KitLog pro

Powered By Kitlog Pro v2.0

Wendells RV-6A
Work Logs Found: 70
Category Work Time: 184 Hours
 Date
Hours
Work Log Summary

Details

 03-12-2024
6.00
Prepare for Engine Start
Details
       

 01-02-2024
2.00
Update to latest Pressure Senders
Details
       

 11-28-2023
1.00
Re-test Starter Performance
Details
       

 10-31-2023
2.00
Test Starter Action
Details
       

 10-17-2023
2.00
Fix Boost Pump and Test Flows
Details
     

 10-11-2023
2.00
Getting ready for engine start
Details
       

 10-10-2023
2.00
Rigged Fuel Lines to measure fuel flow.
Details
       

 03-12-2014
0.00
Install Oil Cooler and Brace 2
Details
       

 03-12-2014
2.00
Install Oil Cooler and Brace
Details
       

 03-12-2014
2.00
Install Engine Baffles 20
Details
       

 03-12-2014
0.00
Install Engine Baffles 19
Details
       

 03-12-2014
6.00
Install Engine Baffles 18
Details
       

 03-10-2014
4.00
Firewall Forward Clamps Safety Wired
Details
       

 03-06-2014
3.50
Install Engine Baffles 17
Details
       

 03-03-2014
0.00
Install Engine Baffles 16
Details
       

 03-03-2014
8.00
Install Engine Baffles 15
Details
       

 02-02-2014
0.00
Install Engine Baffles 14
Details
       

 02-02-2014
3.00
Install Engine Baffles 13
Details
       

 02-02-2014
8.00
Install Engine Baffles 12
Details
       

 01-16-2014
2.00
Install Engine Baffles 11
Details
       

 01-15-2014
4.00
Install Engine Baffles 9
Details
       

 01-15-2014
3.00
Install Engine Baffles 10
Details
       

 12-05-2013
2.00
Reroute EGT/CHT wires 3
Details
       

 11-25-2013
0.00
Skytec XLT starter
Details
       

 11-18-2013
2.00
Reroute EGT/CHT wires 2
Details
       

 11-18-2013
2.00
Reroute EGT/CHT wires 1
Details
       

 11-18-2013
2.00
Install ASA oil separator 4
Details
       

 11-14-2013
3.00
Install Horizontal Air Intake Plenum 4
Details
       

 11-04-2013
2.00
Install Horizontal Air Intake Plenum 3
Details
       

 11-03-2013
5.00
Install Horizontal Air Intake Plenum 2
Details
       

 10-21-2013
4.00
Prepare PCU5000X Governor 2
Details
       

 10-19-2013
8.00
Install Engine Baffles 8
Details
       

 10-16-2013
4.00
Install Horizontal Air Intake Plenum
Details

 10-14-2013
4.00
Install Engine Baffles 7
Details
       

 09-27-2013
4.00
Install Engine Baffles 6
Details
       

 09-19-2013
2.00
Removed Governor Mounting Studs
Details
       

 09-18-2013
2.00
Prepare PCU5000X Governor
Details
       

 08-27-2013
0.50
Newest XLT Starter Install
Details
       

 05-22-2013
0.00
Install Engine Baffles 5
Details
       

 05-22-2013
0.00
Install Engine Baffles 4
Details
       

 05-22-2013
8.00
Install Engine Baffles 3
Details
       

 05-21-2013
0.00
Install Engine Baffles 2
Details
       

 05-21-2013
8.00
Install Engine Baffles 1
Details
       

 05-02-2013
3.00
EGT-CHT Sensors and Misc.
Details
       

 04-30-2013
2.00
Readjust Bendix connections for spacer.
Details
       

 04-24-2013
4.00
Sniffle Valve Installation
Details
       

 04-24-2013
1.00
Install drain line from fuel pump
Details
       

 04-23-2013
0.00
Vetterman Xover Exhaust Installation 3
Details
       

 04-23-2013
0.00
Vetterman Xover Exhaust Installation 2
Details
       

 04-23-2013
5.00
Vetterman Xover Exhaust Installation 1
Details
       

 04-08-2013
2.00
Install ASA oil separator 3
Details
       

 04-08-2013
3.00
Install ASA oil separator 2
Details
       

 04-08-2013
3.00
Install ASA oil separator 1
Details
       

 04-04-2013
1.00
Made new throttle bracket for Superior Sump
Details
       

 04-03-2013
3.00
Attach Mixture;Torque Mounting bolts
Details
       

 04-02-2013
0.00
Installed engine on firewall 3
Details
       

 04-02-2013
0.00
Installed engine on firewall 2
Details
       

 04-02-2013
3.00
Installed engine on firewall
Details
       

 03-28-2013
1.00
Received Oil Separator-Adel clamp fuel line.
Details
       

 03-28-2013
4.00
Oil return line from #4 cylinder
Details
       

 03-28-2013
2.00
Added fittings to mechanical fuel pump
Details
       

 03-15-2013
5.00
Update IO360B1E to IO360WLE
Details
       

 03-15-2013
2.00
Continue modifying engine
Details
       

 03-02-2013
1.00
Acquaint myself with Oil Cooler stuff
Details
       

 02-28-2013
2.00
Swapped out oil filter mount.
Details
       

 12-08-2012
2.00
Oil, Fuel, Maniford pressure fittings.
Details
       

 10-18-2012
3.00
Engine Mount Installed
Details
       

 03-13-2012
0.50
Remove Moisture from Dessicant
Details
       

 01-06-2009
4.00
Prepared the engine for a year storage.
Details
       

 12-31-2008
2.00
Lycoming IO-360 B1E
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.