2011
|
2.5
|
Rudder pedal brackets
|
|
  |
|
08-29-2011
|
2.4
|
Rudder pedals, Heater boxes
|
Details
|
 |
|
08-28-2011
|
8.0
|
Tunnel access panel/Paint booth
|
Details
|
|
|
08-26-2011
|
5.0
|
Access panel to tunnel
|
Details
|
|
|
08-25-2011
|
2.0
|
Fuel lines in the tunnel
|
Details
|
  |
|
08-24-2011
|
2.0
|
Access covers
|
|
  |
|
08-23-2011
|
2.0
|
Access covers
|
Details
|
|
|
08-13-2011
|
2.0
|
Access covers
|
Details
|
 |
|
08-12-2011
|
2.0
|
Baggage door hinge, rear floors
|
|
|
|
08-10-2011
|
2.0
|
Rivet rear floors
|
|
|
|
08-07-2011
|
3.5
|
Baggage door
|
|
  |
|
08-06-2011
|
4.0
|
Baggage door
|
|
  |
|
08-05-2011
|
5.0
|
Baggage door
|
|
 |
|
08-04-2011
|
2.0
|
Baggage door
|
|
  |
|
08-03-2011
|
4.5
|
Baggage door
|
|
|
|
08-02-2011
|
2.0
|
Baggage bulkhead corrugation
|
|
  |
|
08-01-2011
|
2.0
|
Baggage area
|
|
|
|
07-31-2011
|
7.5
|
Baggage area panels
|
|
|
|
07-30-2011
|
2.0
|
Baggage floor riveting
|
|
|
|
07-26-2011
|
4.0
|
Baggage floor riveting
|
|
|
|
07-18-2011
|
2.0
|
String pulled thru conduit. L access panel riveted
|
|
  |
|
07-17-2011
|
3.0
|
Step re-do
|
Details
|
|
|
07-17-2011
|
1.0
|
Fuselage stand
|
Details
|
|
|
07-10-2011
|
5.0
|
Continued work in the baggage area
|
Details
|
|
|
07-08-2011
|
2.0
|
Continued work in the baggage area
|
Details
|
|
|
07-04-2011
|
4.5
|
Baggage area work
|
Details
|
|
|
07-03-2011
|
2.0
|
Drilled ribs for conduit
|
Details
|
  |
|
07-02-2011
|
2.0
|
Fabricated 2 adel brackets
|
|
  |
|
07-01-2011
|
5.5
|
Step bushings, gear access panel
|
|
  |
|
06-25-2011
|
3.0
|
Baggage area
|
|
  |
|
06-24-2011
|
3.0
|
Baggage floors
|
|
  |
|
06-22-2011
|
1.7
|
Baggage floors
|
|
  |
|
06-21-2011
|
1.0
|
Baggage door assembly
|
|
  |
|
06-14-2011
|
2.5
|
Tailcone attachment complete!
|
Details
|
|
|
06-13-2011
|
2.0
|
Riveting tailcone
|
|
  |
|
06-12-2011
|
6.0
|
Tailcone
|
Details
|
  |
|
06-08-2011
|
6.5
|
Tailcone attach
|
|
  |
|
06-07-2011
|
1.5
|
Left gear weldment
|
Details
|
|
|
06-06-2011
|
2.0
|
Right gear weldment reinstall
|
|
  |
|
06-05-2011
|
4.0
|
Tailcone attach
|
Details
|
  |
|
06-04-2011
|
1.0
|
Floor sound proofing
|
|
|
|
06-03-2011
|
6.5
|
Vents and insulation
|
Details
|
|
|
06-01-2011
|
2.0
|
Upper forward fuselage
|
Details
|
  |
|
05-31-2011
|
2.0
|
Step installation
|
Details
|
|
|
05-30-2011
|
3.0
|
Baggage angle riveting
|
|
  |
|
05-29-2011
|
4.5
|
Verification of QB fuselage
|
|
  |
|
05-28-2011
|
1.5
|
Verification of QB fuselage
|
|
  |
|
05-27-2011
|
2.0
|
Verification of QB fuselage
|
|
  |
|
05-20-2011
|
0.1
|
Pictures of the HS tips
|
|
|
|
05-20-2011
|
4.0
|
HS tips were ready for priming
|
Details
|
|
|
05-05-2011
|
1.0
|
Fiberglass work on the tips continued
|
Details
|
  |
|
05-04-2011
|
2.0
|
Fiberglass work on the tips continued
|
Details
|
  |
|
04-30-2011
|
2.0
|
Landing gear removal continued
|
Details
|
  |
|
04-29-2011
|
1.5
|
Landing gear removal
|
Details
|
|
|
04-28-2011
|
2.0
|
Verification of QB fuselage construction
|
Details
|
|
|
04-27-2011
|
7.4
|
Emp tips and brake lines
|
Details
|
|
|
04-26-2011
|
2.0
|
Further work on the empennage tips
|
Details
|
|
|
04-25-2011
|
2.2
|
Fiberglass work on the empennage tips
|
Details
|
|
|
04-24-2011
|
4.0
|
Miscellaneous
|
Details
|
|
|
04-23-2011
|
2.5
|
NACA vents
|
Details
|
|
|
04-22-2011
|
4.0
|
Brake lines
|
Details
|
  |
|
04-21-2011
|
3.7
|
Emp tips
|
|
  |
|
04-13-2011
|
2.0
|
QB inspection
|
|
|
|
04-12-2011
|
2.0
|
QB inspection
|
|
|
|
04-11-2011
|
2.0
|
QB fuselage inspection
|
|
|
|
04-10-2011
|
0.1
|
QB assembly error?
|
|
|
|
04-10-2011
|
0.1
|
QB assembly error
|
|
|
|
04-10-2011
|
5.0
|
Disassembly of QB fuselage floor panels
|
Details
|
|
|
04-08-2011
|
3.0
|
Fiberglass work
|
|
  |
|
04-05-2011
|
1.0
|
Fiberglass work on tips
|
|
  |
|
04-04-2011
|
2.0
|
Emp tips
|
|
  |
|
04-03-2011
|
7.0
|
Empennage fairing final install
|
|
  |
|
03-31-2011
|
1.5
|
Empennage fairing
|
|
|
|
03-30-2011
|
4.5
|
Empennage fairing
|
|
|
|
03-29-2011
|
1.3
|
Empennage fairing
|
Details
|
|
|
03-28-2011
|
2.0
|
Emp gap seal
|
Details
|
|
|
03-27-2011
|
2.5
|
Empennage tips
|
|
  |
|
03-25-2011
|
5.0
|
Empennage tips
|
|
  |
|
03-24-2011
|
1.5
|
Empennage tips
|
Details
|
|
|
03-21-2011
|
1.5
|
Empennage tips
|
Details
|
|
|
03-18-2011
|
0.0
|
Synergy Air
|
Details
|
|
|
03-12-2011
|
1.0
|
Trim cable installation
|
|
  |
|
03-11-2011
|
2.0
|
Trim cable installation
|
|
  |
|
03-09-2011
|
1.2
|
Trim servo mount
|
Details
|
  |
|
03-08-2011
|
2.0
|
Trim servo linkage
|
|
  |
|
03-06-2011
|
3.0
|
Elevator trim servo mount
|
Details
|
  |
|
03-04-2011
|
1.5
|
Fabrication of trim cable anchor
|
|
  |
|
03-02-2011
|
5.0
|
VS, rudder and pushrod install
|
Details
|
|
|
02-24-2011
|
6.0
|
Vertical stabilizer attachment to tailcone
|
Details
|
  |
|
02-23-2011
|
1.3
|
Drilling the HS attachments
|
Details
|
 |
|
02-22-2011
|
1.3
|
HS alignment
|
Details
|
|
|
02-21-2011
|
2.0
|
HS attachment
|
Details
|
|
|
02-20-2011
|
4.0
|
Elevator attachment to horiz stabilizer
|
Details
|
|
|
02-18-2011
|
2.5
|
AHRS mount completion
|
|
 |
|
02-17-2011
|
2.0
|
AHRS mount installation
|
Details
|
|
|
02-16-2011
|
2.0
|
Battery mount and bellcrank install
|
Details
|
|
|
02-13-2011
|
6.0
|
Riveting tailcone
|
Details
|
|
|
02-11-2011
|
2.0
|
Riveting tailcone
|
|
|
|
02-09-2011
|
2.0
|
Riveting tailcone
|
|
  |
|
02-08-2011
|
1.5
|
Riveting tailcone
|
|
  |
|
02-07-2011
|
3.5
|
Riveting tailcone
|
Details
|
  |
|
02-04-2011
|
4.0
|
Riveting tailcone
|
|
|
|
01-28-2011
|
6.0
|
Riveting tailcone
|
Details
|
|
|
01-27-2011
|
3.0
|
Riveting the tailcone
|
Details
|
|
|
01-26-2011
|
2.5
|
Cleco tailcone assembly
|
Details
|
|
|
01-25-2011
|
2.0
|
Riveted...
|
Details
|
 |
|
01-24-2011
|
2.0
|
Riveted battery mount/Bulkhead
|
Details
|
|
|
01-23-2011
|
1.0
|
Riveting at last
|
Details
|
|
|
01-22-2011
|
6.5
|
Priming!
|
Details
|
  |
|
01-21-2011
|
2.0
|
Prep to prime
|
Details
|
  |
|
01-18-2011
|
3.0
|
More dimpling...and prep work to prime
|
Details
|
  |
|
01-17-2011
|
1.0
|
More skin dimpling
|
|
  |
|
01-16-2011
|
1.2
|
Skin dimpling
|
Details
|
  |
|
01-10-2011
|
2.0
|
Dimpling stiffeners
|
Details
|
  |
|
01-09-2011
|
3.0
|
Dimpling, bellcrank assemb and batt mount
|
Details
|
|
|
01-09-2011
|
3.0
|
Dimpling, bellcrank and batt assembly
|
Details
|
|
|
01-01-2011
|
1.0
|
Csk and dimpling
|
Details
|
  |
|
12-31-2010
|
2.0
|
Dimpling begins!
|
|
  |
|
12-30-2010
|
2.5
|
Deburring
|
|
  |
|
12-29-2010
|
5.7
|
Deburring
|
|
  |
|
12-28-2010
|
2.0
|
Deburring
|
Details
|
  |
|
12-27-2010
|
3.0
|
Drilling
|
Details
|
  |
|
12-26-2010
|
2.0
|
Elevator stop and aft deck
|
Details
|
|
|
12-24-2010
|
4.5
|
Top skins
|
Details
|
|
|
12-23-2010
|
3.7
|
Aft deck
|
Details
|
  |
|
12-21-2010
|
2.0
|
Final drilling
|
Details
|
  |
|
12-19-2010
|
2.5
|
Left skin, stiffeners, and rudder brace
|
|
|
|
12-19-2010
|
1.0
|
BH to bellcrank rib drilling, baggage BH channel
|
|
  |
|
12-18-2010
|
1.5
|
New shop lights
|
Details
|
|
|
12-17-2010
|
5.5
|
Stiffeners
|
Details
|
|
|
12-16-2010
|
2.5
|
Bellcrank ribs
|
Details
|
|
|
12-15-2010
|
2.5
|
Beginning the tailcone assembly
|
|
|
|
12-14-2010
|
0.2
|
Longerons
|
Details
|
  |
|
12-12-2010
|
3.0
|
Longerons
|
Details
|
  |
|
12-11-2010
|
3.0
|
Stiffeners
|
Details
|
  |
|
12-10-2010
|
3.0
|
HS attachment angle drilling
|
|
  |
|
12-10-2010
|
1.0
|
Bulkheads and stiffeners
|
Details
|
|
|
12-05-2010
|
1.0
|
Elevator completion
|
|
 |
|
12-04-2010
|
4.5
|
Piano hinges
|
Details
|
|
|
11-30-2010
|
1.2
|
Deburr frames
|
|
  |
|
11-30-2010
|
2.0
|
Bulkhead deburring and prep
|
|
 |
|
11-28-2010
|
2.0
|
Tapping AEX block for fuselage tie down
|
Details
|
|
|
11-28-2010
|
0.1
|
Fabricate alum angle
|
|
  |
|
11-28-2010
|
2.0
|
Drill AEX block to bulkhead
|
Details
|
|
|
11-26-2010
|
0.5
|
Drill piano hinge and holes
|
|
  |
|
11-25-2010
|
3.5
|
Prime TT, rivet, seal, and rivet tabs
|
Details
|
|
|
11-24-2010
|
3.0
|
Deburr, dimple, and countersink trim tabs
|
|
|
|
11-22-2010
|
2.0
|
Trim tab horns and final drill TT skins
|
|
  |
|
11-21-2010
|
2.0
|
T.E. bend, Trim tab bends, drill tabs, 15 degree b
|
Details
|
|
|
11-21-2010
|
2.0
|
Lead counterweights bolted on
|
|
  |
|
11-19-2010
|
1.5
|
Left elevator leading edge roll
|
|
  |
|
11-17-2010
|
2.5
|
Riveting of the elevator
|
Details
|
|
|
11-16-2010
|
2.0
|
Remove sealant, Trailing edge rivets
|
Details
|
  |
|
11-14-2010
|
1.5
|
Brake building and trim skin scuffin'
|
Details
|
|
|
11-13-2010
|
1.0
|
Trim cable anchors and foam ribs
|
Details
|
  |
|
11-12-2010
|
2.0
|
Trim tab templates/blocks
|
Details
|
  |
|
11-10-2010
|
4.0
|
Tip rib assembly
|
Details
|
  |
|
11-07-2010
|
2.5
|
Skin to root rib
|
Details
|
  |
|
11-07-2010
|
3.0
|
Riveting rib halves and skins
|
Details
|
  |
|
11-05-2010
|
2.0
|
Skin to rear spar riveting took place with the cus
|
Details
|
  |
|
11-02-2010
|
1.0
|
Riveted elevator gussets to rear spar
|
Details
|
  |
|
11-01-2010
|
2.0
|
Sketched out trim tab jigs
|
Details
|
  |
|
10-31-2010
|
0.3
|
Riveting
|
Details
|
  |
|
10-27-2010
|
0.5
|
Rear spar rivets complete
|
|
  |
|
10-26-2010
|
2.1
|
Rib halves-to-skin riveted, rear spar rivets place
|
Details
|
|
|
10-25-2010
|
2.5
|
Riveting
|
Details
|
|
|
10-24-2010
|
1.5
|
Riveting the tip ribs
|
|
 |
|
10-24-2010
|
2.5
|
Riveting
|
Details
|
|
|
10-24-2010
|
3.0
|
Priming
|
Details
|
  |
|
10-22-2010
|
3.0
|
Priming
|
Details
|
  |
|
10-20-2010
|
3.0
|
Elevator assembly
|
Details
|
  |
|
10-17-2010
|
1.5
|
Front and rear spar dimpling and countersinking
|
|
  |
|
10-17-2010
|
1.0
|
Dimpling
|
|
  |
|
10-17-2010
|
1.5
|
Dimpling
|
Details
|
  |
|
10-15-2010
|
6.0
|
Deburring and dimpling
|
Details
|
 |
|
10-14-2010
|
2.5
|
Deburring and dimpling
|
Details
|
  |
|
10-12-2010
|
1.2
|
Deburring
|
Details
|
  |
|
10-11-2010
|
2.1
|
Deburring
|
Details
|
  |
|
10-10-2010
|
3.5
|
Deburring
|
Details
|
 |
|
10-08-2010
|
2.0
|
Elevator disassembly
|
Details
|
 |
|
09-29-2010
|
1.0
|
VA-140 trailing edge installation, elevator horn i
|
|
  |
|
09-29-2010
|
3.7
|
Final drilling of skins
|
Details
|
  |
|
09-28-2010
|
2.0
|
Elevator construction
|
|
 |
|
09-27-2010
|
1.2
|
|
|
|
|
09-26-2010
|
2.5
|
Elevator prelim assembly
|
Details
|
|
|
09-20-2010
|
1.0
|
|
|
  |
|
09-18-2010
|
3.0
|
Rudder counterbalance assembly
|
Details
|
|
|
09-18-2010
|
1.0
|
Completion of the Rudder!
|
Details
|
|
|
09-17-2010
|
7.0
|
Rudder riveting
|
Details
|
 |
|
09-16-2010
|
6.5
|
Deburr elev, Rivet
|
Details
|
  |
|
09-14-2010
|
1.5
|
Deburring elevator parts
|
|
  |
|
09-13-2010
|
1.5
|
Deburring elevator parts
|
|
  |
|
09-12-2010
|
1.5
|
Deburring elevator parts
|
|
  |
|
09-11-2010
|
2.0
|
Deburring elevator
|
Details
|
  |
|
09-10-2010
|
2.5
|
Elevator parts - Deburring
|
Details
|
  |
|
09-07-2010
|
2.0
|
Rudder trailing edge
|
Details
|
  |
|
09-06-2010
|
3.0
|
Rudder trailing edges
|
Details
|
|
|
09-05-2010
|
1.0
|
Continued from previous post
|
|
|
|
09-05-2010
|
3.0
|
Back riveting rudder stiffeners
|
Details
|
|
|
09-03-2010
|
0.0
|
Pictures of the completed horizontal stabilizer
|
Details
|
|
|
09-03-2010
|
1.5
|
Completion of the HS
|
Details
|
|
|
09-02-2010
|
2.0
|
Inventory
|
Details
|
  |
|
09-01-2010
|
3.5
|
Inventory
|
Details
|
  |
|
08-30-2010
|
1.5
|
Inventory
|
Details
|
  |
|
08-26-2010
|
5.0
|
Storage and Inventory
|
Details
|
|
|
08-22-2010
|
0.0
|
Hanging the Horizontal Stabilizer
|
|
|
|
08-18-2010
|
1.5
|
Rear spar to skin riveting
|
Details
|
  |
|
08-14-2010
|
5.0
|
HS Riveting
|
Details
|
  |
|
08-08-2010
|
2.0
|
Riveting
|
Details
|
  |
|
08-04-2010
|
0.0
|
QB fuselage and wings delivery!
|
Details
|
|
|
08-04-2010
|
0.0
|
QB fuselage and wings delivery!
|
Details
|
|
|
08-04-2010
|
0.0
|
More pics of the QB delivery
|
|
|
|
08-01-2010
|
1.5
|
Wing cradle
|
Details
|
|
|
07-31-2010
|
2.0
|
Riveting HS skin to HS front spar
|
Details
|
  |
|
07-18-2010
|
2.5
|
Riveting front spar to nose ribs
|
|
 |
|
07-16-2010
|
2.5
|
Riveting nose ribs
|
|
|
|
07-10-2010
|
3.5
|
Riveting
|
Details
|
|
|
07-07-2010
|
6.0
|
Countersinking and Priming
|
Details
|
|
|
07-03-2010
|
2.0
|
Dimpling
|
Details
|
  |
|
07-02-2010
|
4.0
|
Disassembly of HS, deburring
|
Details
|
  |
|
06-30-2010
|
1.5
|
Final drilling skins
|
Details
|
  |
|
06-29-2010
|
2.0
|
Final drilling the skins
|
Details
|
  |
|
06-28-2010
|
3.0
|
HS skin attachment
|
|
 |
|
06-21-2010
|
5.0
|
Final drilling, assemble of HS
|
Details
|
  |
|
06-20-2010
|
4.5
|
Deburred HS1004/HS 904 inspar ribs
|
|
  |
|
06-19-2010
|
3.0
|
Riveting HS front spar
|
Details
|
  |
|
06-18-2010
|
6.0
|
HS Front spar
|
Details
|
  |
|
06-16-2010
|
2.0
|
Deburring of HS-1004 inspar ribs
|
|
  |
|
06-13-2010
|
2.0
|
Nose ribs, Cradle fabrication
|
Details
|
  |
|
06-09-2010
|
3.0
|
HS Nose ribs
|
Details
|
  |
|
06-07-2010
|
2.0
|
Deburr inspar ribs
|
Details
|
  |
|
06-06-2010
|
3.0
|
HS ribs
|
Details
|
  |
|
06-05-2010
|
2.5
|
Deburring
|
Details
|
|
|
06-04-2010
|
5.0
|
HS front spar and caps
|
Details
|
 |
|
06-03-2010
|
0.2
|
Compressor failure/replacement
|
Details
|
  |
|
06-02-2010
|
2.0
|
Deburred HS front spar
|
Details
|
  |
|
06-01-2010
|
2.0
|
HS stringers, spar caps, etc deburred
|
|
  |
|
05-31-2010
|
5.0
|
L/R front spar bracket drilling
|
Details
|
  |
|
05-30-2010
|
2.0
|
Left front spar bracket fabrication
|
Details
|
  |
|
05-29-2010
|
2.0
|
HS riveting and flange bearing addition
|
|
  |
|
05-18-2010
|
2.0
|
Priming HS rear spar and doubler
|
|
  |
|
05-17-2010
|
2.0
|
HS Rear spar drilling, countersinking
|
|
  |
|
05-12-2010
|
5.0
|
HS rear spar deburring
|
Details
|
  |
|
05-08-2010
|
1.0
|
Riveting rudder
|
Details
|
  |
|
05-05-2010
|
1.5
|
VS completed!
|
Details
|
|
|
05-04-2010
|
1.5
|
Riveting VS skin/spar
|
Details
|
  |
|
05-01-2010
|
0.5
|
Riveting
|
Details
|
 |
|
04-26-2010
|
2.0
|
Riveting VS skin
|
Details
|
  |
|
04-25-2010
|
2.5
|
Riveting VS
|
Details
|
 |
|
04-24-2010
|
4.0
|
Riveting the VS rear spar
|
Details
|
|
|
04-24-2010
|
1.0
|
Further riveting
|
Details
|
|
|
04-23-2010
|
3.0
|
Prep and Prime
|
Details
|
  |
|
04-21-2010
|
2.0
|
Scotchbrite rudder assembly
|
|
  |
|
04-18-2010
|
6.0
|
Rudder deburring, countersinking
|
Details
|
|
|
04-15-2010
|
2.0
|
Rudder work
|
Details
|
  |
|
04-14-2010
|
1.5
|
Rudder skin
|
Details
|
|
|
04-12-2010
|
2.0
|
Assembled rudder skeleton
|
Details
|
 |
|
04-10-2010
|
5.0
|
Rudder assembly
|
Details
|
|
|
04-08-2010
|
2.0
|
Rudder assembly
|
|
  |
|
04-07-2010
|
2.0
|
Rudder stiffeners, Rudder horn prep
|
Details
|
  |
|
04-05-2010
|
1.5
|
Rudder stiffener prep
|
Details
|
  |
|
04-04-2010
|
2.5
|
EAA Tech Counselor visit
|
Details
|
  |
|
04-03-2010
|
1.0
|
Beginning construction of rudder
|
Details
|
  |
|
04-01-2010
|
1.5
|
Front spar doubler, dimpling, rudder stops
|
|
  |
|
03-31-2010
|
5.0
|
Dimpling, deburring, drilling VS skin/skeleton
|
Details
|
  |
|
03-26-2010
|
2.0
|
Final drilling
|
Details
|
  |
|
03-24-2010
|
2.0
|
Vertical stabilizer skeleton and skin
|
Details
|
|
|
03-23-2010
|
2.0
|
Deburring
|
Details
|
  |
|
03-22-2010
|
1.5
|
Deburr ribs
|
Details
|
  |
|
03-21-2010
|
1.5
|
Countersinking doubler
|
Details
|
  |
|
03-20-2010
|
1.5
|
Rear spar doubler and hinge brackets
|
Details
|
  |
|
03-19-2010
|
7.0
|
Construction begins!
|
Details
|
|
|
03-17-2010
|
2.0
|
Tool instruction and demo
|
Details
|
  |
|
03-17-2010
|
2.5
|
Paint booth completion
|
Details
|
|
|
03-16-2010
|
2.0
|
Paint booth construction
|
Details
|
  |
|
03-15-2010
|
2.5
|
Paint booth construction
|
Details
|
  |
|
03-14-2010
|
2.0
|
Back rivet table
|
Details
|
  |
|
03-13-2010
|
0.5
|
Shop complete!
|
Details
|
|
|
03-13-2010
|
3.0
|
DRDT-2 table, Back rivet table
|
Details
|
|
|
03-12-2010
|
1.5
|
Final stages of shop prep
|
Details
|
  |
|
03-08-2010
|
1.0
|
Tool arrival, DRDT-2 assembly
|
Details
|
  |
|
03-07-2010
|
0.3
|
HVLP spray gun purchase
|
Details
|
  |
|
03-06-2010
|
1.0
|
Floor mat purchase
|
Details
|
  |
|
03-05-2010
|
4.0
|
Electrical consult, Tool kit arrival
|
Details
|
  |
|
03-03-2010
|
5.0
|
Tool purchase
|
Details
|
  |
|
03-01-2010
|
3.0
|
Air compressor installation
|
Details
|
|
|
02-28-2010
|
4.0
|
Tool research and purchasing
|
Details
|
  |
|
02-27-2010
|
8.0
|
Synergy Air Class
|
Details
|
 |
|
02-27-2010
|
1.5
|
Research
|
Details
|
  |
|
02-25-2010
|
2.0
|
Inventory, Labeling, Consultation
|
Details
|
  |
|
02-24-2010
|
2.0
|
Inventory
|
Details
|
  |
|
02-23-2010
|
1.0
|
Hardware inventory
|
|
  |
|
02-22-2010
|
2.0
|
Inventory
|
Details
|
 |
|
02-19-2010
|
0.5
|
Empennage arrives
|
Details
|
|
|
02-18-2010
|
0.3
|
Empennage ready for pick up
|
Details
|
  |
|
02-14-2010
|
1.0
|
Shop prep continued
|
Details
|
  |
|
02-13-2010
|
2.0
|
Shop prep
|
Details
|
  |
|
02-07-2010
|
6.0
|
Shop work continued
|
Details
|
  |
|
02-06-2010
|
4.0
|
First day of shop prep
|
Details
|
|