KitLog pro

Powered By Kitlog Pro v2.0

HB-YAK GS-2 Sportsman 2+2 kit
Work Logs Found: 126
Category Work Time: 535 Hours
 Date
Hours
Work Log Summary

Details

 03-14-2024
4.00
Wing fold hatch midification
       

 03-14-2024
4.00
Wing fold hatch - how to close the gap
Details
       

 03-11-2024
4.00
Wing fold hatch installation
       

 03-11-2024
4.00
Fuselage to Strut fairing installation
       

 03-08-2024
4.00
Right wing fold hatch ajustment
       

 03-08-2024
4.00
Installing the wings again
       

 03-08-2024
4.00
Installing the Faps
Details
       

 03-08-2024
2.00
Fuselage to Strut fairing installation
       

 03-06-2024
6.00
Windshield preparation
       

 02-15-2024
4.00
preparing the landing light window in the cowling
       

 02-15-2024
6.00
Installing wingtips to wing
       

 02-15-2024
4.00
ajusting the wingtip landing light cavity
     

 02-12-2024
6.00
preparing the landing light cavity in the cowling
     

 02-08-2024
6.00
Bonding the window in the left door
       

 02-05-2024
4.00
Bonding the overhead window in the fuselage
       

 02-05-2024
4.00
Bonding the aft window in the fuselage
       

 02-02-2024
10.00
Preparing the aft window in the fuselage
       

 02-01-2024
6.00
Bonding window in aft door
       

 01-26-2024
2.00
Received fresh SILPRUF and cured stand-offs
       

 01-24-2024
4.00
Wingtip landinglight
       

 01-24-2024
4.00
Wing Tip landing light ajustment
       

 01-24-2024
8.00
Windshield adjustment
       

 01-19-2024
4.00
Windshield ajustment
     

 01-19-2024
4.00
Glove compartment
       

 01-17-2024
6.00
Windows ajustment
     

 01-17-2024
2.00
Tail linting handle - final sanding
       

 01-17-2024
3.00
Landing light in wing tip
     

 01-17-2024
4.00
Engine cowling - camloc installation done
       

 01-12-2024
4.00
Tail lifting handle installation
       

 01-12-2024
6.00
Ajusting the windows
       

 01-09-2024
4.00
Wing Tip Landing lights
       

 01-09-2024
4.00
Windows installation
       

 01-05-2024
6.00
Windows installation
       

 01-04-2024
3.00
RH - FUSELAGE FAIRING INSTALLATION
Details
       

 01-04-2024
3.00
LH - FUSELAGE FAIRING INSTALLATION
       

 12-29-2023
4.00
Cowling lights installation
Details
       

 03-31-2023
4.00
Transponder antenna installation
Details
       

 03-15-2023
8.00
Cables from taol and Fw deflector
       

 02-22-2023
2.00
Clamping heat duct
       

 12-08-2022
6.00
Building the instrument rack
       

 12-03-2022
4.00
Co-pilots grip wiring
       

 11-26-2022
8.00
Pilots grip switch wiring
       

 11-14-2022
2.00
Instrument Panel in place
       

 11-14-2022
4.00
Gaining wheight on the pedals
Details
       

 11-14-2022
2.00
Clamped down the fuel line on both sides
       

 10-26-2022
2.00
More parts from Glasair aviation
       

 10-25-2022
2.00
Received a big parcel from Glasairaviation
       

 10-10-2022
4.00
The pedals are quite heavy, we want to remove some
       

 10-10-2022
4.00
Checking engine alignment
Details
       

 09-15-2022
2.00
Painting of panel parts with 2K paint
       

 09-15-2022
4.00
Assembly of the two cowling parts.
       

 08-19-2022
1.00
Priming of panel boards
     

 08-19-2022
3.00
Ajusting the top cowling, using a 3D printed jig
     

 08-06-2022
3.00
Cowling acess door
       

 05-21-2022
8.00
Flap cables installation and nicopress
       

 05-07-2022
8.00
Aileron cables installation
       

 05-07-2022
8.00
Aileron Cable nicopress installation
       

 05-06-2022
6.00
Adjusting the wing folding mechanism
       

 04-23-2022
4.00
The arm of the servo is touching the seat pan
       

 04-23-2022
4.00
Parking brake installation
       

 04-09-2022
8.00
Fuel lines routing to Andair fuel selector
       

 04-09-2022
8.00
Autopilot Servo installation
Details

 04-02-2022
6.00
Routing of fuel lines
     

 04-02-2022
10.00
Installation of servos for the autopilot
       

 03-26-2022
4.00
Wings installation, to finish the control cables
       

 03-26-2022
1.00
Wings folded - fits in the box :-)
       

 03-05-2022
2.00
Tension the Elevator cable
     

 02-19-2022
4.00
Control Cable Safety Guides SB67
       

 02-12-2022
2.00
some more Control Cable Safety Guides
Details
       

 02-05-2022
4.00
Floorboards installation
       

 02-05-2022
8.00
Cable guards installed, according to Service Bulle
Details
       

 01-22-2022
6.00
Left wing prep for fuel tanks
       

 01-15-2022
6.00
Right wing transfer line installation
       

 01-15-2022
6.00
Glareshield cover
Details
       

 01-08-2022
3.00
Install the Strake Ribs
Details
       

 01-08-2022
2.00
Finishing the glareshied
       

 01-08-2022
3.00
Cut Out the Strake Ribs
Details
       

 01-08-2022
4.00
Bulkhead A closeout detailing
Details
       

 12-30-2021
4.00
Step 17: Fit the Floorboards
Details
       

 12-30-2021
2.00
Seam the Strake Halves Together
Details
       

 12-30-2021
2.00
Mark the Centerlines of the Horizontal
Details
       

 12-28-2021
4.00
Re-installed the TT gear, all nuts secured
     

 12-28-2021
2.00
Drill the Close-Out and Install the Mounting
Details
     

 12-28-2021
4.00
Decorating the Bulkhead A Closeout
Details
       

 12-18-2021
4.00
Tough Terrain Landing Gear
Details
       

 12-18-2021
4.00
Fuel tube connecting header tant to gascolator
Details
       

 12-18-2021
4.00
Firewall insulation installation - done
       

 12-18-2021
6.00
Brake lines installed
     

 12-17-2021
4.00
Tough Terrain Landing Gear
Details
       

 12-17-2021
2.00
Gascolators scrwed and support primed
       

 12-11-2021
8.00
Tough Terrain Landing Gear
Details
       

 12-10-2021
8.00
Tough Terrain Landing Gear
Details
       

 12-10-2021
4.00
Tough Terrain Landing Gear
Details
       

 12-04-2021
4.00
Tough Terrain Landing Gear
       

 12-04-2021
4.00
Tough Terrain Landing Gear
       

 12-04-2021
8.00
Tough Terrain Landing Gear
       

 11-27-2021
8.00
Tough Terrain Landing Gear
       

 11-27-2021
8.00
Tough Terrain Landing Gear
       

 11-20-2021
4.00
Tailwheel steering cables routing and nicopress
       

 11-20-2021
4.00
Gascolator temporary install
     

 11-20-2021
2.00
Engine mount install
       

 11-20-2021
2.00
cable guard installation
     

 11-20-2021
2.00
Aft seatbelt top attach point
       

 11-20-2021
2.00
Aft Center seatbelt installed
       

 11-13-2021
3.00
Rivet the Firewall Assembly Together
Details
       

 11-13-2021
1.00
Aft Center seatbelt attach points laminated/screwd
     

 11-11-2021
8.00
Fabricate the Firewall Components
       

 11-11-2021
2.00
Aft cable cover install
       

 11-06-2021
2.00
Laminating the tabs for the aft contol cable cover
Details
     

 11-06-2021
2.00
Glare Shield heat nozel install
     

 11-06-2021
8.00
Fire wall
Details
       

 11-06-2021
2.00
Checking the Nicopress swage with a caliper
       

 10-30-2021
2.00
Seat Belt Anchor Points moved aft
Details
       

 10-30-2021
2.00
Seat Belt Anchor Point moved aft
Details
       

 10-23-2021
4.00
Glue the Glare Shield Mounting tabs
Details
       

 10-23-2021
10.00
Fabricate the upper and lower firewall flange
Details
       

 10-16-2021
4.00
Installing the contol Sticks
Details
       

 08-21-2021
4.00
Fabricate and Install the Panel Braces
Details
       

 08-21-2021
2.00
Adjust tank sending units
       

 07-31-2021
4.00
Installelevator and rudder cables
       

 05-31-2021
2.00
Inspect the Control System
Details
       

 05-31-2021
4.00
Fabricate and Install the Elevator Control Stop
Details
     

 05-22-2021
2.00
Fabricate and Install the Elevato rControl Stop
Details
     

 05-08-2021
2.00
Rough-Cut the Foam Core for the vertical fin rib
Details
       

 05-01-2021
2.00
Secure the Tip Fairing to the Rudder
Details
       

 05-01-2021
2.00
Elevator Pushrod
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.