HB-YAK GS-2 Sportsman 2+2 kit
Sportsman 2+2
Fuselage
Work Logs Found:
37
Category Work Time:
94 Hours
Date
Hours
Work Log Summary
Details
11-20-2023
8.00
Installation of fin reinforcement
08-22-2021
4.00
Finish Aft Searweb
Details
07-30-2021
4.00
Cover for the Lower Aft Fuselage Inspection Hole
Details
07-10-2021
2.00
Laminating aft sher web
07-06-2021
2.00
Laminate the Side Attach Flanges for the Forward S
Details
07-03-2021
2.00
Laminate Attach Flanges for the Aft Inter-Bulkhead
Details
06-26-2021
2.00
preparing the two layers of DBM cloth
Details
06-26-2021
4.00
Added two layers of DBM cloth on all wrongly lamin
Details
06-09-2021
2.00
Rivet the Rudder Stop to the Rudder Yoke
Details
06-07-2021
4.00
Laminate the Side Attach Flanges for the Forward S
Details
06-07-2021
4.00
Divers details
05-22-2021
1.00
InstalltheVerticalFinRib
Details
05-22-2021
2.00
AdjusttheRudderTravel
Details
05-22-2021
2.00
:Cut Out the Forward Shearweb
Details
05-08-2021
3.00
Rivet the Vertical Fin Spar to the Fin Shells
Details
05-08-2021
2.00
Install the Vertical Fin Rib, Secure the rib with
Details
05-08-2021
2.00
Fabricate the Rudder Stop Plate
Details
05-08-2021
2.00
Cut an Inspection Hole in the Lower Aft Fuselage
Details
05-08-2021
1.00
Bolt the Upper Rudder Hinge to the Vertical Fin
Details
05-01-2021
2.00
Trim, Position and Drill the Elevator Bellcrank Br
05-01-2021
2.00
Laminate the Aft Attach Flange for the Forward Int
Details
05-01-2021
2.00
Install the Stabilizer Mounting Nutplates
Details
04-23-2021
2.00
Position and Drill the H Stabilizer Attach Bracke
Details
04-23-2021
1.00
Nutplates vertical fin spar
Details
04-23-2021
1.00
Finish the Trailing Edges of the Fin
Details
04-23-2021
2.00
Drill the Horizontal Stabilizer Aft Attach Bracket
Details
04-17-2021
0.50
Riveting the Elevator Bellcrank Assembly
Details
04-17-2021
2.00
Finish the Trailing Edges of the Fin
Details
04-17-2021
4.00
Drilling the Vertical Spar holes
Details
04-14-2021
2.00
Temporalily mount the upper hinge on the fin spar
04-14-2021
2.00
Sand the tops of the vertical Fin
Details
04-14-2021
1.00
Mount the hinges on the rudder
Details
04-14-2021
3.00
Hang the Rudder assembly from the fin
04-14-2021
3.00
Drill the index holes Vertical fin spar
Details
04-14-2021
2.00
Drill and corrosion proof the Elavator Bellcarnk A
03-20-2021
6.00
Camera window finishing
Details
03-20-2021
4.00
Camera window cut out
Details
SITE NAVIGATION
Contact Builder
Sportsman 2+2 Home
Category
# Logs
# Hours
All
343
1748
Avionics
9
38
Empennage
6
34
Engine
51
288
Final assembly
126
535
Fuselage
37
94
Miscellaneous
13
235
Prop
5
20
Shop Supplies
1
8
System Installation
23
92
SYSTEMS INSTALLATION
23
92
Wings
49
312