KitLog pro

Powered By Kitlog Pro v2.0

Toms RV9-A project
' style=
Date:  7-28-2012
Number of Hours:  5.00
Manual Reference:  
Brief Description:  Drilled Canopy Hinge Blocks

Riveted the canopy seals to the frame.Riveted the two upper dimpled rivets on the canopy frame in preparation for drilling the hinge blocks. Drilled the Canopy Hinge blocks and bolted to the upper front deck.
' style=

Hinge Blocks Drilled

Hinge Blocks Drilled

' style=

Close up view

Close up view

' style=

Panel view

Panel view

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.