First task today was to leak check the aircraft. No leaks noted.
I installed the flap switch handle.
I then decided to remove the lft sidewall panel in order to run the Batery 1 power source. This wire is necessary to provide power to the EFII coontroller clock. The seat was removed, the side panel removed, and the flap torque tube cover removed.
The remainder of the time was spent configuring the EFII and G3X systems...