KitLog pro

Powered By Kitlog Pro v2.0

Bobs Ten

Builder:
Robert Lussow
Location:
Sunman, IN - USA
Aircraft:
Vans - RV-10
Manufacturer:   
http://www.vansaircraft.com/
Engine:
-
Prop:
-
Total Build Time:
1947 Hours

Welcome to my Experimental Aircraft Web Site.

Recent Activity
 Date Hours Work Log Summary Details
 08-12-2018
2.0
Install Door Warning Wiring
Details

 08-11-2018
1.5
Install Backbone Wiring
Details
       

 08-11-2018
1.0
Install Backbone Wiring
Details
       

 08-06-2018
2.0
Install Backbone Wiring
Details
       

 08-05-2018
2.3
Install Backbone Wiring
Details
       

 08-04-2018
1.2
Install Conduit Supports
Details
       

 08-03-2018
3.1
Install Backbone Wiring
Details
       

 08-02-2018
1.4
Install Backbone Wiring
Details
       

 07-06-2018
6.0
Install Main DC Contactor Deck
Details
       

 07-03-2018
1.2
Install Alternator Wiring
Details
       










Copyright © 2001-2018 Matronics. All Rights Reserved.