KitLog pro

Powered By Kitlog Pro v2.0

ROBERT'S WEB SITE
Work Logs Found: 293
Category Work Time: 1223 Hours
 Date
Hours
Work Log Summary

Details

 12-08-2020
6.00
forward fuselage assembly
Details

 12-07-2020
5.00
forward fuselage assembly
Details

 05-13-2020
3.00
Sanding fiberglass to 1/8 clearance on HS-VS tips

 05-07-2020
5.00
Finished riveting F-775 rear top skin to lower ski

 05-04-2020
4.00
Set up to rivet F-775 top skin
Details

 12-26-2019
4.00
F-794B to aft top skin
Details

 12-25-2019
4.00
work HS Fiberglass tip L side HS
Details
     

 12-24-2019
4.00
Work on F-794B

 12-23-2019
4.00
LS empenage Gap cover
Details

 12-21-2019
4.00
F-794B work
Details
       

 12-20-2019
4.00
work on F-794B
Details
       

 12-19-2019
4.00
Rudder/ VS work
Details

 12-18-2019
4.00
Rudder stops
Details
     

 12-16-2019
4.00
Rrudder stops
Details
     

 12-13-2019
3.00
Rudder stops
Details
       

 12-12-2019
3.00
Redoing rudder stops
     

 12-10-2019
5.00
Adjusting rudder rod
       

 12-09-2019
3.00
Rudder bolts
Details

 12-04-2019
4.00
Installed the VS again
Details
     

 12-03-2019
4.00
HS-615 ffitting
Details
     

 12-02-2019
4.00
Recheck for vertcal distance, VS riveting
Details

 11-25-2019
4.00
VS mounting
Details
     

 11-24-2019
4.00
VS
Details

 11-19-2019
4.00
Removed VS after drilling holes in F-712D to aft d
Details

 11-18-2019
4.00
Aft Deck and VS 702
Details
       

 11-17-2019
4.00
F-712D
Details

 11-16-2019
4.00
More work on aft deck

 11-15-2019
4.00
Riveted most od the Aft deck on
Details
     

 11-14-2019
4.00
Prep for riveting the aft deck
Details

 11-13-2019
4.00
work on mounting VS
Details
     

 11-10-2019
3.00
Riveting F-790
Details
       

 11-09-2019
4.00
More Work on elevators

 11-08-2019
4.00
More Work on elevators

 11-06-2019
4.00
More Work on elevators

 11-05-2019
3.00
Elevator & Push Rod
Details
       

 11-04-2019
4.00
Trimming F-714
Details

 11-03-2019
3.00
Installing/riveting some rivets in aft elevators

 11-02-2019
5.00
Elevator to HS work
Details

 11-01-2019
4.00
Drilling the elevator horns
Details
       

 10-31-2019
4.00
Work on Elevator
Details
       

 10-30-2019
4.00
More work on elevator install to HS
     

 10-26-2019
4.00
Elevators
Details
     

 10-25-2019
4.00
Measuring/Drilling HS

 10-24-2019
4.00
Measuring and drilling HS

 10-23-2019
4.00
More work on fitting HS

 10-22-2019
4.00
F-711E
Details

 10-21-2019
5.00
measuring/fitting HS

 10-20-2019
5.00
F-773 aft fuselage
Details
       

 10-17-2019
4.00
Work on aft deck
Details

 10-16-2019
4.00
Aft Deck andrelated parts
Details
       

 10-15-2019
6.00
F-714
Details

 10-13-2019
2.00
Work on upper forward ribs to firewall
Details
     

 10-01-2019
4.00
static port
Details

 09-29-2019
4.00
Fuel vent line screen
Details

 09-24-2019
4.00
Rudder control cable parts
Details

 09-20-2019
4.00
Finish fuel vent lines
Details

 08-23-2019
6.00
Fuel vent install
Details
       

 08-12-2019
4.00
Work on fuel lines
       

 08-07-2019
4.00
Re Cutting 3/8" fuel tubing fuel for better fit

 08-06-2019
4.00
Park brake
Details
       

 08-05-2019
4.00
Brake tubing and Park brake

 08-02-2019
4.00
Work on brakes tubing
     

 07-30-2019
6.00
Work on brake tubes etc.

 07-29-2019
5.00
Work on Brake tubing
     

 07-27-2019
4.00
Forward section bulkhead
Details

 07-26-2019
3.00
Fuel line work
Details
       

 07-25-2019
4.00
Work on fuel lines

 07-23-2019
4.00
Heater Bracket
Details
 

 07-22-2019
6.00
Heat fire wall bracket
Details
     

 07-21-2019
4.00
Gasolator install
Details
     

 07-20-2019
4.00
Mount Gasalator to fire wall
Details

 07-18-2019
4.00
Roll bar nuts
Details

 07-17-2019
3.00
Spent 3 hours trying to find the brake tee
Details

 07-17-2019
4.00
Finished the floor cover nut plates

 07-15-2019
5.00
work on front floor covers F-782C
Details

 07-10-2019
3.00
more work on battery mount and MR an SR
Details

 07-05-2019
4.00
Battery bracket install
Details

 07-04-2019
5.00
more work on battery install

 07-02-2019
4.00
ES-PC 680 battery mount
Details
     

 06-28-2019
4.00
Mounting ES-40108 Facet electric fuel pump etc
Details
       

 06-27-2019
4.00
Clecoed top skin for marking the roll bar drilling
Details
       

 06-26-2019
6.00
Top front skin
Details

 06-25-2019
4.00
F-721A L/R
Details

 06-24-2019
5.00
F--718 L/R longerons F-720 L/R
Details
       

 06-22-2019
4.00
F-793 heat brackets
Details

 06-21-2019
4.00
F-721C and F-721D
Details

 06-20-2019
4.00
F-7103C L/R
Details
     

 06-19-2019
3.00
C-668
Details

 06-18-2019
5.00
C-668
Details

 06-17-2019
5.00
WD-641 Roll bar
Details

 06-15-2019
4.00
F-7103C L/R
Details
       

 06-14-2019
4.00
Fabricated F7103C
Details
       

 06-13-2019
4.00
Fabricated F-7108
     

 06-12-2019
4.00
Dimpled F-768B L/R, F-745 L/R

 06-10-2019
4.00
Work on top skin to ribs/panel
       

 06-09-2019
4.00
Still fittiing ribs etc for a better fit of the to
       

 06-08-2019
4.00
Fitting top front skin
Details

 06-07-2019
4.00
Riveting front side skins
Details
       

 06-06-2019
4.00
Work on WD-641 Roll Bar setting
Details
       

 06-04-2019
6.00
Riveting seat floors to ribs

 06-02-2019
5.00
Work on F-742 L/R seat floor
Details

 05-31-2019
3.00
More work on aft baggage

 05-29-2019
4.00
Finished riveting nut plates on F-652 & F-751

 05-28-2019
4.00
Baggage compartment
Details
     

 05-27-2019
3.00
Aft baggage compartment
Details

 05-22-2019
5.00
baggage floor riveting
Details
       

 05-14-2019
5.00
Work on aft Baggage floor

 05-13-2019
4.00

Details

 05-11-2019
4.00
Work on F-747 R/L
Details
       

 05-10-2019
5.00
Fitting WD-613 EF
Details

 05-05-2019
3.00
Fitting 613-EF flap actuator mount

 05-04-2019
4.00
Removed baggage floor F-748 & F-766A
Details

 05-03-2019
4.00
Flap installation

 04-26-2019
3.00
Electric flaps
Details
     

 04-25-2019
5.00
Electric flaps
Details
       

 04-24-2019
5.00
Finding Part F-758 L/R
Details
     

 04-23-2019
5.00
Electric flaps
Details

 04-22-2019
5.00
Electric flaps build
Details
     

 04-20-2019
4.00
Manufactured parts for electric Flaps
Details
       

 01-27-2019
4.00
F-695 Gussets
Details
       

 01-25-2019
5.00
F-695 gusets
Details
     

 01-23-2019
5.00
Fitting F-695 Gussets

 01-22-2019
4.00
After fitting top panel skin removed it and drille
Details

 01-18-2019
6.00
Drilling F-675 L/R per DWG 23

 01-14-2019
6.00
More skin riveting
       

 01-08-2019
6.00
More skin riveting and drilling F695 L/R
       

 01-07-2019
6.00
More skin riveting
       

 01-03-2019
6.00
More skin riveting
       

 01-02-2019
6.00
More skin riveting
       

 01-02-2019
6.00
More riveting etc
       

 12-29-2018
6.00
more Fuselage skin riveting
     

 12-27-2018
6.00
Riveting left side skins to fuselage
       

 12-25-2018
6.00
Riveting right side skins to fuselage
       

 12-18-2018
6.00
Bolts to Aft center bulkhead and all F-716 front r
     

 12-17-2018
4.00
Trimed F-717-S R/L and front lower bolts to F-704B
Details
       

 12-11-2018
3.00
work on F-652 upper baggage bulk head
Details

 12-10-2018
3.00
work on drilling F-724 L/R lower tab's
Details

 11-28-2018
6.00
Arrival of fire wall anf finishing kits
Details
       

 11-26-2018
4.00
More work on baggage area
Details
     

 11-24-2018
5.00
more work on rear baggage area
Details
       

 11-21-2018
5.00
Started working on the baggage area
Details
       

 11-19-2018
3.00

Details

 11-16-2018
5.00
Riveting
Details
       

 11-15-2018
4.00
Rivet F-6118 to F-601N-L

 11-14-2018
4.00
Refabricated Lower front longerron
Details

 11-13-2018
4.00
removed left side skin to dimple
Details

 11-10-2018
5.00
Moving the 2 sections of the fuselage
Details

 11-09-2018
5.00
finished the 2 benches

 11-08-2018
5.00
Building a low bench for fuselage
       

 11-04-2018
4.00
Removed all parts connected to F-902 L/R
Details

 11-03-2018
4.00
Finished dimpling R side skin
       

 11-02-2018
4.00
started rivetting R side forward skin

 11-01-2018
4.00
Finished rivetitng forwar bottom skin

 10-31-2018
4.00
Rivet forward bottom skin F-772

 10-28-2018
5.00
Rivet section of F-730 plate to F-728 B& F-729B
       

 10-27-2018
4.00
Riveting F-728 bell crank chanell
Details

 10-26-2018
6.00
Fit F-728B,F-729B,F-730 plate to F-706 bulk head

 10-25-2018
5.00
prep to rivet F-706B to ribs
Details
       

 10-24-2018
4.00
CS upper right longeron debur etc.

 10-23-2018
5.00
CS upper left longeron debur etc,

 10-22-2018
5.00
dimpled and counter sink in F-772 bottom front ski

 10-20-2018
6.00
Removed both front side skins &lower F-772 skin
       

 10-19-2018
4.00
Finished floor stiffeners drilled/deburred
Details

 10-18-2018
4.00
removed F-902 R/L installed 4 nut plates
Details

 10-16-2018
4.00
Rudder pedal work

 10-04-2018
5.00
drill pedal to brake cylinders
     

 09-24-2018
4.00
work on rudder pedals

 09-21-2018
4.00
measuring and drilling rudder pedals

 09-20-2018
4.00
work on rudder pedals
       

 09-16-2018
4.00
Fabricated F-6118 Rudder pedal brace per manual
Details
     

 09-15-2018
4.00
Installed the fire wall recess to fit with F-611

 09-14-2018
4.00
Work on Rudder control pedals
Details
     

 09-13-2018
4.00
manufactured another F-782 D angle

 09-12-2018
4.00
work on new F-7101-L
Details

 09-11-2018
3.00
clecoed F-770-L back on to drill angle clip F-719B
Details

 09-09-2018
4.00
Drilled F-7101-L for K1000-08 nut plates
Details

 09-04-2018
2.00
Manufacturing F-782D

 08-30-2018
5.00
Fabricating( 2) F-719

 08-28-2018
3.00
Measured and drilled F-772 B-R& F-772B-L floor sti
       

 08-26-2018
2.00
Drilled lower engine bracket to lower logeron for
Details

 08-24-2018
3.00
Removed all clecos from L side skins for dimpling

 08-22-2018
4.00
Bolted F-684 , Drilled F-717 lower skin L/R etc.

 08-20-2018
6.00
Clecoed F-684 gusset, clecoed F-722 on L/R
Details

 08-19-2018
4.00
Work on drilling the F-684 Gusset
       

 08-16-2018
4.00
Drilled lower engine bracket holes SEC- L DWG-23

 08-15-2018
6.00
work on F-7114 and F-7101-L
Details
       

 08-11-2018
4.00
Fitting in F-7114-L& F-7101-L

 08-10-2018
4.00
trimed F-717 to 26-1/2" instead of 26 5/8" to fit
Details

 08-08-2018
4.00
Fabricate lower lngerons
Details

 08-07-2018
4.00
Fabricate F-719 B L/R

 08-06-2018
4.00
Got a HF engine stand so spent time picking it up
Details

 08-02-2018
4.00
Trimed F-713-R
Details

 08-01-2018
5.00
Finished drilling F-601A-2
Details
     

 07-31-2018
4.00
Final drilling fire wall to skins
       

 07-30-2018
4.00
more work on fitting RF-718 L/R

 07-29-2018
3.00
Trim F-718 longerons
Details

 07-24-2018
3.00
Fire wall fitting to longeron

 07-23-2018
4.00
Clecoed F-772 bottom skin to F-404 A&B
Details

 07-22-2018
3.00
Drilled remaining holes in F-718 longeron
Details
       

 07-21-2018
3.00
Drilled F-715 L/R using side skin F-770

 07-20-2018
4.00
Drilled F-718 using sde skin up to F-704 bilk head

 07-19-2018
3.00
Finished drilling F-721B L/R to upper longeron F-7
       

 07-16-2018
3.00
more work on F-721 A/B

 07-13-2018
3.00
F-721B L/R fitting to upper longeron

 07-11-2018
5.00
Bending F-770 lower skin per drawing
Details
       

 07-10-2018
4.00
more work on longerons bending

 07-09-2018
3.00
measured and cut both L?R F-718 longerons

 07-08-2018
3.00
Got side skins to match
Details
       

 07-06-2018
4.00
trying to match holes from F-770 to F-773 skins

 07-04-2018
4.00
Drilled F-623-L/R to F-776 bottom skin
       

 07-03-2018
4.00
Clecoed aft skin & F-705 aft ribs to F-706B
       

 07-01-2018
3.00
Still working on matching center to aft

 06-30-2018
5.00
Prep for merging center section to aft section
       

 06-29-2018
3.00
Drilled the F-715 ribs after fluting& bending to f
       

 06-25-2018
4.00
More rivitting on the ribs to F-705

 06-24-2018
6.00
More rivitting on the ribs to F-705

 06-22-2018
4.00
Riveting Ribs to F-705

 06-21-2018
4.00
Rivet seat Ribs to F-705 to Baggage ribs

 06-18-2018
4.00
Rivet seat ribs to F-704 Aft bulkhead

 06-07-2018
3.00
Fitting seat ribs and baggage floor ribs

 06-06-2018
3.00
Work on setting up seat ribs and croch brackets
     

 06-05-2018
3.00
F-704
Details
     

 06-01-2018
3.00
F-605
Details

 05-31-2018
3.00
measured ,clamped/drilled F-605 C
     

 05-23-2018
4.00
Ordered damaged F-605 C so removed rivits etc

 05-21-2018
3.00
Left side crotch strap's finnished start left side

 05-18-2018
3.00
Work on left side crotch strap's

 05-17-2018
3.00
Prep to rivet F-704 B to seat ribs

 05-16-2018
4.00
finished dimple ribs and rest of F-776
Details

 05-15-2018
4.00
Dimpled F-776 skin after deburring

 05-14-2018
4.00
final drill on F-776 to seat ribs
Details

 05-12-2018
3.00
Fitting bottom center skin to ribs
Details

 05-11-2018
4.00
manufactured F-623A FWD and aft per DWG
Details

 05-10-2018
4.00

Details

 05-09-2018
5.00
manufactured F-916 C(4)
Details

 05-08-2018
4.00
Nut plates
Details

 05-07-2018
3.00
work on F-716B and F-716R

 05-02-2018
3.00
Prep for center fuselage pg 8.5 manual
Details

 05-01-2018
3.00
L-side skins to J-stiffeners riveting

 04-30-2018
4.00
Right aft skin to bulk head and J-stiffeners rivet

 04-29-2018
4.00
Aft skin riveting

 04-28-2018
4.00
Aft skin riveting

 04-27-2018
4.00
Riveting lower aft skin

 04-26-2018
4.00
Lower aft skin riveting
Details

 04-20-2018
5.00
Aft fuselage prep
Details

 04-19-2018
5.00
F-708 bulk head
Details

 04-18-2018
4.00
finished left aft side ski dimpling

 04-17-2018
5.00
right aft side skin
Details

 04-16-2018
5.00
Work on F-711 and F-712 bukhead
Details
       

 04-10-2018
5.00
Aft Bulk Heads and skins
Details
     

 04-07-2018
4.00
Aft Bulk Heads and skins
       

 04-04-2018
5.00
Aft Bulk head
       

 04-03-2018
5.00
Aft Bulk Heads
       

 03-29-2018
5.00
Work on aft bulkhead, skins etc
       

 03-22-2018
3.00
Aft Bulk hears and J stiffeners
       

 03-20-2018
5.00
Work on rear bulkheads J stiffeners
     

 03-19-2018
5.00
More work on aft bulkheads and F-711 and F-712
       

 03-18-2018
5.00
work on F-711 and F-712
       

 03-16-2018
4.00
Work on F-713 Longerons bending etc
Details
       

 03-11-2018
5.00
Work on F-711 and F712 bulkhead
     

 03-11-2018
4.00
work on F-711 and F-712
     

 03-10-2018
4.00
Work on 705 Bulkhead and F711 Bulkhead
       

 03-02-2018
4.00
Work on 705 Bulkhead
       

 02-26-2018
4.00
Work on 705 Bulkhead ribs
       

 02-23-2018
4.00
Work on 705 Bulkhead
     

 02-07-2018
4.00
Work on 705 Bulkhead
       

 02-02-2018
4.00
Work on F-705
       

 02-01-2018
5.00
work on F705L and F-705R
       

 01-30-2018
5.00
work on F-705 bulkhead
     

 12-20-2017
4.00
work on F-705 Bulkhead
       

 12-19-2017
4.00
Work on F 705 bulkhead
       

 12-13-2017
4.00
Drilled all F-634 L/R seat belt hangers
     

 12-06-2017
4.00
Cutting parts
Details
       

 12-02-2017
4.00
Center section work
Details
       

 11-26-2017
4.00
Center bulk head work
Details
       

 11-23-2017
4.00
center bulk head work
Details
       

 11-20-2017
4.00
Drilled 2 Bars
Details
       

 11-15-2017
3.00
Back Riveting Aux fuel and brake plates to F-601A-
Details
       

 11-14-2017
3.00
Fuel pump plate nut plates
Details

 11-12-2017
4.00
F-601 J-L&R
Details

 11-11-2017
3.00
Riveting parts to F-601A-2
Details
       

 11-04-2017
3.00
Prime parts
Details
       

 11-03-2017
6.00
F-601A-2
Details
     

 11-02-2017
3.00
F-601Z
Details
       

 11-01-2017
6.00
F-601A-2
Details

 10-31-2017
2.00
F-601P
Details

 10-26-2017
3.00
F-601A-2 Aux fuel doubler
Details
       

 10-25-2017
6.00
manufacturing parts
Details
       

 10-22-2017
4.00
Getting parts ready for the 1st part of the fusela
Details

 03-22-2017
3.00
J-Stiffeners and Aft Bulk heads
       

 07-30-2016
6.00
Work on Brakes tubing and Park brake

 01-25-2016
5.00
Clecoed top skin after clamping F-695 gussets inpl

 05-25-2015
6.00
Inventory of fuselage parts










Copyright © 2001-2024 Matronics. All Rights Reserved.