Powered By Kitlog Pro v2.0
Wendells RV-6A
RV-6A
Firewall
Work Logs Found:
11
Category Work Time:
32 Hours
Date
Hours
Work Log Summary
Details
02-01-2024
1.00
Seal Wiring Passthrough Openings
Details
12-18-2013
4.00
Eliminate surplus harness wires.
Details
03-28-2013
1.00
Stainless Heater Box
Details
02-19-2013
2.00
Make Doubler for ANL Fuse Holders
Details
02-17-2013
2.00
Electrical passthrough
Details
02-14-2013
3.00
Installed the recessed firewall section
Details
02-14-2013
4.00
Electrical passthrough
Details
01-31-2013
5.00
Firewall Openings 3
Details
01-22-2013
3.00
Firewall Openings 2
Details
01-21-2013
3.00
Firewall Openings 1
Details
11-01-2012
4.00
Oil/Fuel pressure manifold to firewall
Details
SITE NAVIGATION
Contact Builder
RV-6A Home
Category
# Logs
# Hours
All
713
2352
Ailerons
22
72
Avionics
35
156
Canopy
62
187
Controls
23
78
Cowling
18
84
Electrical
38
161
Empennage
30
115
Engine
70
184
Firewall
11
32
Flaps
33
125
Fuselage
141
493
Gear
15
57
Miscellaneous
1
Move the Kit to FL
3
4
Panel
29
86
Prop
5
10
Smoke
7
14
Tools
2
3
Vans Training Kit
6
9
Videos
2
Wings
160
482
Copyright © 2001-2024 Matronics. All Rights Reserved.