KitLog pro

Powered By Kitlog Pro v2.0

Davids Web Site
' style=
Date:  4-4-2010
Number of Hours:  2.50
Manual Reference:  
Brief Description:  EAA Tech Counselor visit

Dan Benua, EAA chapter 105 technical counselor, visited today to inspect the vertical stabilizer prior to priming and riveting. Overall, a thumbs up was given! Specifically, his feedback was centered on:
1) Increase dimpling pressure
2) Deburr the rear spar doubler a littler more
3) Notch the two nose ribs of the VS that cause a dent in the VS skin.

WIthin a couple hours of his visit, all work was done and the shop was readied for priming.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.