KitLog pro

Powered By Kitlog Pro v2.0

HB-YAK GS-2 Sportsman 2+2 kit
' style=
Date:  12-11-2021
Number of Hours:  8.00
Manual Reference:  
Brief Description:  Tough Terrain Landing Gear

Installing the Tough Terrain Landing Gear and checking the level - all good.
' style=

Brakes and wheels installed

Brakes and wheels installed

' style=

Christoph in the background installing the firewall insulation

Christoph in the background installing the firewall insulation

' style=

Airctaft level on the new gear

Airctaft level on the new gear

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.