Date
|
Hours
|
Work Log Summary

|
Details

|
07-20-2021
|
4.00
|
J-3 L mag and J-4 R mag to starter switch
|
|
  |
|
07-01-2021
|
4.00
|
Wiring of Altenator and mag
|
|
|
|
06-30-2021
|
3.00
|
Work on Mag L/R wiring
|
Details
|
  |
|
11-18-2020
|
4.00
|
Fuel flow mount
|
|
 |
|
11-16-2020
|
6.00
|
CHT/ EGT cables and prep for rivitting
|
Details
|
|
|
11-15-2020
|
4.00
|
installing egnine sensors
|
|
|
|
11-13-2020
|
5.00
|
Oil and fuel pressure mounts/GRT remote EIS
|
|
|
|
10-05-2020
|
3.00
|
Baffel rods redone
|
Details
|
 |
|
10-03-2020
|
4.00
|
more work on engine cables
|
|
|
|
10-01-2020
|
3.00
|
Installed some engine cables
|
Details
|
  |
|
09-04-2020
|
4.00
|
Fab air to carb work
|
|
  |
|
08-31-2020
|
4.00
|
FAB air work to carb
|
|
  |
|
08-19-2020
|
4.00
|
air inlet to carb work
|
Details
|
|
|
04-23-2020
|
4.00
|
Cut the VA-131--C to fit the Carb
|
|
  |
|
01-06-2020
|
3.00
|
Baffel
|
Details
|
  |
|
01-03-2020
|
3.00
|
Installed 60 amp Hartselll alternator / carb
|
|
|
|
01-03-2020
|
1.00
|
Added 8 quarts of Aeroshell 100 break in oil
|
Details
|
  |
|
01-02-2020
|
2.00
|
Drain shipping preservation oil from engine
|
|
|
|
01-01-2020
|
4.00
|
Engine mount
|
Details
|
 |
|
09-21-2019
|
4.00
|
Engine mount to firwall re tourque bolts
|
Details
|
  |
|
09-17-2019
|
4.00
|
Engine mount
|
Details
|
  |
|
08-29-2019
|
4.00
|
Gear legs fitting engine mount
|
Details
|
  |
|
08-28-2019
|
4.00
|
setting up to install engine mount, gear legs
|
|
  |
|
07-09-2019
|
2.00
|
New engine
|
Details
|
|