KitLog pro

Powered By Kitlog Pro v2.0

Wendells RV-6A
Work Logs Found: 714
Category Work Time: 2354 Hours
 Date
Hours
Work Log Summary

Details

 04-04-2024
5.00
Troubleshoot ElectroAir Failure
Details
       

 03-12-2024
6.00
Engine Start
Details
       

 03-08-2024
7.00
Install Top Skin and Canopy
Details
       

 02-01-2024
1.00
Seal Wiring Passthrough Openings
Details
       

 01-03-2024
2.00
Add Belly Antenna for GTN750 Com
Details
       

 01-02-2024
2.00
Update to latest Pressure Senders
Details
       

 11-28-2023
1.00
Re-test Starter Performance
Details
       

 11-27-2023
2.00
Testing CO Monitor
Details

 11-16-2023
2.00
Add Guardian CO Detector to Panel
Details
       

 10-31-2023
2.00
Test Starter Action
Details
       

 10-17-2023
2.00
Fix Boost Pump and Test Flows
Details
     

 10-11-2023
2.00
Getting ready for engine start
Details
       

 10-10-2023
2.00
Rigged Fuel Lines to measure fuel flow.
Details
       

 10-06-2023
1.00
Set ElectroAir Timing to Top Dead Center
Details
       

 10-05-2023
2.00
Install MTH (Mag Timing Housing)
Details
       

 09-26-2023
2.00
Connect New Switch Panel
Details
       

 09-20-2023
2.00
Continue Harness Install
Details
       

 09-19-2023
2.00
Replace Key Switch
Details
       

 09-15-2023
3.00
Made the plug connections
Details
       

 09-14-2023
3.00
Routing Harnesses
Details
       

 09-11-2023
5.00
Install ElectroAir EIS System
Details
       

 09-01-2023
3.00
Install Two SV-HDX1100
Details
       

 08-22-2023
3.00
Finish making Oil Door
Details
       

 08-21-2023
3.00
Make Oil Access Door
Details
       

 06-22-2023
5.00
Install Hinge Covers
Details
       

 05-13-2023
2.00
Finish cutouts for the Hinge Wire Covers
Details
       

 05-12-2023
3.00
Prepared Cowl for Hinge wire end covers
Details
       

 05-09-2023
4.00
Forward Cowl Gaps Filled
Details
       

 03-28-2023
2.00
Fill fiberglass gaps
Details
       

 02-09-2023
2.00
Install Spinner
Details
       

 02-08-2023
1.00
Rear Spinner Bulkhead
Details
       

 02-06-2023
1.00
Torque and Safety Wire Prop Bolts
Details
       

 01-23-2023
2.00
Reinstall Left Fuel Tank
Details
       

 01-15-2023
2.00
ProSeal Access Covers
Details
       

 12-02-2022
2.00
Anti Rotation Device
Details
       

 11-18-2022
4.00
Calibrate Right Fuel Tank
Details
       

 11-17-2022
0.00
Left Fuel Tank Leak
Details
       

 11-16-2022
4.00
Calibrate Left Fuel Tank
Details
       

 11-07-2022
4.00
Calibrate Fuel Tanks
Details
       

 11-06-2022
8.00
Made Lower Aluminum Stabilizer Fairings
Details
       

 11-05-2022
5.00
Form-fitting forward curves
Details
       

 11-04-2022
5.00
Epoxy filler in small gaps
Details
       

 11-02-2022
5.00
Drill and install fairing
Details
       

 10-14-2021
3.00
Fit the Fairing
Details
       

 10-13-2021
4.00
Adjust Elevator Travel
Details

 10-12-2021
4.00
Bolt elevators together
Details
       

 09-15-2021
8.00
Attach elevators together
Details
       

 07-03-2021
5.00
Brake Line Bubbles
Details
       

 07-02-2021
6.00
Bleed Brake Lines
Details
       

 06-10-2021
2.00
Connected trim motor to wire run
Details
       

 06-04-2021
3.00
Cushion brake line in fuselage
Details
       

 05-28-2021
2.00
Interior brake lines
Details
       

 05-28-2021
5.00
Copilot brake line
Details
       

 05-27-2021
8.00
Connect caliper to brake line
Details
       

 05-10-2021
8.00
Route brake lines
Details
       

 04-08-2021
4.00
Temporary fitting center console covers.
Details
       

 04-06-2021
4.00
Attach left tank to fuel line
Details
       

 04-05-2021
6.00
Run right fuel line into selector valve
Details
       

 03-31-2021
5.00
Run left fuel line into fuel selector
Details
       

 03-26-2021
6.00
Mounted top VHF Antenna
Details
       

 03-25-2021
6.00
Connected Archer Antenna to GTN750
Details
       

 03-24-2021
3.00
Install Left Wing Tip
Details
       

 03-16-2021
5.00
Wing tip install
Details
       

 03-12-2021
1.00
Taxi light lens2
Details
       

 03-12-2021
4.00
Taxi light lens
Details
       

 03-10-2021
3.00
Taxi light install continued
Details
       

 03-09-2021
5.00
Wire up the taxi light
Details
       

 03-07-2021
5.00
Continue installing Taxi Light
Details
       

 03-06-2021
6.00
Add Taxi light
Details
       

 03-04-2021
4.00
Install Aero Pulsar NSP Lights
Details
       

 03-01-2021
4.00
Misc Install Pics
       

 02-28-2021
6.00
Attach Nav/Strobe mount in wingtip
Details
       

 02-25-2021
5.00
Wing Tip Install Continued
Details
       

 02-22-2021
8.00
Continue installing wingtip
Details
       

 02-02-2021
6.00
Fit tips to wing for hinge attachments
Details
       

 01-21-2021
3.00
Repair APRS unit
Details
     

 01-14-2021
8.00
Installed electric trim
Details
       

 01-13-2021
3.00
Re-attached welded horn
Details
       

 12-16-2020
5.00
Finish ELT Install
Details
       

 11-15-2020
4.00
New ACK ELT and NAV/STROBE wiring
Details
       

 11-03-2020
3.00
Run Alternate Static Line Forward
Details
       

 11-03-2020
4.00
Attach Fiberglass Caps
Details
       

 11-02-2020
5.00
Connect Pitot/AOA lines to ADAHRS
Details
       

 11-01-2020
4.00
Left Elevator Horn Mismatch
Details
       

 09-24-2020
0.00
Make Rudder Stops 2
Details
       

 09-24-2020
4.00
Make Rudder Stops
Details
       

 09-23-2020
0.00
Make Rudder Cable Links 2
Details
       

 09-23-2020
4.00
Make Rudder Cable Links
Details
       

 09-02-2020
4.00
Reverse Bolt Direction
Details
       

 09-01-2020
1.00
Fitting elevators to Horizontal Stabilizer
Details
       

 08-31-2020
0.00
Mount VS for final time 2
Details
       

 08-31-2020
6.00
Mount VS for final time
Details
       

 08-29-2020
1.00
Prime VS parts
Details
       

 08-29-2020
6.00
Finish Drilling Vertical Stabilizer mount
Details
       

 08-29-2020
2.00
Drill rear VS spar to Fuselage
Details
       

 08-27-2020
3.00
Marking up the F681 for drilling.
Details
       

 08-27-2020
6.00
Final Drill Vertical Stab attach holes.
Details
       

 08-26-2020
5.00
Vertical Stabilizer and Rudder Caps
Details
       

 08-26-2020
3.00
Squared up the Vertical Stabilizer
Details
       

 08-26-2020
4.00
New leveling process when on its own wheels
Details
       

 08-24-2020
4.00
Add Center Floor F699s
Details
       

 08-06-2020
4.00
Wash off hangar grunge
Details
       

 08-05-2020
4.00
Set Fuselage on its gear permanently
Details
       

 08-04-2020
3.00
Final Day of Spar Installation
Details
       

 08-03-2020
4.00
Right wing F699 bracket
Details
       

 08-01-2020
4.00
Install Rear Spar Bolt
Details
       

 07-30-2020
2.00
Rear Spar Bolt install
Details
       

 07-29-2020
6.00
Continue torquing nuts
Details
       

 07-28-2020
7.00
Torque Main Spar Nuts
Details
       

 07-23-2020
4.00
Insert Right Wing Final Time
Details
       

 07-22-2020
5.00
Fuel Vent and Fuselage Openings
Details
       

 07-21-2020
6.00
Fairing Nutplates
Details
       

 07-20-2020
7.00
Fairing Nutplates
Details
       

 07-16-2020
3.00
Right Wing Fairing Nutplates begin
Details
       

 07-16-2020
6.00
Drill and remove Right Wing
Details
       

 07-15-2020
5.00
Attach left side F699
Details
       

 07-14-2020
6.00
Permanent Attach Left Wing
Details
       

 07-10-2020
8.00
Final Install
Details
       

 07-10-2020
4.00
Begin inserting 40 bolts thru left main spar
Details
       

 07-03-2020
6.00
Install and Wire Heated Pitot
Details
       

 06-23-2020
3.00
Prepare Coiled Fuel Vent Line
Details
       

 06-23-2020
3.00
Install Pitot
Details
       

 06-22-2020
4.00
Reinsert the wing for last time
Details
       

 06-09-2020
5.00
Attach CPVC for Pitot Lines
Details
       

 05-25-2020
4.00
Fuel Tank Removal
Details
       

 05-21-2020
4.00
Trimmed Fairing Edge
Details
       

 05-20-2020
4.00
Install Fairing Nut Plates 2
Details
       

 05-19-2020
8.00
Install Fairing Nut Plates
Details
       

 05-14-2020
4.00
SafeAir Pitot Mast
Details
       

 05-14-2020
1.00
Dynon Heated Pitot
Details
       

 05-12-2020
2.00
Right Wing Fairing 2
Details
       

 05-12-2020
5.00
Right Wing Fairing 1
Details
       

 04-09-2020
4.00
Right Flap Install
Details

 04-09-2020
3.00
Right Aileron Install
Details

 04-07-2020
3.00
Make Aileron Control Tubes
Details
       

 04-07-2020
5.00
Left Flap Install
Details
       

 04-06-2020
4.00
Left Wing Tip
Details
       

 03-28-2020
2.00
Left Flap Install
Details
       

 03-27-2020
4.00
Wing Fairing 3
Details
       

 03-26-2020
1.00
Left Wing Fairing 2
Details
       

 03-26-2020
4.00
Left Wing Fairing 1
Details
       

 03-25-2020
1.00
Vertical Stabilizer
Details
       

 03-25-2020
1.00
Reinforcement
Details
       

 03-07-2020
2.00
Right Wing Forward Attach
Details
       

 03-07-2020
2.00
Left Wing Forward Attach
Details
       

 02-10-2020
3.00
Vertical Stabilizer
Details
       

 02-09-2020
8.00
Install Horizontal Stabilizer
Details
       

 02-08-2020
8.00
Set Sweep and Incidence
Details
       

 08-24-2018
6.00
Left Wing Install
Details
       

 08-23-2018
4.00
Drill out rear spar W407B and Doubler 9
Details

 05-26-2018
2.00
Drill out rear spar W407B and Doubler 8
Details
       

 05-11-2018
4.00
Drill out rear spar W407B and Doubler 7
Details
       

 04-28-2018
1.00
Drill out rear spar W407B and Doubler 6
Details
       

 04-28-2018
4.00
Drill out rear spar W407B and Doubler 5
Details
       

 04-27-2018
1.00
Drill out rear spar W407B and Doubler 4
Details
       

 04-27-2018
4.00
Drill out rear spar W407B and Doubler 3
Details
       

 04-21-2018
0.00
Drill out rear spar W407B and Doubler 2
Details
       

 04-21-2018
3.00
Drill out rear spar W407B and Doubler
Details
       

 04-20-2018
3.00
Trim Right Wing Rear Spar Connection
Details
       

 04-10-2018
4.00
Fuel Tank Attach Brackets to Fuselage
Details
       

 04-05-2018
3.00
Fit wings to fuselage 2nd of 4 times-4
Details
       

 04-05-2018
3.00
Fit wings to fuselage 2nd of 4 times-3
Details
       

 04-05-2018
1.00
Aileron Boots to Seal Fuselage Opening-3
Details
       

 03-29-2018
1.00
Aileron Boots to Seal Fuselage Opening-2
Details
       

 03-29-2018
3.00
Aileron Boots to Seal Fuselage Opening
Details
       

 03-25-2018
0.00
Fit wings to fuselage 2nd of 4 times-2
Details
       

 03-25-2018
6.00
Fit wings to fuselage 2nd of 4 times-1
Details
       

 03-16-2018
0.00
Fit wings to fuselage 1st of 4 times-2
Details
       

 03-16-2018
4.00
Fit wings to fuselage 1st of 4 times-1
Details
       

 03-08-2018
3.00
Test Fit Wing Install
Details
       

 03-06-2018
3.00
Remove Wood Spar
Details
       

 02-26-2018
0.00
Final Move to Airport Hangar 3
Details
       

 02-26-2018
4.00
Final Move to Airport Hangar 2
Details
       

 02-26-2018
4.00
Final Move to Airport Hangar
Details
       

 05-08-2016
4.00
Tape and sand forward canopy
Details
       

 01-18-2016
4.00
Install Canopy into frame
Details
       

 11-12-2015
2.00
Fit Forward Top Skin 3
Details
       

 11-12-2015
5.00
Fit Forward Top Skin 2
Details
       

 10-27-2015
0.00
Forward Fuselage Access Panels5
Details
       

 10-27-2015
6.00
Forward Fuselage Access Panels4
Details
       

 10-12-2015
0.00
Forward Fuselage Access Panels3
Details
       

 10-12-2015
0.00
Forward Fuselage Access Panels2
Details
       

 10-12-2015
7.00
Forward Fuselage Access Panels1
Details
       

 09-26-2015
0.00
Rivet rear window in place 2
Details
       

 09-26-2015
6.00
Rivet rear window in place
Details
       

 09-09-2015
0.00
Rivet Rear Window Topskin 2
Details
       

 09-09-2015
8.00
Rivet Rear Window Topskin 1
Details
       

 09-09-2015
2.00
Made two canopy guide blocks
Details
       

 08-14-2015
0.00
Disassemble Roll Bar for final paint 2
Details
       

 08-14-2015
8.00
Disassemble Roll Bar for final paint
Details
       

 07-16-2015
3.00
Inside Forward Edge Painted Black
Details
       

 07-15-2015
4.00
Sand and Paint Canopy Frame
Details
       

 07-13-2015
2.00
Wired A/P level function to Stick Grips
Details
       

 07-11-2015
4.00
Audio Jacks Install 3
Details

 07-10-2015
2.00
Crack Work 3
Details
       

 07-09-2015
1.00
Crack Work 2
Details
       

 07-09-2015
6.00
Crack Work 1
Details
       

 07-09-2015
0.00
Canopy Countersink 3
Details
       

 07-09-2015
0.00
Canopy Countersink 2
Details
       

 07-09-2015
8.00
Canopy Countersink 1
Details
       

 07-08-2015
5.00
Countersink everything
Details
       

 07-08-2015
4.00
Canopy Trim 14
Details

 07-07-2015
3.00
Install Open/Close Hardware 2
Details
       

 07-07-2015
2.00
Install Open/Close Hardware 1
Details
       

 06-23-2015
3.00
Fit all the parts together
Details
       

 06-19-2015
5.00
Canopy Trim 13
Details
       

 06-15-2015
3.00
Canopy Trim 12
Details
       

 06-12-2015
2.00
Canopy Trim 11
Details
       

 06-12-2015
5.00
Canopy Trim 10
Details
       

 06-07-2015
0.00
Canopy Trim 9B
Details
       

 06-07-2015
0.00
Canopy Trim 9A
Details
       

 06-07-2015
0.00
Canopy Trim 9
Details
       

 06-07-2015
4.00
Canopy Trim 8
Details
       

 06-04-2015
4.00
Canopy Trim 7
Details
     

 06-04-2015
0.00
Canopy Trim 6
Details
       

 06-04-2015
6.00
Canopy Trim 5
Details
       

 05-26-2015
0.00
Canopy Trim 4
Details
       

 05-26-2015
0.00
Canopy Trim 3
Details
       

 05-26-2015
0.00
Canopy Trim 2
Details
       

 05-26-2015
6.00
Canopy Trim 1
Details
       

 05-12-2015
0.00
Audio Jacks Install 2
Details
       

 05-12-2015
7.00
Audio Jacks Install 1
Details
       

 05-10-2015
8.00
Install Tosten Grips 9
Details
     

 05-02-2015
0.00
Install Tosten Grips 8
Details
       

 05-02-2015
6.00
Install Tosten Grips 7
Details
       

 04-30-2015
2.00
Install Tosten Grips 6
Details
       

 04-28-2015
2.00
Install Tosten Grips 5
Details
       

 04-28-2015
1.00
Install Tosten Grips 4
Details
       

 04-28-2015
7.00
Install Tosten Grips 3
Details
       

 04-28-2015
2.00
Install Keyed Lock for Canopy Frame
Details
       

 04-21-2015
0.00
Install Tosten Grips 2
Details
       

 04-21-2015
3.00
Install Tosten Grips 1
Details
       

 04-16-2015
0.00
Canopy Fitting 3 - Preparations
Details
       

 04-16-2015
0.00
Canopy Fitting 2 - Preparations
Details
       

 04-16-2015
2.00
Canopy Fitting 1 - Preparations
Details
       

 04-13-2015
0.00
Instrument Panel made VAF front page today.
Details
       

 04-01-2015
0.00
Finished View of Carbon Fiber Panel 2
Details
       

 04-01-2015
3.00
Finished View of Carbon Fiber Panel 1
Details
       

 03-31-2015
2.00
Apply 3M Carbon Fiber Finish to Panel 2
Details
       

 03-31-2015
4.00
Apply 3M Carbon Fiber Finish to Panel 1
Details
       

 03-30-2015
6.00
Air Vent Mounts and Installation
Details
       

 03-19-2015
5.00
Transponder and ADSB Antennas
Details

 03-19-2015
3.00
Test the Panel Switches
Details
       

 03-19-2015
8.00
Connect all Panel Switches
Details
       

 03-18-2015
30.00
Run Fuselage Wires
Details

 09-11-2014
5.00
Disassemble and Paint Parts
Details
       

 09-08-2014
1.00
Install Aerox Oxygen System 2
Details
       

 09-08-2014
6.00
Install Aerox Oxygen System 1
Details
       

 08-28-2014
0.00
Mounted AK-450 ELT-6
Details
       

 08-28-2014
3.00
Mounted AK-450 ELT-5
Details
       

 08-27-2014
0.00
Install Baggage Tie Downs 4
Details
       

 08-27-2014
0.00
Install Baggage Tie Downs 3
Details
       

 08-27-2014
2.00
Install Baggage Tie Downs 2
Details
       

 08-27-2014
4.00
Install Baggage Tie Downs 1
Details
       

 08-12-2014
2.00
Make Removable Side Covers 2
Details
       

 08-12-2014
6.00
Make Removable Side Covers
Details
       

 08-11-2014
3.00
Mounted AK-450 ELT-4
Details
       

 08-11-2014
8.00
Mounted AK-450 ELT-3
Details
       

 08-11-2014
3.00
ADAHRS wiring 2
Details
       

 08-10-2014
5.00
Wire connections for Flap and Smoke
Details
       

 08-10-2014
8.00
Added more wires to the airplane
Details
       

 07-21-2014
0.50
Smoke System Install 7
Details
       

 07-21-2014
3.00
Smoke System Install 6
Details
       

 07-21-2014
5.00
Smoke System Install 5
Details
       

 07-17-2014
4.00
Wired up Autopilot Servos
Details
       

 07-17-2014
8.00
Wire Dynon Network Bus
Details
       

 07-17-2014
2.00
Mounted AK-450 ELT-2
Details
       

 07-17-2014
5.00
Mounted AK-450 ELT-1
Details
       

 07-17-2014
6.00
ADAHRS wiring
Details
       

 07-07-2014
8.00
Heater Cable Attached
Details
       

 07-07-2014
2.00
Avionics Ground Bus 2
Details
       

 07-07-2014
8.00
Avionics Ground Bus
Details
       

 07-06-2014
8.00
Splice Skyview Serial Wires
Details
       

 07-05-2014
8.00
Lots of Case Grounds
Details

 06-24-2014
8.00
Test Avionics Panel after wiring
Details
       

 05-24-2014
5.00
Skyview System Wiring 2
Details
       

 05-24-2014
5.00
Skyview System Wiring
Details
       

 05-23-2014
8.00
Avionics Interconnects
Details
     

 03-12-2014
0.00
Install Oil Cooler and Brace 2
Details
       

 03-12-2014
2.00
Install Oil Cooler and Brace
Details
       

 03-12-2014
2.00
Install Engine Baffles 20
Details
       

 03-12-2014
0.00
Install Engine Baffles 19
Details
       

 03-12-2014
6.00
Install Engine Baffles 18
Details
       

 03-10-2014
4.00
Firewall Forward Clamps Safety Wired
Details
       

 03-06-2014
3.50
Install Engine Baffles 17
Details
       

 03-03-2014
0.00
Install Engine Baffles 16
Details
       

 03-03-2014
8.00
Install Engine Baffles 15
Details
       

 02-02-2014
0.00
Vans issues Svc Bulletin on Stabilizer Spar
Details
       

 02-02-2014
0.00
Install Engine Baffles 14
Details
       

 02-02-2014
3.00
Install Engine Baffles 13
Details
       

 02-02-2014
8.00
Install Engine Baffles 12
Details
       

 01-16-2014
0.50
Install static air plumbing 3
Details
       

 01-16-2014
2.00
Install Engine Baffles 11
Details
       

 01-15-2014
4.00
Install Engine Baffles 9
Details
       

 01-15-2014
3.00
Install Engine Baffles 10
Details
       

 01-01-2014
2.00
Install static air plumbing 2
Details
       

 01-01-2014
2.00
Install static air plumbing
Details
       

 01-01-2014
4.00
GPS Antenna Tray FWF
Details
       

 12-25-2013
0.00
Xmas Present - Welder
Details
       

 12-23-2013
1.00
Secured the Alternator Field Wire FWF
Details
       

 12-22-2013
1.00
Mag Start Switch 2
Details
       

 12-21-2013
2.00
Mag Start Switch
Details

 12-19-2013
2.00
FWF Sensor wiring continued.-2
Details
       

 12-19-2013
2.00
FWF Sensor wiring continued.
Details
       

 12-18-2013
4.00
Eliminate surplus harness wires.
Details
       

 12-17-2013
4.00
More FWF wiring
Details
       

 12-13-2013
4.00
VPX 3
Details
       

 12-08-2013
2.00
VPX 2
Details
       

 12-08-2013
4.00
VPX
Details
       

 12-05-2013
2.00
Reroute EGT/CHT wires 3
Details
       

 12-05-2013
0.00
Birthday Present - Countdown Timer
Details
       

 11-26-2013
2.00
Attach lugs and permanently mount cable.
Details
       

 11-25-2013
0.00
Skytec XLT starter
Details
       

 11-25-2013
5.00
Route starter wire from firewall to starter.
Details
       

 11-24-2013
6.00
Make and Install Alternator Wire Run
Details
       

 11-18-2013
2.00
Reroute EGT/CHT wires 2
Details
       

 11-18-2013
2.00
Reroute EGT/CHT wires 1
Details
       

 11-18-2013
2.00
Install ASA oil separator 4
Details
       

 11-14-2013
3.00
Install Horizontal Air Intake Plenum 4
Details
       

 11-04-2013
2.00
Install Horizontal Air Intake Plenum 3
Details
       

 11-04-2013
5.00
External Steps 6
Details
       

 11-03-2013
5.00
Install Horizontal Air Intake Plenum 2
Details
       

 11-03-2013
5.00
Fit Cowling 9
Details
       

 11-02-2013
8.00
Fit Cowling 8
Details
       

 10-30-2013
4.00
Fit Cowling 7
Details
       

 10-28-2013
5.00
Fit Cowling 6
Details
       

 10-21-2013
4.00
Prepare PCU5000X Governor 2
Details
       

 10-19-2013
8.00
Install Engine Baffles 8
Details
       

 10-16-2013
4.00
Install Horizontal Air Intake Plenum
Details

 10-14-2013
4.00
Install Engine Baffles 7
Details
       

 09-27-2013
4.00
Install Engine Baffles 6
Details
       

 09-19-2013
2.00
Removed Governor Mounting Studs
Details
       

 09-18-2013
2.00
Prepare PCU5000X Governor
Details
       

 09-13-2013
0.00
Smoke System Install 4
Details
       

 09-13-2013
2.00
Smoke System Install 3
Details
       

 09-13-2013
4.00
Fabricate Lower Cowl Rear Support
Details
       

 08-27-2013
2.50
Smoke System install 2
Details
       

 08-27-2013
0.50
Smoke System Install 1
Details
       

 08-27-2013
0.50
Newest XLT Starter Install
Details
       

 08-20-2013
6.00
Made Oil Door and Attach Parts
Details
       

 08-20-2013
8.00
Fit Cowling 5
Details
       

 08-19-2013
10.00
Install Skybolt Fasteners 2
Details
       

 08-18-2013
6.00
Install Skybolt Fasteners 1
Details
       

 06-04-2013
3.00
Fit Cowling 4
Details
       

 06-02-2013
4.00
Fit Cowling 3
Details
       

 06-02-2013
1.00
Fit Cowling 2
Details
       

 05-31-2013
6.00
Install Prop to facilitate mounting lower cowling.
Details
       

 05-22-2013
0.00
Install Engine Baffles 5
Details
       

 05-22-2013
0.00
Install Engine Baffles 4
Details
       

 05-22-2013
8.00
Install Engine Baffles 3
Details
       

 05-21-2013
0.00
Install Engine Baffles 2
Details
       

 05-21-2013
8.00
Install Engine Baffles 1
Details
       

 05-17-2013
0.00
Fit 7A Tunnel in the 6A - 6
Details
       

 05-17-2013
1.00
Fit 7A Tunnel in the 6A - 5
Details
       

 05-17-2013
2.00
Fit 7A Tunnel in the 6A - 4
Details
       

 05-17-2013
3.00
Fit 7A Tunnel in the 6A - 3
Details
       

 05-16-2013
0.00
Fit 7A Tunnel in the 6A - 2
Details
       

 05-16-2013
8.00
Fit 7A Tunnel in the 6A - 1
Details
       

 05-02-2013
3.00
EGT-CHT Sensors and Misc.
Details
       

 04-30-2013
2.00
Readjust Bendix connections for spacer.
Details
       

 04-24-2013
4.00
Sniffle Valve Installation
Details
       

 04-24-2013
1.00
Install drain line from fuel pump
Details
       

 04-23-2013
0.00
Vetterman Xover Exhaust Installation 3
Details
       

 04-23-2013
0.00
Vetterman Xover Exhaust Installation 2
Details
       

 04-23-2013
5.00
Vetterman Xover Exhaust Installation 1
Details
       

 04-20-2013
2.00
Install Dynon Pitch Servo
Details
       

 04-19-2013
4.00
Install ADAHRS 1 and 2
Details
       

 04-08-2013
2.00
Install ASA oil separator 3
Details
       

 04-08-2013
3.00
Install ASA oil separator 2
Details
       

 04-08-2013
3.00
Install ASA oil separator 1
Details
       

 04-04-2013
1.00
Made new throttle bracket for Superior Sump
Details
       

 04-03-2013
3.00
Attach Mixture;Torque Mounting bolts
Details
       

 04-02-2013
0.00
Installed engine on firewall 3
Details
       

 04-02-2013
0.00
Installed engine on firewall 2
Details
       

 04-02-2013
3.00
Installed engine on firewall
Details
       

 03-28-2013
1.00
Stainless Heater Box
Details
       

 03-28-2013
1.00
Received Oil Separator-Adel clamp fuel line.
Details
       

 03-28-2013
4.00
Oil return line from #4 cylinder
Details
       

 03-28-2013
0.00
Airplane mover - Center Tunnel work
Details
       

 03-28-2013
2.00
Added fittings to mechanical fuel pump
Details
       

 03-15-2013
5.00
Update IO360B1E to IO360WLE
Details
       

 03-15-2013
2.00
Continue modifying engine
Details
       

 03-08-2013
2.00
Parking Brake Cable Install
Details
       

 03-08-2013
6.00
Control Cables
Details
       

 03-02-2013
1.00
Acquaint myself with Oil Cooler stuff
Details
       

 02-28-2013
2.00
Swapped out oil filter mount.
Details
       

 02-26-2013
1.00
Skyview USB Connectors
Details
       

 02-26-2013
4.00
Finish Mounting Parking Brake
Details
       

 02-26-2013
1.00
Control cable support / Alternate Engine Ground
Details
       

 02-22-2013
3.00
Parking Brake Mounting Location
Details
       

 02-21-2013
3.00
Made First Battery Cables
Details
       

 02-21-2013
2.00
First Antenna Cable for Transponder
Details
       

 02-19-2013
2.00
Make Doubler for ANL Fuse Holders
Details
       

 02-18-2013
5.00
Installed ANL Fuse Holders on Firewall
Details
       

 02-17-2013
2.00
Electrical passthrough
Details
       

 02-14-2013
3.00
Installed the recessed firewall section
Details
       

 02-14-2013
4.00
Electrical passthrough
Details
       

 02-13-2013
5.00
Fit the center tunnel and attach to firewall
Details
       

 02-12-2013
5.00
Made Engine Control Bracket
Details
       

 02-07-2013
5.00
Installing more Dynon Modules
Details
       

 02-07-2013
2.00
Added many nut plates to panel and sub panel
Details
       

 02-02-2013
4.00
Install Switches and More Support Ribs
Details
     

 01-31-2013
1.00
Switch Anti-rotation mounting bar.
Details
     

 01-31-2013
5.00
Firewall Openings 3
Details
       

 01-31-2013
2.00
EMS and Manifold Pressure Devices
Details
       

 01-28-2013
2.00
Avionics Cut Outs in Panel 5
Details
       

 01-28-2013
3.50
Avionics Cut Outs in Panel 4
Details
       

 01-26-2013
5.00
Locating and Mounting Vertical Power VPX Pro
Details
       

 01-22-2013
3.00
Firewall Openings 2
Details
       

 01-21-2013
3.00
Firewall Openings 1
Details
       

 01-19-2013
4.00
Avionics Cut Outs in Panel 3
Details
       

 01-17-2013
1.00
Avionics Cut Outs in Panel 2
Details
       

 01-17-2013
3.00
Avionics Cut Outs in Panel 1
Details
       

 01-13-2013
3.00
Canopy 3 Try Air Grinder Cutoff Wheel.
Details
       

 01-12-2013
2.00
Test Fit Avionics and Switches 2
Details
       

 01-12-2013
4.00
Test Fit Avionics and Switches 1
Details
       

 01-11-2013
5.00
Instrument Panel Wood Template
Details
       

 01-10-2013
4.00
Choosing This Layout to Proceed
Details
       

 01-10-2013
3.00
Canopy 2 Try different techniques
Details

 01-08-2013
3.00
Trying Different Layouts in TurboCad
Details
       

 01-02-2013
3.00
Review Panel Template in Place
Details
       

 12-20-2012
6.00
Instrument Panel Layout
Details
       

 12-10-2012
3.00
Rudder Cable Fairing
Details
       

 12-08-2012
2.00
Oil, Fuel, Maniford pressure fittings.
Details
       

 12-06-2012
4.00
Brake Installation 1
Details
       

 11-20-2012
3.00
Finish mounting main wheels
Details
       

 11-19-2012
3.00
Mount Nose Gear and Main Wheels
Details
       

 11-15-2012
2.00
Mount the nose wheel
Details
       

 11-15-2012
1.00
Glue and Rivet NACA Vents
Details
       

 11-14-2012
2.00
AntiSplatAero Skid Plate
Details
       

 11-13-2012
1.00
Riveted F-609 in place
Details
       

 11-08-2012
2.00
AntiSplatAero Nose Wheel Reinforcement
Details
       

 11-07-2012
8.00
Assemble Nose Gear
Details
       

 11-01-2012
4.00
Oil/Fuel pressure manifold to firewall
Details
       

 10-21-2012
4.00
Odyssey 680 Battery Holder
Details
       

 10-19-2012
4.00
Master and Starter Relays Installation
Details
       

 10-18-2012
3.00
Engine Mount Installed
Details
       

 10-18-2012
2.00
Canopy 1
Details
       

 10-16-2012
0.00
Cleveland Wheels / Brakes - 2
Details
       

 10-16-2012
4.00
Cleveland Wheels / Brakes - 1
Details
       

 10-14-2012
2.00
Push Rod 2 - F-690
Details
       

 10-14-2012
3.00
Push Rod 1 - F-689
Details
       

 10-13-2012
0.00
Fuselage Preparation for Canopy 2
Details
       

 10-13-2012
3.00
Fuselage Preparation for Canopy 1
Details
       

 10-11-2012
1.00
Canopy Frame 19 - Skin riveted on
Details
       

 10-10-2012
3.00
Canopy Frame 18 - Apply finish paint
Details
       

 10-09-2012
4.00
Arm Rests - Instrument Panel Angles
Details
       

 10-08-2012
4.00
Canopy Frame 17 - Prime all frame parts
Details
       

 10-07-2012
6.00
Elevator Tubes- Skins Primed
Details
       

 09-25-2012
3.00
Instrument Panel 2
Details
       

 09-24-2012
4.00
Canopy Frame 16 Flush Fit the Canopy Skin
Details
       

 09-22-2012
4.00
Instrument Panel 1
Details
       

 09-08-2012
4.00
Canopy Frame 15- Finish Drilling the Glare Shield
Details
       

 09-05-2012
2.00
Canopy Frame 14- Trim Canopy Skin more.
Details
       

 09-04-2012
6.00
Canopy Frame 13 - Strut installation
Details
       

 09-01-2012
6.00
Canopy Frame 12 - More Fwd Skin Trimming
Details
       

 08-28-2012
8.00
Canopy Frame 11 - Reinforcement Kit
Details
       

 08-24-2012
6.00
Canopy Frame 10 - Fix hinge arm problem..
Details
       

 08-22-2012
8.00
Fit and Rivet Forward Ribs and SubPanel
Details
       

 08-13-2012
4.00
Canopy Frame 9 - Another Fix Required
Details
       

 08-09-2012
4.00
Fit Forward Top Skin
Details
       

 08-01-2012
3.00
Tweak Upper Forward Fuselage Ribs
Details
       

 07-31-2012
1.00
Canopy Frame 8
Details
     

 07-31-2012
2.00
Canopy Frame 7 - Reinforcement kit.
Details
       

 07-29-2012
3.00
External Steps 5
Details
       

 07-24-2012
5.00
Canopy Frame 6 - Side frame fitted
Details
       

 07-23-2012
6.00
Canopy Frame 5
Details
       

 06-22-2012
0.00
External Steps 4
Details
       

 06-22-2012
4.00
External Steps 3
Details
       

 06-20-2012
3.00
Fabricated Forward Canopy Stops
Details
       

 06-19-2012
6.00
Made Canopy Lift Strut Hardware
Details
       

 06-18-2012
6.00
Drilled Canopy Hinges
Details
       

 06-15-2012
0.00
Canopy Frame 4
Details
       

 06-15-2012
2.00
Canopy Frame 3 - Check clearances everywhere
Details
       

 06-15-2012
2.00
Canopy Frame 2 - Begin Fitting Forward Canopy Fram
Details
       

 06-15-2012
2.00
Canopy Frame 1 - Rough fit the forward canopy tip
Details
       

 06-13-2012
8.00
Prime parts and assemble
Details

 06-12-2012
6.00
Remake Sub Panel and supporting structure
Details
       

 06-07-2012
6.00
Skin work
Details
       

 05-22-2012
1.00
External Steps 2. Why doesn't it fit correctly?
Details
       

 05-18-2012
3.00
External Steps 1
Details
       

 05-12-2012
8.00
F-674 Aft Top Skin 1
Details
       

 05-06-2012
2.00
F-675 Aft Top Skin 3
Details
       

 05-06-2012
3.00
F-675 Aft Top Skin 2
Details
       

 05-04-2012
6.00
F-675 Aft Top Skin 1
Details
       

 05-02-2012
4.00
Replace F-607 Bulkhead half and J Stringer
Details
       

 05-01-2012
2.00
#2 F-607 right half removed and replaced.
Details
       

 05-01-2012
2.00
#1 F-631 Roll Bar AN509 attachments
Details
       

 04-30-2012
1.00
F-631 Roll Bar Attachment #2
Details
       

 04-30-2012
2.00
F-631 Roll Bar Attachment #1
Details
       

 04-27-2012
1.00
F-631 C/D Final Drilled for AN4 bolts #2
Details
       

 04-27-2012
2.00
F-631 C/D Final Drilled for AN4 bolts #1
Details
       

 04-26-2012
2.00
F-631 Roll Bar #3 Today
Details
       

 04-26-2012
2.00
F-631 Roll Bar #2 Today
Details
       

 04-26-2012
2.00
F-631 Roll Bar #1 Today
Details
       

 04-25-2012
3.00
F-631 Roll Bar #3 Today
Details
       

 04-25-2012
1.00
F-631 Roll Bar #2 Today
Details
       

 04-25-2012
1.00
F-631 Roll Bar #1 Today
Details
       

 04-24-2012
3.00
Rivet Roll Bar Cont'd.
Details
       

 04-24-2012
3.00
Rivet F-631 Roll Bar Together
Details
       

 04-23-2012
2.00
Primed the roll bar for riveting
Details
       

 04-20-2012
2.00
New bearing and safety wire flap actuator
Details
       

 04-19-2012
8.00
Finished roll bar and ready for primer
Details
       

 04-16-2012
3.00
Done drilling to #40. Ready to enlarge to #30
Details
       

 04-14-2012
6.00
Roll Bar remake
Details
       

 04-13-2012
8.00
Drill Out 192 rivets for some practice.
Details
       

 04-10-2012
4.00
Permanently mount the rudder-brake hardware
Details
       

 04-06-2012
1.00
Drilled NACA vents to fuselage
Details
       

 04-05-2012
2.00
Cut out NACA vents on fuselage
Details
       

 04-04-2012
3.00
Position NACA Vents on Fuselage
Details
       

 03-30-2012
2.00
Riveted the rest of the F631 Roll Bar
Details
       

 03-29-2012
2.00
Rivet F631A - B- E Together
Details
       

 03-29-2012
8.00
Primed many parts today
Details
       

 03-27-2012
1.00
Safety Wire on Flap Actuator
Details
       

 03-26-2012
1.00
Drill Flap Actuator Shaft for Safety Wire
Details
       

 03-22-2012
2.00
Another Quickbuild Mistake Discovered
Details
       

 03-19-2012
3.00
Made remaining F-621B Canopy Deck Rail
Details
       

 03-15-2012
5.00
Counter sink the F-631
Details
       

 03-14-2012
3.00
Made remaining parts to attach the F-632 brace
Details
       

 03-13-2012
0.50
Remove Moisture from Dessicant
Details
       

 03-12-2012
6.00
Drill Joint Strips into Forward Roll Bar Half
Details
       

 03-11-2012
8.00
Construct F631A Roll Bar
Details
       

 03-10-2012
1.00
Make the elevator bellcrank
Details
       

 03-08-2012
4.00
Long Bolts and Return Springs
Details
       

 03-07-2012
6.00
Position and drill brake pedals
Details
       

 03-06-2012
6.00
See how brake pedals fit.
Details
       

 03-06-2012
6.00
Prepare Rudder Pedals
Details
       

 03-05-2012
1.00
Riveted Seat Back Braces to F605
Details
       

 03-04-2012
6.00
Make F-620 arm rest with forming blocks
Details
       

 03-03-2012
3.00
Put some floor panels in place to have a look..
Details
       

 03-02-2012
4.00
Insalled roll servo -bracket- and hardware
Details
       

 03-01-2012
8.00
JD Air Canopy Latch and attaching hardware.
Details
       

 03-01-2012
2.00
Install the Shoulder Harness Anchors
Details
       

 02-29-2012
8.00
Flap Motor Install
Details
       

 02-28-2012
8.00
Rivet the crotch straps in place
Details
       

 02-26-2012
8.00
EAA Electrical Systems, Wiring, Avionics Workshop
Details
       

 02-25-2012
8.00
Attend EAA Electrical Systems, Wiring, Avionics Cl
Details
       

 02-24-2012
8.00
Finally a day to prime
Details
       

 02-20-2012
8.00
Fit the electric flap housing
Details
       

 01-30-2012
8.00
Prepare Control Sticks
Details
       

 01-28-2012
6.00
Temp mounted the gear weldments and main gear
Details
       

 01-17-2012
8.00
Install Flap Weldment
Details
       

 01-12-2012
5.00
Forward Seat Pans
Details
       

 01-11-2012
4.00
Finished Pilot Seat Pan
Details
       

 01-08-2012
4.00
Install nut plates and final fit.
Details
       

 12-19-2011
6.00
Nutplates, Seat Hinges, and more floor work
Details
       

 11-19-2011
2.00
Install Canopy Latch
Details
       

 11-18-2011
1.00
Sold SL30 and GNS430W for new GTN750
Details
       

 11-18-2011
3.00
Prepare the Tip Up Canopy Latch
Details
       

 08-11-2011
1.00
Install Roll Servo bracket and test fit.
Details
       

 08-10-2011
1.50
WD-610 Control/Elevator Tube Fitted
Details
       

 07-28-2011
3.00
Finished enlarging required holes
Details

 07-19-2011
4.00
Enlarge Spar and Gear Weldment Holes
Details
       

 07-18-2011
2.00
Gear Weldment Spacer and Canopy Deck top.
Details
       

 07-13-2011
1.00
F657 on quickbuild are backwards!!
Details
       

 07-08-2011
6.00
Gear Weldments positioned and drilled
Details
       

 07-06-2011
3.00
Preparing Main Gear Weldments
Details
       

 06-27-2011
1.00
Fitted Seat Pans to floor ribs
Details

 06-25-2011
3.00
Changed the Fuselage Stand
Details
       

 06-16-2011
3.00
Manual Flap Mechanism - for someone else
Details
       

 05-25-2011
3.00
Rivet bottom outboard skin
Details
       

 05-23-2011
1.00
Installed larger electrical conduit
Details
       

 05-22-2011
3.00
Right Flap Brace
Details
       

 05-21-2011
3.00
Rivet on the Aileron Gap Seals
Details
       

 05-20-2011
0.00
Ordered Panel Components
Details
     

 05-20-2011
3.00
Finish last priming of wing spar
Details
       

 05-14-2011
2.00
Finish left flap
Details
       

 05-10-2011
2.00
Rivet Left Flap
Details
       

 05-09-2011
4.00
Finish 2nd set of flaps
Details
       

 05-06-2011
2.00
Rivet seats together
Details
       

 05-04-2011
2.00
Prime seat parts and other misc parts
Details
       

 05-04-2011
5.00
Flap parts get primed
Details
       

 04-21-2011
3.00
Misc finish parts on aileron
Details

 04-15-2011
3.00
Finish preparing both flap assemblies
Details

 03-15-2011
4.00
Completed Left Flap Construction
Details
       

 03-08-2011
4.00
Left Flap Bottom Skin-Ribs-Attach Hardware
Details
       

 03-06-2011
6.00
Flap attach hardware fabricated
Details
     

 03-05-2011
5.00
Make two new flaps
Details
       

 03-01-2011
1.00
Drill Flap Brace to Rear Spar
Details

 02-28-2011
0.50
Shoulder Harness Anchors fitted
Details
       

 02-26-2011
4.00
Rivet Wing Walk Ribs
Details
       

 02-26-2011
2.00
Rivet Bottom Inboard Skin Right Wing
Details
       

 02-25-2011
2.00
Flap Brace countersink
Details
       

 02-24-2011
4.00
Right Wing Flap Brace
Details
       

 02-23-2011
4.00
Drilled Right Flap to Wing
Details
       

 02-21-2011
3.00
Drilled Left Flap to Wing
Details
       

 02-02-2011
2.00
Left aileron adustment
Details
       

 01-29-2011
3.00
Left Aileron fitted
Details
       

 01-26-2011
2.00
Made aileron spacers and fitted hardware to ailero
Details
       

 01-26-2011
6.00
Fit Aileron to Right Wing
Details
       

 01-24-2011
2.00
Aileron/Flap trial fitting
Details
       

 01-23-2011
5.00
Finish Top Skins and Trial Fit Aileron/Flap
Details
       

 01-21-2011
1.50
Rivet Top Wing Skins
Details
       

 01-06-2011
1.00
Bottom skin overlap notch cutouts.
Details
       

 01-04-2011
2.00
Notching inboard upper and lower skins
Details
       

 12-30-2010
1.00
Test wiring job by using all components
Details
       

 12-29-2010
2.00
Finished Aileron Servo Wiring Connection
Details
       

 12-29-2010
2.00
Aileron Servo Wiring at Wing Tip End
Details
       

 11-17-2010
1.00
Wire Conduit change
Details
       

 11-15-2010
5.00
Finish Right Aileron Replacement
Details
       

 11-11-2010
3.00
Right Aileron Ready to Rivet
Details
       

 11-10-2010
2.00
Right Aileron New Prepped
Details
       

 11-09-2010
5.00
Right Aileron New
Details
       

 11-04-2010
5.00
Splitting Flap Hinges
Details
       

 11-03-2010
6.00
Left Flap Assembly
Details
       

 11-02-2010
0.00
Right Flap Assembly
Details
       

 11-02-2010
0.00
Right Control Surfaces completed
Details
       

 11-01-2010
6.00
Right Flap Assembly
Details
       

 11-01-2010
0.00
Right Flap Assembly
Details
       

 10-31-2010
3.00
Right Flap Assembly
Details
       

 10-31-2010
3.00
Left Aileron Completed
Details
       

 10-31-2010
0.00
Aileron Trim Photos
Details
       

 10-29-2010
4.00
Electric Aileron Trim Installation
Details
       

 10-28-2010
4.00
Finish match drilling. Cut access for Ellectric T
Details
       

 10-27-2010
4.00
Completed Right Aileron
Details
       

 10-20-2010
3.00
Build Aileron Skeletons and install stiffeners
Details
       

 10-19-2010
4.00
Aileron parts cleaned and primered
Details
       

 10-12-2010
3.00
Prime Flaps Prior to FINAL Assembly
Details
       

 10-06-2010
5.00
Sort out parts for two ailerons
Details

 10-01-2010
5.00
Left Flap
Details
       

 09-30-2010
6.00
Flap Preparation for Prime
Details
       

 09-28-2010
2.00
Replace Outer Rib in Right Wing
Details
       

 09-27-2010
4.00
Building the Right Flap
Details
       

 09-24-2010
6.00
Assemble Right Flap
Details
       

 09-17-2010
5.00
Install Leading Edge and Bell Cranks
Details
       

 09-11-2010
2.00
More rib installations
Details
       

 09-10-2010
2.00
Continuing Final Wing Assembly
Details
       

 09-07-2010
6.00
Continuing Final Wing Assembly
Details
       

 09-03-2010
6.00
Rivet wing ribs and spars
Details
       

 08-21-2010
3.00
Install 1st HID Duckwork Light
Details
       

 08-18-2010
3.00
Leading Edge Assembly
Details
       

 08-17-2010
1.00
Prime Wing Parts
Details
       

 08-11-2010
2.00
Prime Wing Ribs and Misc Parts
Details
       

 08-10-2010
3.00
Primed Wing Skins and parts
Details
       

 07-24-2010
6.00
enlarge holes, debur and dimple main spar
Details
       

 07-22-2010
6.00
Preparing Ribs for Priming
Details
       

 07-13-2010
4.00
Preparing and Dimpling remaining wing skins
Details
       

 07-10-2010
2.00
Removing Vinyl Protectant from skins
Details
       

 07-08-2010
4.00
Prepare Wing Skins for primer
Details
       

 06-28-2010
2.00
Re-tested the fuel tank
Details
       

 06-23-2010
0.50
Fuel Tank Leak Test
Details
       

 06-22-2010
2.00
Fuel Tank Access Cover and More Countersinking
Details
       

 06-20-2010
0.00
Fuel Tank Rear Baffle more
Details
       

 06-19-2010
6.00
Install Rear Fuel Tank Baffle
Details
       

 06-16-2010
1.00
Finished Installing Tank Nut Plates
Details
       

 06-11-2010
3.00
Drill-Countersink-Dimple for Fuel Tank Nut Plates
Details
       

 06-10-2010
1.00
Drilling Spar for Tank Nutplates
Details
       

 06-09-2010
1.00
Finished Tank Ribs
Details
       

 06-08-2010
2.00
Fuel Tank Root Rib Install
Details
       

 06-05-2010
2.00
Install Fuel Tank Rib 5 -2
Details
       

 05-26-2010
1.50
One more rib prosealed
Details
       

 05-21-2010
2.00
Prosealed one more rib
Details
       

 05-13-2010
3.00
Prepared Tank Rear Baffle and Skin
Details
       

 05-12-2010
1.00
Tried to use back rivet set...
Details
       

 05-12-2010
1.00
Install Fuel Tank Rib 5
Details
       

 05-11-2010
1.00
Fuel tank rib gets riveted and cleaned up
Details
       

 05-10-2010
1.00
Install outboard tank rib
Details
       

 05-06-2010
2.00
Attach and Proseal more attachment to Tank
Details
       

 04-29-2010
0.50
Fit Inboard Tank Rib Attachments
Details
       

 04-28-2010
2.00
Prepare Internal Tank Parts
Details
       

 04-25-2010
0.50
Riveted Fuel Tank Filler Ring
Details
       

 04-25-2010
0.50
Install Fuel Fill Ring
Details
       

 04-20-2010
1.00
Rivet and Seal Fuel Tank Drain
Details
       

 04-11-2010
1.00
Fuel Tank Stiffener Proseal 3
Details
       

 04-10-2010
1.00
Fuel Tank Stiffener Proseal 2
Details
       

 04-09-2010
4.00
Fuel Tank Stiffener Proseal
Details
       

 03-19-2010
6.00
Inventory Finish Kit and FWF Kit
Details
       

 02-02-2010
0.00
Whirlwind 200RV Composite Prop
Details
       

 11-05-2009
0.50
Dimpled and Countersank stiffeners
Details
       

 11-04-2009
3.00
Prepared tank skin for assembly
Details
       

 07-09-2009
1.00
Fit fuel tank access cover ring
Details
       

 07-08-2009
4.00
Fuel Tank Stiffeners
Details
       

 06-23-2009
3.00
Machinery breaks down now and then
Details
       

 06-22-2009
4.00
Make 28 Aileron Stiffeners
Details
       

 06-12-2009
3.00
Including Electric Trim in the build
Details
       

 06-11-2009
4.00
Starting the Ailerons
Details
       

 05-29-2009
5.00
Finish Mounting Fuel Tank
Details
       

 05-28-2009
4.00
Preparing the fuel tank
Details
       

 05-15-2009
1.00
Inboard Fuel Tank Rib
Details
     

 05-14-2009
1.00
Preparing the Fuel Tank Ribs
Details
       

 05-13-2009
1.50
Finish Drilling Bottom of Leading Edge
Details
       

 05-12-2009
1.00
Drill the ribs on the top side first
Details
       

 05-11-2009
2.00
Preparing to Mount Leading Edge
Details
       

 05-08-2009
1.00
Add mating strip to join leading edge and tank.
Details
       

 05-07-2009
2.00
Drilled and mounted Top Skins
Details
       

 05-07-2009
1.00
Back Drill through W425 Left and Right
Details
       

 05-05-2009
1.00
Leveled and secured leading edge ribs
Details
       

 05-04-2009
5.00
Mounted bottom wing skins and drilled all the hole
Details
       

 04-27-2009
6.00
Set all ribs in place for drilling
Details
       

 04-23-2009
1.00
Used a pattern to drill rather than match drilling
Details
       

 03-19-2009
0.10
Going to lose a month while we buy a 2nd home
Details
       

 03-14-2009
1.50
make attachments to Rib #9 for aileron bell crank
Details
       

 03-13-2009
2.00
Use skins to place rib locations correctly
Details
       

 03-12-2009
2.00
Marked center lines on all ribs
Details
     

 03-11-2009
2.50
Leading and Main Ribs get matched
Details
       

 03-10-2009
2.00
Use templates to drill #40 pilot holes
Details
       

 03-08-2009
3.00
Making Sure the Ribs are Flat
Details
       

 03-07-2009
2.00
Getting ribs ready to drill flanges
Details
       

 03-06-2009
5.00
I am bouncing around too much.
Details
       

 02-24-2009
2.50
Finding all the wing parts
Details

 02-19-2009
1.00
Left is Right and Right is Left. No Problem
Details
       

 02-18-2009
1.00
The Kits are complete. On to the real wing
Details
       

 02-18-2009
1.00
Making the tool box kit
Details
       

 02-17-2009
2.00
The Kit Control Surface
Details
       

 02-12-2009
0.00
Bending, cutting, creating.
Details
       

 02-11-2009
2.00
It gets easier after a few mistakes.
Details
       

 02-07-2009
3.00
Great kit to learn cause and effects.
Details
       

 01-06-2009
4.00
Prepared the engine for a year storage.
Details
       

 12-31-2008
2.00
Lycoming IO-360 B1E
Details
       

 10-13-2008
3.00
New Home for RV-6A
Details
       

 10-11-2008
0.00
Houston, We Have A Problem
Details
       

 10-10-2008
0.50
Thank you Mike Smith - Henderson NV RV-7A
Details
       

 01-01-2001
0.00
Test aileron trim wiring components and trim servo
Details

 01-01-2001
0.00
Example of riveting flap top skin to flap spar
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.