Date
  | 
	Hours
  | 
	Work Log Summary 
		 
  | 
	Details 
		 
  | 
	
		
	
	 10-31-2021
  | 
	3.00
  | 
	Reinstallation of the elevator push rod and autopi
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 10-30-2021
  | 
	9.00
  | 
	Electrical wiring, mount VPX-Pro and rear ski rack
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 10-16-2021
  | 
	11.00
  | 
	Rivet on the rear fuselage top skin
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 10-15-2021
  | 
	2.00
  | 
	Rivet on rear bulkhead to top rear skin
  | 
	
		 | 
	
	          | 
 
	
  | 
	
	
	 10-11-2021
  | 
	1.50
  | 
	Prep the rear fuselage for riveting on the top ski
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 10-03-2021
  | 
	4.50
  | 
	Firewall insulation and heat shield
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-04-2021
  | 
	6.50
  | 
	nutplates for floor access
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 09-02-2021
  | 
	2.00
  | 
	Work on nutplates for floor access
  | 
	
		 | 
	
	          | 
 
	
  | 
	
	
	 09-01-2021
  | 
	1.50
  | 
	Wrapped rear control stick with vinyl and worked o
  | 
	
		 | 
	
	          | 
 
	
  | 
	
	
	 08-31-2021
  | 
	1.00
  | 
	Nutplates for removable access to fuselage floor
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 08-30-2021
  | 
	2.50
  | 
	Plate nuts for removable floor
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 08-25-2021
  | 
	1.50
  | 
	Started drilling and setting nutplates to make the
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 11-27-2020
  | 
	4.50
  | 
	completed the wing connection tabs for left and ri
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 11-26-2020
  | 
	6.00
  | 
	Form flap fairing, debur, dimple, and rivet
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 11-17-2020
  | 
	1.50
  | 
	Left wing root fairing attachement
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 11-16-2020
  | 
	1.75
  | 
	Drill, debur, dimple, and rivet on the nut plates
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 09-07-2020
  | 
	6.00
  | 
	Nutplates for wing root fairing
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 08-01-2020
  | 
	8.50
  | 
	finish the wing attachments/fairings and remove th
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 07-17-2020
  | 
	1.00
  | 
	Trailing edge flap fairing
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 07-14-2020
  | 
	1.50
  | 
	Flap fairing and aileron edge alignment
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 07-13-2020
  | 
	2.00
  | 
	Adjusting flaps push rods and ailerons rods for be
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 07-11-2020
  | 
	6.50
  | 
	MFG, match drill, and trim wing root fairings
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 07-09-2020
  | 
	1.00
  | 
	Fuel line from fuel pump to firewall
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 07-08-2020
  | 
	1.50
  | 
	Fabricate the fuel and vent lines
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 07-07-2020
  | 
	1.00
  | 
	Fabricating fuel lines
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 07-06-2020
  | 
	1.50
  | 
	Left tank to fuselage lines
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 07-04-2020
  | 
	8.50
  | 
	Rebuilt the left tank bracket and install fuel pum
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 07-02-2020
  | 
	3.00
  | 
	mounting flap assembly
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 07-01-2020
  | 
	1.75
  | 
	Left flap assembly
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 06-30-2020
  | 
	2.00
  | 
	Left flap assembly
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 06-29-2020
  | 
	1.00
  | 
	Flap push rod assembly
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 06-27-2020
  | 
	5.00
  | 
	Attache Aleron push rod assembly and adjust flight
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 06-23-2020
  | 
	1.50
  | 
	mounting the 863 bracket to the fuselage
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 06-20-2020
  | 
	3.00
  | 
	Fab 860 tank bracket
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 06-19-2020
  | 
	3.00
  | 
	Bottom skin and tank attachment
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 06-18-2020
  | 
	9.00
  | 
	inserted the right wing and all measurements neces
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 06-17-2020
  | 
	5.00
  | 
	Removed interior features and insert the left wing
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 06-16-2020
  | 
	9.50
  | 
	Ran brake lines and wrapped the rib sections on ba
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 06-15-2020
  | 
	5.50
  | 
	Modify rib between bagage compartment and instrume
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 06-10-2020
  | 
	2.00
  | 
	sheet metal prep for forward skin
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 04-29-2020
  | 
	2.00
  | 
	Alignment and riveting Baggage door
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 02-26-2020
  | 
	2.00
  | 
	hardware assemble for forward baggage door
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 06-01-2019
  | 
	4.50
  | 
	Baggage door assembly
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-31-2019
  | 
	2.00
  | 
	Forward Baggage door
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 05-30-2019
  | 
	1.50
  | 
	Match drilling and top skin assembly
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 05-29-2019
  | 
	2.50
  | 
	Top skin assembly
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-28-2019
  | 
	2.50
  | 
	Assembly of the instrument panel with notched flan
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-27-2019
  | 
	1.50
  | 
	Working on the forward top skin
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 05-27-2019
  | 
	7.50
  | 
	Prep and seal vent openings.  Drill and seal stati
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-25-2019
  | 
	4.00
  | 
	Remove bulkheads and top skin and finish dimpling 
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 05-24-2019
  | 
	2.00
  | 
	Clecoing on the top tail skin
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 05-23-2019
  | 
	1.50
  | 
	Fabricate wood platforms for working on the tail s
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 05-22-2019
  | 
	1.50
  | 
	nutplates on gussetts.
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 05-18-2019
  | 
	3.50
  | 
	Started to work on the turtle back assembly
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 05-16-2019
  | 
	3.50
  | 
	Plumbing for fuel system
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 05-09-2019
  | 
	2.50
  | 
	Work on fuel, vent lines, and valve.
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 05-08-2019
  | 
	1.00
  | 
	working on vent lines
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 05-04-2019
  | 
	10.00
  | 
	Assembled the rudder pedan assebmly
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-27-2019
  | 
	4.50
  | 
	Rudder pedal assembly
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 04-25-2019
  | 
	3.50
  | 
	Forward rudder pedal assembly
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 04-23-2019
  | 
	1.50
  | 
	Rear rudder pedal assembly
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 04-22-2019
  | 
	2.00
  | 
	Rear Rudder pedal assembly
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 04-20-2019
  | 
	3.50
  | 
	Rear Rudder pedal assembly
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 04-18-2019
  | 
	2.00
  | 
	Rear rudder pedal assembly
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 04-17-2019
  | 
	2.50
  | 
	Front rudder pedal assembly
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 04-16-2019
  | 
	1.25
  | 
	bolt the rudder pedal cable guides to the cross me
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 04-15-2019
  | 
	2.00
  | 
	Mount flap motor to control arm and rivet the rudd
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 04-10-2019
  | 
	2.00
  | 
	Trim rudder stops to correct rudder travel
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 04-05-2019
  | 
	1.50
  | 
	Connect the mid and aft pushrods for the elevators
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 03-23-2019
  | 
	4.00
  | 
	Cut and connect control stick
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 03-20-2019
  | 
	2.25
  | 
	mounting control sticks and assembly
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 03-16-2019
  | 
	11.00
  | 
	Assembly of push rods
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-09-2019
  | 
	2.50
  | 
	Bell housing assembly and fabricate the push-rod
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 02-24-2019
  | 
	1.00
  | 
	Cut part of the counter weight from the right elev
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 02-13-2019
  | 
	1.50
  | 
	Bolting on concontrol surfaces
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 02-11-2019
  | 
	2.50
  | 
	After removing and deburring the horizontan and ve
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 02-09-2019
  | 
	0.00
  | 
	Squaring the vertical stabilizer
  | 
	
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 02-09-2019
  | 
	8.00
  | 
	Mounting/attaching vertical stab.
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 02-06-2019
  | 
	1.50
  | 
	Removed red copy and band, installed blue copy and
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 02-04-2019
  | 
	1.00
  | 
	Temporary mount the vertical stabilizer
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 01-26-2019
  | 
	4.25
  | 
	Mounting horizontal stabilizer
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 01-24-2019
  | 
	2.50
  | 
	Vinyl wrap the rear yoke bracket, left throttle as
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 01-22-2019
  | 
	1.25
  | 
	Match drill and rivet nuteplates on throttle assem
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 01-19-2019
  | 
	6.00
  | 
	interior console and throttle assembly
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 01-17-2019
  | 
	1.00
  | 
	Wrap upper rear baggage compartment skin
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 01-17-2019
  | 
	3.00
  | 
	design and cut out pieces for a rear tail ski rack
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 01-16-2019
  | 
	3.00
  | 
	Wrap pieces of the seat ramp assembly and rear bag
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 01-15-2019
  | 
	1.75
  | 
	Match drill, debur, dimple, and rivet seat ramp ri
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 01-11-2019
  | 
	2.25
  | 
	Match drilling, deburing, and riveting nutplates
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 01-10-2019
  | 
	1.75
  | 
	Debur match dril cover plates for lower midcross m
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 01-09-2019
  | 
	2.50
  | 
	Rivet stiffiners and wrap both rear floor skins
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 01-07-2019
  | 
	2.25
  | 
	Remove and replace some hardward, rivet nutplates 
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 01-05-2019
  | 
	4.00
  | 
	Rivet and wrap forward floor skin
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 01-02-2019
  | 
	1.50
  | 
	Riveting nutplates and stiffiners
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 01-01-2019
  | 
	9.00
  | 
	Deburing, match drilling, dimpling, and more debur
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 12-31-2018
  | 
	2.50
  | 
	match drill and deburring
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 12-29-2018
  | 
	2.00
  | 
	Drill small angles for platenuts and front seat hi
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 12-28-2018
  | 
	4.00
  | 
	Inventory parts bags
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 12-27-2018
  | 
	4.00
  | 
	Recieve Finishing Kit unpacking and inventory part
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 12-25-2018
  | 
	5.00
  | 
	Match drilling floor assembly
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 12-24-2018
  | 
	2.00
  | 
	Deburring and clecoing the floor assembly
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 12-22-2018
  | 
	6.00
  | 
	Continued work on interiors
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 12-20-2018
  | 
	2.00
  | 
	Riveted cooling ramp
  | 
	
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 12-18-2018
  | 
	2.00
  | 
	seal up cooling ramp
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 12-15-2018
  | 
	10.50
  | 
	Rear seat back and interior finish
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 12-14-2018
  | 
	1.50
  | 
	Bolt the right side skins to Gear Leg weldament
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 12-01-2018
  | 
	3.00
  | 
	Vinyl wrapped the front seat assembly
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 12-01-2018
  | 
	1.50
  | 
	install the screws/bolts on the left side
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 12-01-2018
  | 
	4.00
  | 
	Front seat assembly
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 11-30-2018
  | 
	1.50
  | 
	Removing gear legs
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 11-24-2018
  | 
	4.50
  | 
	Riveting the side skins to lower longerons/gear bo
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 11-24-2018
  | 
	1.50
  | 
	front seat assembly
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 11-21-2018
  | 
	2.00
  | 
	More riveting for the bottom skins attachement to 
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 11-19-2018
  | 
	2.50
  | 
	Rivet bottom forward skins to gear leg rib and sid
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 11-17-2018
  | 
	1.50
  | 
	Rivet the two forward bottom skins to floor assemb
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 11-16-2018
  | 
	2.50
  | 
	Tank seal applied to foreward skins
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 11-15-2018
  | 
	1.50
  | 
	Riveting bottom skins to fuselage
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 11-12-2018
  | 
	8.00
  | 
	Match drill, Debur, and dimple bottom forward skin
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 11-10-2018
  | 
	2.50
  | 
	Assembly of bottom skins
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 11-08-2018
  | 
	3.00
  | 
	Drilling and bolting the left gear leg
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 11-07-2018
  | 
	3.25
  | 
	Drilling, deburing, and bolting right gear leg
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 11-06-2018
  | 
	2.00
  | 
	Measuring again and again, still not cutting/drill
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 11-05-2018
  | 
	2.25
  | 
	Measure and move.  Finally drilling outer wear pla
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 11-02-2018
  | 
	2.00
  | 
	Attaching main gear legs
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 10-30-2018
  | 
	1.50
  | 
	Drill main 7/16" holes in bracket and friction pla
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 10-26-2018
  | 
	2.50
  | 
	Rivet and bolt the seatback plate to the siderails
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 10-25-2018
  | 
	1.75
  | 
	Rivet seat back plate
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 10-24-2018
  | 
	2.00
  | 
	Rivet siderails to the fuselage assembly
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 10-23-2018
  | 
	1.50
  | 
	Rivet armrest and bulkhead assembly
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 10-22-2018
  | 
	1.50
  | 
	Final dril and bolt rear seat belt mounts
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 10-20-2018
  | 
	1.50
  | 
	Wrap vinyl on front bagage area
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 10-17-2018
  | 
	1.50
  | 
	
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 10-06-2018
  | 
	6.00
  | 
	More vinyl wrapping for interior finish
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 10-02-2018
  | 
	1.75
  | 
	Laying vinyl for interior
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 09-30-2018
  | 
	3.50
  | 
	laying vinyl for some of the finish
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 09-29-2018
  | 
	7.00
  | 
	Finished up riveting the middle bottom skins and r
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-24-2018
  | 
	3.50
  | 
	set and rivet bottom middle skin
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 09-22-2018
  | 
	10.00
  | 
	Finished riveting both left and right side skins. 
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-20-2018
  | 
	1.75
  | 
	Vinyl wrap some pieces
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 09-20-2018
  | 
	1.50
  | 
	Rivet pieces of the right rear skin
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 09-19-2018
  | 
	1.50
  | 
	Riveting left rear side skin to lower longeron
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 09-18-2018
  | 
	2.00
  | 
	Riveting rear side skins
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 09-17-2018
  | 
	1.50
  | 
	Wrapped the right gear box to match efforts on the
  | 
	
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 09-16-2018
  | 
	2.00
  | 
	Vinyl wrap for left gear column
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 09-15-2018
  | 
	7.00
  | 
	finished up the riveting on the mid skins
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-13-2018
  | 
	2.00
  | 
	Spend an hour riveting mid skins
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-07-2018
  | 
	1.50
  | 
	riveting mid sikin
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 09-05-2018
  | 
	1.50
  | 
	Rivet left mid skin
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 09-04-2018
  | 
	1.50
  | 
	Riveting the left mid skin
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 08-25-2018
  | 
	5.00
  | 
	Rivet the forward skins
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 08-24-2018
  | 
	2.00
  | 
	Rivet forward skins
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 08-23-2018
  | 
	2.25
  | 
	Cleco parts together
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-22-2018
  | 
	3.75
  | 
	Rear bulkhead assembly
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-21-2018
  | 
	3.50
  | 
	Side Skin riveting and assembly
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-20-2018
  | 
	3.25
  | 
	Rivet rear bagage ribs and bulkhead
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-15-2018
  | 
	1.25
  | 
	Tank sealer to forward side skins
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 08-11-2018
  | 
	7.50
  | 
	Assembly and rivet sections and route fuel and ven
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-11-2018
  | 
	2.50
  | 
	Access panels in gear box
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 08-09-2018
  | 
	2.50
  | 
	Access panels in gear box
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 08-08-2018
  | 
	2.00
  | 
	Back riveting mid side skins and start reassembly 
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-07-2018
  | 
	2.00
  | 
	Rivet the Mid structure arm rest and bulkheads tog
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 08-06-2018
  | 
	2.50
  | 
	Attachement of the forward and mid floor
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 08-04-2018
  | 
	6.00
  | 
	Begin the reassembly of the fuselage parts
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-03-2018
  | 
	3.50
  | 
	Deburing, dimpling, and priming
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 08-02-2018
  | 
	2.75
  | 
	Deburing and dimpling
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 08-01-2018
  | 
	1.00
  | 
	Deburing and dimpling bulkhead and pieces in fusel
  | 
	
		 | 
	
	          | 
 
	
  | 
	
	
	 07-30-2018
  | 
	2.00
  | 
	Deburing and dimpling fuselage pieces
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 07-21-2018
  | 
	5.50
  | 
	More deburing, dimpling
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 07-18-2018
  | 
	1.50
  | 
	Debur and dimple the Left forward skin
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 07-17-2018
  | 
	2.50
  | 
	Deburing and dimple mid skins
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 07-16-2018
  | 
	1.50
  | 
	Debur, dimple, left side tail skin
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 07-14-2018
  | 
	8.50
  | 
	Deburing, painting, and dimpling
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 07-13-2018
  | 
	2.00
  | 
	Countersinking
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 07-10-2018
  | 
	2.00
  | 
	Countersink dimple and deburing
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 07-07-2018
  | 
	9.00
  | 
	Match drilling, disassembly, and deburing
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 07-05-2018
  | 
	1.00
  | 
	Cut shape out of tail skin for tailwheel assembly
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 07-04-2018
  | 
	6.00
  | 
	Braces for rear seat roll bar and tail wheel
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 06-27-2018
  | 
	2.00
  | 
	Drilling and clecoing
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 06-26-2018
  | 
	3.25
  | 
	Match drilling and clecoing
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 06-23-2018
  | 
	5.50
  | 
	Match drill mid skins and bottom skins.  Drill upp
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 06-21-2018
  | 
	2.50
  | 
	Match drill front skins, Drill holes for top longe
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 06-20-2018
  | 
	2.00
  | 
	Drilling the forward uper Longerons and forward sk
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 06-18-2018
  | 
	2.00
  | 
	Align and match drill the lower and mid longerons
  | 
	
		 | 
	
	          | 
 
	
  | 
	
	
	 06-16-2018
  | 
	6.25
  | 
	Upper longerons, Rails, and box covers
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 06-15-2018
  | 
	2.50
  | 
	Bottom skin
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 05-31-2018
  | 
	1.00
  | 
	Cleco tail assembly together with bulkheads and si
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-28-2018
  | 
	5.00
  | 
	Deburing skins and lower/mid longeron
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-26-2018
  | 
	8.50
  | 
	construction of the rear bulkheads for the tail as
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 05-24-2018
  | 
	2.50
  | 
	Rear bulkhead assembly
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 05-23-2018
  | 
	1.50
  | 
	Tail bulkhead assembly
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 05-22-2018
  | 
	2.50
  | 
	Tail bulkhead assembly
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-21-2018
  | 
	3.00
  | 
	Cleco structure and skin
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 05-19-2018
  | 
	1.50
  | 
	Disassemble and re-clecoe the left and right mid s
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 05-16-2018
  | 
	2.00
  | 
	Match drill and cleco left forward skin
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 05-12-2018
  | 
	1.50
  | 
	Clecoe arm rest structure
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 05-09-2018
  | 
	2.00
  | 
	Cut vent lines and clecoed the floor assembly toge
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-08-2018
  | 
	2.00
  | 
	forming the mid skins
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 05-07-2018
  | 
	1.75
  | 
	Deburing parts, countersinking nutplates, and rive
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 05-05-2018
  | 
	4.50
  | 
	Deburing arm rest
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 05-03-2018
  | 
	1.50
  | 
	Longeron and gussett fitting
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 05-02-2018
  | 
	1.50
  | 
	Lower right longeron assembly
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 04-30-2018
  | 
	2.00
  | 
	Lower left longeron
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 04-28-2018
  | 
	3.50
  | 
	Fitting lower left longeron
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 04-26-2018
  | 
	2.00
  | 
	Gussets for mid and lower longerons
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 04-25-2018
  | 
	2.00
  | 
	Bending gear box and bulkhead gusset / web enclosu
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-23-2018
  | 
	3.00
  | 
	Forming up the left and right upper longerons
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 04-21-2018
  | 
	6.50
  | 
	Seat/floor assembly and longerons
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-19-2018
  | 
	2.00
  | 
	Rivet inbound forward and aft ribs
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 04-18-2018
  | 
	1.50
  | 
	Rivet seat bulkhead
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 04-14-2018
  | 
	4.00
  | 
	Deburing and assembly of floor ribs
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 04-12-2018
  | 
	1.50
  | 
	deburing
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 04-11-2018
  | 
	2.50
  | 
	Uncleco parts parts and start deburing holes and e
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 04-10-2018
  | 
	2.00
  | 
	clecoed the floor assembly and match drilled botto
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 04-07-2018
  | 
	7.00
  | 
	Floor assembly and Aileron trim brackets
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-06-2018
  | 
	1.00
  | 
	Fabricate 805 support tabs
  | 
	
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 03-31-2018
  | 
	9.50
  | 
	Finish up the bulkhead assembly and start the rear
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-29-2018
  | 
	2.50
  | 
	Bulkhead assembly
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 03-26-2018
  | 
	2.50
  | 
	Riveting bulkhead assembly
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-24-2018
  | 
	9.00
  | 
	Began the center substructure / bulkhead assembly
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-23-2018
  | 
	2.00
  | 
	finishing up the baggage assembly
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 03-21-2018
  | 
	2.00
  | 
	Forward bagage assembly
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 03-19-2018
  | 
	2.00
  | 
	Debur and flute bagage area assembly
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 03-17-2018
  | 
	7.50
  | 
	Riveted the box assemblies to the floor assembly
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-17-2018
  | 
	4.00
  | 
	Finishing up the gear box assemblies
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 03-15-2018
  | 
	2.00
  | 
	Rivet the left gear box assembly
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 03-14-2018
  | 
	3.50
  | 
	Riveting and deburing
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 03-12-2018
  | 
	1.50
  | 
	Countersinking and deburing right box assembly
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 03-10-2018
  | 
	4.00
  | 
	Countersinking, deburing, and riveting of floor as
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-10-2018
  | 
	5.25
  | 
	Box gear assembly, clecoing, match drill and debur
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 03-08-2018
  | 
	2.50
  | 
	Dimple / Deburing floor assembly
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 03-05-2018
  | 
	6.50
  | 
	Forward floor assembly
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 02-28-2018
  | 
	2.00
  | 
	Riveting structure to firewall
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 02-26-2018
  | 
	3.00
  | 
	Dimple and start riveting structure to firewall
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 02-24-2018
  | 
	8.50
  | 
	Began Firewall assembly
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 01-10-2018
  | 
	2.00
  | 
	Inventory
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 01-09-2018
  | 
	4.00
  | 
	Unpacking and inventory
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 01-08-2018
  | 
	3.50
  | 
	Unpacking crate and inventory parts
  | 
	
			Details 
		 | 
	
			      
				  
		        |