Brief Description: CHT/ EGT cables and prep for rivitting
Measured and drilled holes in the exhaust pipes 2" down from the cylinders and keeping the holes away for removing the spark bottom plugs. These 4-- P/N- GRT P/N EGT-HC-S-01. Then connected the 4- CHTI(cylinder head temperture sensos) GRT-P/N CHT-Bay-01 wires. Theses are pushed in the holes in each cylinder untill they click in. Also preping for finish riveting the forward ribs not done before riveting the top front skin.