KitLog pro

Powered By Kitlog Pro v2.0

Wendells RV-6A
' style=
Date:  8-29-2020
Number of Hours:  1.00
Manual Reference:  Prime Parts
Brief Description:  Prime VS parts

Last job of the day inbetween heavy downpours. Cleaned, scotchbrited, then primed the 3 parts that will get riveted together with 11 AD4s. As I recall, I had to remove 7/16 inch piece off the end of the VS front spar to bring the VS into proper position.
' style=

F681 on left. 1/4 inch spacer on right.

F681 on left. 1/4 inch spacer on right.

' style=

VS front spar.

VS front spar.

' style=

Same.  Rear spar in background.

Same. Rear spar in background.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.