Date
|
Hours
|
Work Log Summary

|
Details

|
07-25-2012
|
0.0
|
Door interior/fiberglass
|
|
|
|
07-25-2012
|
0.0
|
Door interior/fiberglass
|
|
|
|
07-25-2012
|
5.0
|
Brake lines, Door interior
|
|
|
|
07-24-2012
|
6.0
|
Landing gear
|
|
|
|
07-24-2012
|
0.0
|
Landing gear
|
|
|
|
07-24-2012
|
0.0
|
Landing gear
|
|
|
|
07-23-2012
|
6.0
|
Landing gear
|
|
|
|
07-23-2012
|
0.0
|
Landing gear
|
|
|
|
07-22-2012
|
4.0
|
Engine mount "mounting"
|
|
|
|
07-20-2012
|
2.0
|
Cowl hinges/Gear
|
|
  |
|
07-18-2012
|
2.5
|
Landing gear assembly
|
|
|
|
07-17-2012
|
2.0
|
Cowl hinges
|
|
  |
|
07-16-2012
|
1.0
|
Cowl hinges
|
|
  |
|
07-15-2012
|
4.0
|
Prep work for firesleeving and anodizing
|
|
|
|
07-13-2012
|
1.0
|
Gear assembly
|
|
  |
|
07-12-2012
|
6.0
|
Left door interior prep, Gear assembly
|
|
|
|
07-07-2012
|
4.0
|
Door struts, Baggage door seal
|
|
 |
|
07-06-2012
|
2.0
|
Cabin cover attach
|
|
  |
|
06-27-2012
|
10.0
|
OH console, cabin cover attach
|
|
|
|
06-26-2012
|
2.0
|
OH panel upholstery
|
|
|
|
06-23-2012
|
4.5
|
Interior panels
|
Details
|
  |
|
06-22-2012
|
5.0
|
Interior panels
|
|
  |
|
06-21-2012
|
2.0
|
Interior panels
|
|
  |
|
06-19-2012
|
1.5
|
Interior panels
|
|
  |
|
06-18-2012
|
1.5
|
Interior panels
|
|
|
|
06-17-2012
|
2.0
|
Interior panels
|
|
|
|
06-16-2012
|
6.0
|
Drilling cabin cover for attachment
|
Details
|
|
|
06-13-2012
|
2.0
|
Tire balancing
|
Details
|
|
|
06-12-2012
|
2.5
|
Overhead done!
|
|
|
|
06-12-2012
|
0.0
|
Overhead done (electrical view)
|
|
|
|
05-26-2012
|
0.0
|
Overhead/cabin cover
|
|
|
|
05-26-2012
|
0.0
|
Overhead/cabin cover
|
|
|
|
05-26-2012
|
10.0
|
Overhead console/cabin cover paint. Headliner trim
|
|
|
|
05-25-2012
|
5.0
|
Overhead/cabin cover priming
|
|
|
|
05-21-2012
|
2.0
|
Landing gear
|
|
|
|
05-20-2012
|
0.0
|
Overhead console
|
|
|
|
05-20-2012
|
8.0
|
Overhead console
|
|
|
|
05-19-2012
|
2.0
|
Overhead console
|
|
|
|
05-18-2012
|
4.0
|
Overhead console
|
|
  |
|
05-17-2012
|
2.0
|
Overhead console
|
|
 |
|
05-16-2012
|
3.0
|
Mid seat rail bracket
|
|
  |
|
05-15-2012
|
0.0
|
Wheel bearings
|
|
|
|
05-15-2012
|
0.0
|
Tires, wheels, bearings
|
|
|
|
05-15-2012
|
2.0
|
Tire, wheel, bearing assembly
|
|
|
|
05-14-2012
|
2.0
|
OH console and wheel assembly
|
|
|
|
05-13-2012
|
5.0
|
Overhead console
|
|
|
|
05-11-2012
|
6.5
|
OH epoxied
|
|
|
|
05-09-2012
|
2.5
|
Cabin cover
|
|
  |
|
05-06-2012
|
2.0
|
OH and electrical
|
|
|
|
05-02-2012
|
5.0
|
Overhead console
|
Details
|
|
|
04-29-2012
|
6.5
|
Overhead console, test fit of windshield
|
|
|
|
04-29-2012
|
0.0
|
Overhead console
|
Details
|
|
|
04-26-2012
|
2.0
|
Overhead console
|
|
  |
|
04-22-2012
|
4.0
|
Cabin cover
|
|
|
|
04-22-2012
|
0.0
|
Cabin cover
|
|
|
|
04-20-2012
|
4.0
|
Cabin cover
|
|
  |
|
04-19-2012
|
1.5
|
Cabin cover
|
|
  |
|
04-18-2012
|
2.0
|
Cabin cover
|
|
  |
|
04-17-2012
|
2.0
|
Cabin cover
|
|
  |
|
04-15-2012
|
4.0
|
Cabin cover
|
|
  |
|
04-14-2012
|
4.5
|
Cabin cover
|
Details
|
|
|
04-11-2012
|
1.0
|
Cabin cover
|
|
  |
|
04-08-2012
|
4.5
|
Cabin cover
|
|
  |
|
04-07-2012
|
3.5
|
Overhead console
|
|
|
|
04-06-2012
|
4.0
|
Cabin cover, Overhead console
|
Details
|
  |
|
04-04-2012
|
4.5
|
Cabin cover
|
|
  |
|
04-03-2012
|
1.0
|
Cabin cover
|
|
  |
|
04-02-2012
|
1.0
|
Cabin cover
|
|
  |
|
04-01-2012
|
1.0
|
Doors lock
|
|
|
|
03-31-2012
|
4.0
|
Doors
|
|
  |
|
03-30-2012
|
7.5
|
Passenger side door lock assembly
|
|
|
|
03-29-2012
|
2.0
|
Doors
|
Details
|
|
|
03-28-2012
|
2.0
|
Door lock mechanism, passenger side
|
Details
|
 |
|
03-26-2012
|
2.7
|
Doors
|
|
  |
|
03-24-2012
|
4.5
|
Doors
|
|
  |
|
03-23-2012
|
2.0
|
Door lock covers
|
|
  |
|
03-21-2012
|
2.0
|
Door locks, cover
|
|
|
|
03-19-2012
|
2.5
|
Door locks
|
|
  |
|
03-18-2012
|
1.0
|
Doors
|
|
  |
|
03-17-2012
|
3.0
|
Doors
|
|
  |
|
03-16-2012
|
2.5
|
Door lock
|
|
  |
|
03-14-2012
|
1.5
|
Doors
|
|
  |
|
03-12-2012
|
2.0
|
Doors
|
|
  |
|
03-10-2012
|
2.5
|
Doors
|
|
  |
|
03-07-2012
|
4.0
|
Doors
|
|
  |
|
03-05-2012
|
2.0
|
Doors
|
|
  |
|
03-04-2012
|
2.5
|
Doors
|
|
  |
|
03-03-2012
|
3.0
|
Doors
|
|
  |
|
03-02-2012
|
5.0
|
Doors
|
|
  |
|
02-22-2012
|
6.0
|
Doors
|
|
|
|
02-22-2012
|
0.0
|
Doors
|
|
 |
|
02-21-2012
|
2.5
|
Doors
|
|
  |
|
02-18-2012
|
3.5
|
Doors
|
|
|
|
02-18-2012
|
0.0
|
Doors
|
|
|
|
02-16-2012
|
2.5
|
Doors
|
|
  |
|
02-15-2012
|
1.0
|
Doors
|
|
  |
|
02-14-2012
|
2.0
|
Door hinges, Planearound instructions
|
|
  |
|
02-11-2012
|
4.0
|
Door hinges
|
|
|
|
02-08-2012
|
2.5
|
Door trimming
|
|
  |
|
02-07-2012
|
2.5
|
Door trimming
|
|
  |
|
02-06-2012
|
2.0
|
Door trim, AP trim module install
|
|
|
|
02-01-2012
|
2.0
|
Door pushrod assembly
|
|
  |
|
01-31-2012
|
3.0
|
Door pushrod assembly
|
Details
|
  |
|
01-30-2012
|
2.0
|
Door handles
|
Details
|
  |
|
01-29-2012
|
3.0
|
Right door halves joined
|
|
  |
|
01-28-2012
|
3.0
|
Left door halves joined
|
|
 |
|
01-27-2012
|
3.0
|
Doors
|
|
  |
|
01-26-2012
|
2.0
|
Doors, AP servo
|
|
|
|
01-26-2012
|
0.0
|
AP servo
|
|
|
|
01-25-2012
|
7.0
|
Doors
|
|
  |
|
01-24-2012
|
2.0
|
Doors
|
|
|
|
01-23-2012
|
2.0
|
Doors
|
|
  |
|
01-22-2012
|
3.0
|
Window/door trimming
|
|
|
|
01-21-2012
|
4.0
|
Cabin door trimming
|
Details
|
|
|
01-10-2012
|
1.0
|
Marker beacon install
|
|
|
|
01-08-2012
|
2.0
|
Riveting of nav antenna doubler
|
|
  |
|
01-06-2012
|
5.0
|
Nav antenna doubler
|
Details
|
|
|
12-10-2011
|
4.0
|
Inventory finish kit, tap tie downs, install tank
|
|
  |
|
12-03-2011
|
0.0
|
My other helper
|
|
|
|
12-03-2011
|
1.0
|
Finish Kit pick up
|
Details
|
|
|
10-26-2011
|
1.5
|
Cabin cover
|
|
  |
|
10-21-2011
|
3.0
|
Cabin cover strip, Wing tip electrical schematic
|
|
 |
|
10-16-2011
|
4.0
|
Cabin drilling
|
Details
|
|
|
10-12-2011
|
4.0
|
Cabin top drilling
|
|
  |
|
10-10-2011
|
1.7
|
Cabin top trimming
|
|
|
|
10-09-2011
|
4.5
|
Cabin top trimming
|
|
|
|
10-07-2011
|
3.0
|
Cabin top trimming
|
|
  |
|
10-06-2011
|
2.0
|
Cabin top trimming
|
|
  |
|
10-03-2011
|
2.0
|
Cabin top trimming
|
|
  |
|
10-02-2011
|
3.0
|
Cabin Cover
|
Details
|
 |
|
09-28-2011
|
5.0
|
Flap system
|
Details
|
|
|
09-27-2011
|
2.5
|
Flap System
|
Details
|
|
|
09-26-2011
|
2.0
|
Elevator control rod installation
|
|
  |
|
09-23-2011
|
4.0
|
Control system
|
|
|
|
09-23-2011
|
1.0
|
Control system
|
|
|
|
09-22-2011
|
2.0
|
Control system
|
|
  |
|
09-20-2011
|
1.5
|
Control System
|
Details
|
  |
|
09-19-2011
|
2.0
|
Fairings
|
Details
|
 |
|
09-18-2011
|
6.0
|
|
|
  |
|
09-17-2011
|
2.0
|
Fuel valve and line work
|
|
  |
|
09-16-2011
|
3.0
|
Valve bracket continued
|
|
 |
|
09-15-2011
|
2.0
|
Brake line and andair fuel valve install
|
Details
|
|
|
09-14-2011
|
5.0
|
Tunnel insulation/seats
|
|
  |
|
09-13-2011
|
2.0
|
Rudder/Brake assembly
|
Details
|
|
|
09-12-2011
|
2.2
|
Rudder pedal frame assembly
|
|
  |
|
09-11-2011
|
3.0
|
Interior paint!
|
Details
|
|
|
09-11-2011
|
3.0
|
Interior paint
|
|
|
|
09-10-2011
|
3.0
|
Interior prep for paint
|
|
  |
|
09-09-2011
|
3.0
|
Interior prep for paint
|
|
  |
|
09-07-2011
|
2.0
|
Interior prep for paint
|
|
  |
|
09-06-2011
|
2.0
|
Interior prep for paint
|
|
  |
|
09-05-2011
|
2.5
|
Interior prep for paint
|
|
  |
|
09-02-2011
|
5.5
|
Rear seat fabrication
|
|
 |
|
09-01-2011
|
1.2
|
Rear seat fabrication
|
|
  |
|
08-31-2011
|
6.0
|
Rudder cables
|
Details
|
|
|
08-30-2011
|
2.5
|
Rudder pedal brackets
|
|
  |
|
08-29-2011
|
2.4
|
Rudder pedals, Heater boxes
|
Details
|
 |
|
08-28-2011
|
8.0
|
Tunnel access panel/Paint booth
|
Details
|
|
|
08-26-2011
|
5.0
|
Access panel to tunnel
|
Details
|
|
|
08-25-2011
|
2.0
|
Fuel lines in the tunnel
|
Details
|
  |
|
08-24-2011
|
2.0
|
Access covers
|
|
  |
|
08-23-2011
|
2.0
|
Access covers
|
Details
|
|
|
08-13-2011
|
2.0
|
Access covers
|
Details
|
 |
|
08-12-2011
|
2.0
|
Baggage door hinge, rear floors
|
|
|
|
08-10-2011
|
2.0
|
Rivet rear floors
|
|
|
|
08-07-2011
|
3.5
|
Baggage door
|
|
  |
|
08-06-2011
|
4.0
|
Baggage door
|
|
  |
|
08-05-2011
|
5.0
|
Baggage door
|
|
 |
|
08-04-2011
|
2.0
|
Baggage door
|
|
  |
|
08-03-2011
|
4.5
|
Baggage door
|
|
|
|
08-02-2011
|
2.0
|
Baggage bulkhead corrugation
|
|
  |
|
08-01-2011
|
2.0
|
Baggage area
|
|
|
|
07-31-2011
|
7.5
|
Baggage area panels
|
|
|
|
07-30-2011
|
2.0
|
Baggage floor riveting
|
|
|
|
07-26-2011
|
4.0
|
Baggage floor riveting
|
|
|
|
07-18-2011
|
2.0
|
String pulled thru conduit. L access panel riveted
|
|
  |
|
07-17-2011
|
3.0
|
Step re-do
|
Details
|
|
|
07-17-2011
|
1.0
|
Fuselage stand
|
Details
|
|
|
07-10-2011
|
5.0
|
Continued work in the baggage area
|
Details
|
|
|
07-08-2011
|
2.0
|
Continued work in the baggage area
|
Details
|
|
|
07-04-2011
|
4.5
|
Baggage area work
|
Details
|
|
|
07-03-2011
|
2.0
|
Drilled ribs for conduit
|
Details
|
  |
|
07-02-2011
|
2.0
|
Fabricated 2 adel brackets
|
|
  |
|
07-01-2011
|
5.5
|
Step bushings, gear access panel
|
|
  |
|
06-25-2011
|
3.0
|
Baggage area
|
|
  |
|
06-24-2011
|
3.0
|
Baggage floors
|
|
  |
|
06-22-2011
|
1.7
|
Baggage floors
|
|
  |
|
06-21-2011
|
1.0
|
Baggage door assembly
|
|
  |
|
06-14-2011
|
2.5
|
Tailcone attachment complete!
|
Details
|
|
|
06-13-2011
|
2.0
|
Riveting tailcone
|
|
  |
|
06-12-2011
|
6.0
|
Tailcone
|
Details
|
  |
|
06-08-2011
|
6.5
|
Tailcone attach
|
|
  |
|
06-07-2011
|
1.5
|
Left gear weldment
|
Details
|
|
|
06-06-2011
|
2.0
|
Right gear weldment reinstall
|
|
  |
|
06-05-2011
|
4.0
|
Tailcone attach
|
Details
|
  |
|
06-04-2011
|
1.0
|
Floor sound proofing
|
|
|
|
06-03-2011
|
6.5
|
Vents and insulation
|
Details
|
|
|
06-01-2011
|
2.0
|
Upper forward fuselage
|
Details
|
  |
|
05-31-2011
|
2.0
|
Step installation
|
Details
|
|
|
05-30-2011
|
3.0
|
Baggage angle riveting
|
|
  |
|
05-29-2011
|
4.5
|
Verification of QB fuselage
|
|
  |
|
05-28-2011
|
1.5
|
Verification of QB fuselage
|
|
  |
|
05-27-2011
|
2.0
|
Verification of QB fuselage
|
|
  |
|
04-30-2011
|
2.0
|
Landing gear removal continued
|
Details
|
  |
|
04-29-2011
|
1.5
|
Landing gear removal
|
Details
|
|
|
04-28-2011
|
2.0
|
Verification of QB fuselage construction
|
Details
|
|
|
04-27-2011
|
7.4
|
Emp tips and brake lines
|
Details
|
|
|
04-24-2011
|
4.0
|
Miscellaneous
|
Details
|
|
|
04-22-2011
|
4.0
|
Brake lines
|
Details
|
  |
|
04-13-2011
|
2.0
|
QB inspection
|
|
|
|
04-12-2011
|
2.0
|
QB inspection
|
|
|
|
04-11-2011
|
2.0
|
QB fuselage inspection
|
|
|
|
04-10-2011
|
0.1
|
QB assembly error?
|
|
|
|
04-10-2011
|
0.1
|
QB assembly error
|
|
|
|
04-10-2011
|
5.0
|
Disassembly of QB fuselage floor panels
|
Details
|
|
|
11-30-2010
|
1.2
|
Deburr frames
|
|
  |
|
11-30-2010
|
2.0
|
Bulkhead deburring and prep
|
|
 |
|
11-28-2010
|
2.0
|
Tapping AEX block for fuselage tie down
|
Details
|
|
|
11-28-2010
|
0.1
|
Fabricate alum angle
|
|
  |
|
11-28-2010
|
2.0
|
Drill AEX block to bulkhead
|
Details
|
|
|
08-04-2010
|
0.0
|
QB fuselage and wings delivery!
|
Details
|
|
|
08-04-2010
|
0.0
|
More pics of the QB delivery
|
|
|