Toms RV9-A project
Work Logs Found: 615
Category Work Time: 1245 Hours
 Date
Hours
Work Log Summary

Details

 02-26-2019
0.00
JDair Latch Modification
     

 05-16-2018
0.00
Test posting
     

 01-31-2015
0.00
RV Finish Painting Pictures
Details
       

 01-30-2015
0.00
RV Painting Prep #3
       

 01-30-2015
0.00
RV Painting Prep #2
Details
       

 01-30-2015
0.00
RV Painting Prep #1
Details
       

 06-08-2014
2.00
Doylestown To Ocean City Trip
Details
     

 03-09-2014
2.10
X-Country and Pattern work weekend Hobbs 14.1
Details
       

 02-08-2014
0.00
RV in the Snow
Details
       

 02-01-2014
1.70
First Cross Country
Details
     

 01-19-2014
0.00
First Solo and Other Phase 1 Activities
Details

 01-13-2014
4.50
Fuel Tank Calibration & Flaps config
Details

 01-09-2014
1.00
Minor Airplane Upgrades
Details
     

 01-09-2014
1.50
Fixing Phase I Squawks
Details
       

 01-05-2014
2.50
Reinforced nosewheel fairing tow bar
Details
       

 01-04-2014
1.00
Finalized and laminated checklists
Details

 01-03-2014
0.00
Phase I testing - Planned Activities
Details

 01-01-2014
2.00
First Test Flight
Details
       

 12-28-2013
0.00
New Canopy Cover
Details
       

 12-28-2013
1.00
Minor Avionics Adjustments
Details

 12-26-2013
2.00
Reinstalled Wheel Pants and Fairings
Details

 12-21-2013
2.00
Resolved Bad Cylinder #2 Spark Plug
Details
       

 12-14-2013
1.00
Tinnerman washers for Empennage Fairing
Details
     

 12-14-2013
3.00
Adjusted Exhaust pipes for cowling clearance
Details
       

 12-07-2013
1.50
Skyview EMS Settings amd Compass
Details

 11-30-2013
5.00
DAR Inspection
Details
     

 11-29-2013
0.00
Remaining Punch list items
Details

 11-28-2013
0.00
Completed Weight and Balance - addl pics
       

 11-28-2013
4.00
Completed Weight and Balance
Details
       

 11-27-2013
4.00
Punch list items completed
Details

 11-27-2013
2.50
Fuel Flow Testing - Straight and Level
Details
       

 11-27-2013
0.50
Fuel Flow Testing - Climb configuration
Details
       

 11-26-2013
2.00
Picked up Racing Scales at Sky Manor

 11-25-2013
3.50
Wing Root Fairing Installation
Details
       

 11-25-2013
0.50
Secured Tail Strobe wiring bundle
Details
     

 11-25-2013
0.50
Secured Right Side EGT CHT Wiring
Details
     

 11-25-2013
0.00
Remaining Punch List
Details

 11-25-2013
0.25
Prop Tracking
Details
     

 11-25-2013
1.00
Installed Strobe wiring pass through
Details
       

 11-25-2013
1.00
Filled with 7 Quarts of Mineral Oil
Details

 11-24-2013
15.00
Installed Spark Plugs, Drained preservative oil
Details

 11-23-2013
6.00
Rigging Ailerons, Elevator and Flaps
Details

 11-09-2013
0.00
Remaining Punch List
Details

 11-08-2013
1.00
Installed Prop
Details
       

 11-03-2013
1.50
Installed rear wing support bolts
Details
     

 11-03-2013
2.00
Installed Elevator tips
Details
       

 11-03-2013
8.00
Finished Installing Wing Bolts
Details
       

 11-02-2013
0.50
Sftety tied gascolator
Details
     

 11-02-2013
2.50
Reinstalled EMS Skyview module and tested
Details

 11-02-2013
3.50
Installed Pitot Heat and tubing
Details

 11-01-2013
5.00
Installed tank attach brackets
Details
     

 11-01-2013
2.00
Drilled heat shield bolt through firewall
Details

 10-27-2013
6.00
Wing and Pitot Wiring
Details

 10-27-2013
0.00
95% done - final punch list before DAR Inspection
Details

 10-26-2013
4.00
Mounted Ailerons and Flaps and wing wiring
Details
       

 10-25-2013
2.50
Installed Wing Bolts
Details
     

 10-20-2013
3.00
Installed Elevator and Rudder
Details
     

 10-20-2013
3.50
Final Empennage Assembly
Details
       

 10-19-2013
4.00
Moving remaining hangar items
Details
       

 10-18-2013
0.00
Fuselage move to Airport - 3
       

 10-18-2013
0.00
Fuselage move to Airport - 2
       

 10-18-2013
1.50
Fuselage move to Airport - 1
Details
       

 10-13-2013
4.00
Installed Canopy Handle, Targa Strip finishing
Details
       

 10-12-2013
3.50
Started Targa Strip
Details
       

 10-12-2013
2.50
Sanding Windscreen
Details
       

 10-08-2013
1.50
Six layers of Fiberglass and peel ply
Details
       

 10-07-2013
2.00
Prep for Canopy Fiberglass layups
Details
       

 10-06-2013
2.00
Gluing Glareshield Vinyl
Details
     

 10-06-2013
1.00
Final Install Rear Plexiglass
Details
       

 10-06-2013
2.50
Epoxied Front Windscreen
Details
       

 10-05-2013
1.00
Touch up Canopy Frame
Details
       

 10-05-2013
2.50
Canopy Frame top coat painting
Details
       

 09-29-2013
2.00
Riveted Canopy Side Skirts
Details
       

 09-29-2013
1.50
Reinstalled Canopy and check clearance.
Details
       

 09-29-2013
3.00
Final Cut for Canopy
Details
       

 09-29-2013
2.00
Drilled and countersunk holes for the Canopy
Details
       

 09-23-2013
0.50
Installed Aileron Boot Flange
Details
       

 09-23-2013
1.50
Drilled Right Gear Leg Cotter Pin
Details
       

 09-22-2013
1.50
Pop-Riveted bottom cover plate
Details
     

 09-22-2013
1.50
Drilled Left Gear Leg Cotter Pin
Details
     

 09-20-2013
5.50
RV Transition Training Complete
Details

 09-16-2013
0.75
Front Skin 45% complete
Details
     

 09-15-2013
1.00
Started riveting front skin
Details

 09-15-2013
2.00
Moved items to the Airport
Details

 09-14-2013
1.50
Canopy Rough Cut and fit
Details
       

 09-08-2013
3.00
Move to Doylestown Airport
Details

 09-07-2013
1.50
resealed tank access plates
Details
       

 09-07-2013
2.00
Remoded old proseal from tank access plates
Details
       

 09-02-2013
0.50
Installed Engine Oil filler neck
Details
       

 09-02-2013
1.00
First Draft of POH
Details
     

 09-01-2013
0.50
Unpacked replacement canopy
Details
       

 09-01-2013
3.50
Installed cap strips
Details
       

 09-01-2013
2.00
Dimpled, marked and installed Top forward skin
Details
     

 08-31-2013
1.00
Tested Landing Lights and Fuel Sender wiring
Details

 08-31-2013
1.50
Added missing rivets to F-757-T
Details
       

 08-30-2013
1.50
Fuel Tank Sender Wiring
Details
     

 08-30-2013
5.00
Finished routing & bundling wiring
Details
       

 08-29-2013
3.50
Re-installed Avionics panels and riveted data plat
Details
       

 08-29-2013
3.00
Minor Setback Tank cover plates reversed
Details

 08-28-2013
3.50
Primed and Top Coated Avionics panels
Details
       

 08-28-2013
1.00
Fuel Pump Overflow Tubing
Details
       

 08-27-2013
3.00
Wingtip Reinforcement Angles
Details
       

 08-27-2013
0.50
Sealing Firewall Pass through
Details
       

 08-27-2013
0.50
Riveted Rudder Stops
Details
       

 08-27-2013
1.50
Installed Springs for Electric Aileron Trim
Details
       

 08-27-2013
0.50
Drilled and Tapped Co-Pilot set screw
Details
       

 08-26-2013
0.00
Future Home for N913WG at KDYL
Details
       

 08-26-2013
3.00
Finished Wingtip Lenses
Details
       

 08-25-2013
0.00
Remaining Punch list before moving to KDYL
Details

 08-25-2013
4.00
Fuselage final routing and bundling.
Details

 08-25-2013
0.50
Added Fast-on connectors for NAV lights
Details
     

 08-24-2013
3.00
Nav Strobe Wing wiring and termination
Details
       

 08-24-2013
1.00
Added VOR Pigtail Coax connector
Details
     

 08-24-2013
3.00
Added additional center section hole for wiring
Details
     

 08-18-2013
1.00
Wing spot priming completed
Details
       

 08-18-2013
2.00
Wing corrosion fix
Details
       

 08-18-2013
1.50
Installed Nav/Strobe in wingtips
Details
       

 08-18-2013
1.50
Drilled holes for Skyview OAT Probes
Details
       

 08-18-2013
1.00
Added Dual USB Charger Port
Details
     

 08-18-2013
1.00
"N" Number decal installation
Details
       

 08-17-2013
6.00
Wing Root Wiring
Details
       

 08-13-2013
0.00
RV Transition Training Scheduled
Details

 08-11-2013
3.00
Stick Grip Final Wiring
Details
       

 08-11-2013
1.00
Skyview Backup Battery Test
Details
       

 08-11-2013
0.50
Registered ELT at NOAA / SARSAT
Details

 08-10-2013
3.50
OAT Sensor Wiring
Details
       

 08-05-2013
3.00
Minor Setback with Fuel Tank cover plates
Details

 08-04-2013
0.50
Drilled holes for Nose Weel fairing tow bar
Details
       

 08-04-2013
1.50
Annunciator Warning Light
Details
     

 08-03-2013
2.00
Nose Wheel bearing bushings and final installation
Details
       

 07-25-2013
2.00
Reiff Oil sump heater installation
Details
       

 07-13-2013
0.00
Phase 1 Flight Area requested
Details
     

 07-07-2013
4.50
Cut and Installed Control Sticks
Details
       

 07-06-2013
2.00
Added Brake Fluid
Details
       

 07-05-2013
1.50
Secured aft baggage avionics wiring
Details

 07-04-2013
3.00
Engine cable support and cover plates
Details
       

 06-30-2013
0.00
Ordered Multiple-Point Temp labels
Details
     

 06-30-2013
3.50
Control Cable Installation
Details
       

 06-29-2013
2.50
Top Coated Avionics Panel Inserts
Details
     

 06-29-2013
1.50
NACA Vent and Screen Installation
Details
       

 06-24-2013
1.50
Primer Line Installation
Details
       

 06-23-2013
3.50
Oil Cooler Shutter Cable Installation
Details
       

 06-23-2013
0.00
Additinal Picture Oil Cooler Shutter Installation
Details
     

 06-22-2013
1.00
Safety Tie Carb and Alternator
Details
       

 06-22-2013
0.50
Blast Tubes for P-Mags
Details
       

 06-22-2013
0.50
Alternate Static Installation
Details
       

 06-22-2013
1.00
Alternate Air Push Pull Install
Details
       

 06-16-2013
3.50
Throttle Mixture and Carb Heat Controls
Details
       

 06-16-2013
2.50
Alternate Air Push-Pull Control
Details
       

 06-15-2013
2.00
Primer lines FWF
Details
     

 06-14-2013
0.00
Data Plate Engraving
Details
     

 06-14-2013
0.00
Custom Wheel Chocks
Details
     

 06-10-2013
0.00
Draft punch list for completion
Details

 06-09-2013
1.00
Wired Precision GPS input for Transponder 2020 man
Details
       

 06-09-2013
1.00
Tested Garmin GPS and Transponder
Details
       

 06-09-2013
0.00
RV outside shots for GPS testing
Details
       

 06-09-2013
1.00
Reconfigured VP-X Software
Details

 06-08-2013
0.50
Ordered Mineral Oil and Brake Fluid
Details

 06-08-2013
0.50
Drilled holes for Coax ELT Pass through
Details
       

 06-06-2013
0.50
Got Quote from Falcon Insurance
Details

 06-05-2013
0.50
FAA Registration & Data Plate engraving
Details

 06-02-2013
1.00
Fixed Com2 Tx issue
Details

 05-24-2013
1.00
Started Aircraft Registration process
Details

 05-19-2013
4.00
Completed Flap Switch and wiring harness
Details
       

 05-18-2013
1.00
Headset Testing
Details
       

 05-18-2013
4.00
Flaps & Position Sensor Installation
Details
       

 05-17-2013
1.00
Started Aircraft Registration process
Details

 05-17-2013
2.00
Headset Mounting & Wiring
Details
       

 05-12-2013
1.00
Tied in Serial 1 Transponder to both displays
Details

 05-12-2013
0.00
Headphone Jack Placement pictures
Details
       

 05-12-2013
3.00
Fabricated Headpone Jacks
Details
       

 05-05-2013
4.50
Transponder, ELT & Pitch Servo Wiring
Details
       

 04-28-2013
3.00
ADSB Wiring and Other minor items
Details

 04-21-2013
3.50
Avionics and trim wiring
Details

 04-14-2013
3.00
Ran wiring for Pitch trim servo and tail strobe
Details
       

 04-14-2013
3.00
Installed Electric Roll Trim Servo
Details
       

 04-11-2013
0.00
Replacement Canopy Arrives
Details
     

 04-07-2013
1.50
P-Mag Manifold pressure tubing
Details
     

 04-07-2013
2.50
Antenna Coax Runs
Details
       

 03-31-2013
4.00
Ran Pmag Wiring
Details
       

 03-30-2013
3.50
VPX Wiring 4
Details
       

 03-24-2013
4.50
VPX Wiring Part 3
Details
       

 03-24-2013
1.00
Mounting SkyView Net Hub
Details
       

 03-24-2013
2.00
Completed EGT - CHT Wiring
Details
       

 03-23-2013
2.00
Planning Coax runs and wiring details
Details

 03-17-2013
1.50
VPX Wiring Continued Part 2
Details
     

 03-15-2013
3.50
VP-X Wiring Continued
Details
     

 03-14-2013
2.50
Wiring harness for VPX Switches
Details
     

 03-13-2013
1.50
VP-X and Skyview Wiring
Details
       

 03-12-2013
1.50
Mounted Rear Avionics Harness and tested
Details
       

 03-11-2013
1.00
Ran main power cable to VP-X
Details
       

 03-10-2013
2.00
Started Wiring Engine Monitor
Details
       

 03-10-2013
1.50
Skyview ARINC Mounting
Details
     

 03-10-2013
1.50
Mounted Backup Alternator Volt Regulator
Details
       

 03-09-2013
1.50
Ran wiring and string through conduit
Details
       

 03-09-2013
2.00
Mounted Skyview Engine Monitor Module
Details
       

 03-09-2013
3.00
Installed VP-X Module
Details
       

 03-09-2013
2.00
Installed Skyview ADSB Unit
Details
     

 03-03-2013
3.50
Installed Garmin Skyview and Backup Batteries
Details
       

 03-02-2013
2.50
Installed center stack avionics
Details
       

 03-02-2013
4.00
Avionics Rail Mounts
Details
       

 02-24-2013
2.00
Drilled Canopy Latches
Details
       

 02-23-2013
3.00
Finishing Canopy Skirts and Cracked Canopy
Details
       

 02-21-2013
0.00
Right Side Canopy rail alignmentt (addl picures)
Details
       

 02-18-2013
0.00
Right Side Canopy Rail alignment gap
Details
       

 02-17-2013
1.50
Fixing the Canopy flat spot
Details
       

 02-17-2013
3.50
Drilled Left Side Canopy Skirt
Details
       

 02-16-2013
2.00
Part 2 - Installed Canopy Screws and Nuts and back
Details
       

 02-16-2013
3.00
Part 1 - Rear Canopy Countersink and Tap
Details
       

 02-10-2013
0.00
Part 4- Canopy Struts Opened and Closed
Details
       

 02-10-2013
3.50
Part 3 - Installing the Struts on the Canopy
Details
       

 02-10-2013
3.00
Part 2 - Tapping Canopy blocks and fabricating nut
Details
       

 02-10-2013
3.50
Part 1 - Fabricating Canopy Strut Mounts
Details
       

 02-05-2013
3.00
Installed top cowling pins and Nosewheel fairing
Details
       

 02-05-2013
3.50
Bottom Cowling Support and hinge pins
Details
       

 02-02-2013
3.00
VP-X Bench Test Configuraiton upload
Details
     

 01-26-2013
3.50
Installed left cowling pin and cowl epoxy
Details
       

 01-21-2013
8.00
Front Baffle Seal, Platenuts and RTV
Details
       

 01-13-2013
4.00
Fitting Top Cowling and Baffle
Details
       

 01-12-2013
3.50
Right Side baffle final riveting
Details
       

 01-04-2013
1.50
Front spinner nutplate installed and test fit
Details
       

 01-04-2013
3.50
Fabricating the Prop Filler Plates
Details
       

 01-03-2013
1.50
Installed Baffle Seal on bottom cowl inlet
Details
       

 01-03-2013
2.50
Fabricated Prop Spinner gap seal plates
Details
       

 01-01-2013
2.50
Threaded rod baffle keeper installation
Details
       

 01-01-2013
3.50
Left side baffle final riveting and top cowl clear
Details
       

 01-01-2013
1.00
Center baffle rough sizing
Details
     

 12-31-2012
3.50
Left Side Baffle progress
Details
       

 12-30-2012
3.50
Front Baffles started
Details
       

 11-25-2012
2.50
FAB Part 7 - Alternate Air Installation
Details
     

 11-25-2012
1.50
FAB Part 6 - Rubber Air Seal Installation
Details
       

 11-22-2012
1.50
FAB Part 5 - Reinforced Fiberglass FAB air inlet
Details
     

 11-21-2012
2.50
FAB Part 4 - Epoxied FAB air inlet
Details
       

 11-21-2012
3.50
FAB Part 2 - Fabricating the FAB
Details
       

 11-20-2012
3.50
FAB Part 3 - Carb heat door and alternate air
Details
       

 11-20-2012
2.00
FAB Part 1 - Lining up horizontal
Details
       

 11-12-2012
0.50
Top Cowling retainer pin bracket
Details
     

 11-11-2012
2.00
Riveted pin clips
Details
       

 11-09-2012
1.50
Nose Wheel Platenuts
Details
       

 11-08-2012
5.50
Nosewheel Fairings
Details
       

 11-05-2012
2.00
Nose Wheel wheel pants
Details
       

 11-05-2012
3.50
Nose Wheel Fairing
Details
       

 10-29-2012
0.00
Hurricane Sandy Damage Part 4
       

 10-29-2012
0.00
Hurricane Sandy Damage Part 3
       

 10-29-2012
0.00
Hurricane Sandy Damage Part 2
       

 10-29-2012
0.00
Hurricane Sandy Damage Part 1
Details
       

 10-27-2012
2.50
Second coat epoxy and final hinge riveting
Details
       

 10-26-2012
2.50
First coat epoxy acetone for lower cowling
Details
       

 10-26-2012
1.00
Cowling inlet finish epoxy coat
Details
     

 10-21-2012
0.50
Riveted Oil Access door
Details
       

 10-21-2012
1.50
Install Cowling Inlet Ducts
Details
     

 10-20-2012
2.50
Oil Door problem resolved
Details
       

 10-15-2012
0.00
Part 2 - Oil Door flush latch problem
Details
       

 10-15-2012
0.00
Part 1 - Oil Door flush latch problem
Details
       

 10-14-2012
1.50
Top Cowl sanding and second epoxy coat
Details
       

 10-14-2012
2.50
Riveted lower cowling top hinge
Details
       

 10-14-2012
3.50
Epoxy skim coat top cowling inside and out
Details
       

 10-13-2012
1.50
Riveted side and bottom fuselage hinge
Details
       

 10-07-2012
5.00
Drilled top and bottom cowling piano hinge
Details
       

 10-06-2012
2.00
Installed side cowling piano hinge
Details
       

 10-06-2012
1.00
Installed Eyeball fresh air vents
Details
       

 09-30-2012
0.00
Part 2 - Trial fit of lower cowling (Add'l picture
Details
       

 09-30-2012
1.50
Part 1 - Trial fit of lower cowling
Details
       

 09-23-2012
2.00
Part 4 - Set clearance for top Cowling
Details
       

 09-23-2012
0.50
Part 3 - Sanded and match drilled front cowling
Details
     

 09-23-2012
2.50
Part 2 - Installed Oil Door
Details
       

 09-23-2012
1.00
Marked avionics cut for intermediate bulkhead
Details

 09-21-2012
2.00
Sanded Front cowling for fit
Details
     

 09-21-2012
2.00
Part 1 - Test Fit canopy and made wood plate for s
Details
       

 09-16-2012
3.50
PArt 3 - Drilling Platenuts and mounting avionics
Details
       

 09-16-2012
3.50
Part 2 - Drilling and Riveting the back panel
Details
       

 09-16-2012
4.00
Part 1 - Fitting the carbon fiber panel
Details
       

 09-10-2012
1.00
Avionics Arrive
Details
       

 09-03-2012
4.50
Cut and drilled Rear Canopy
Details
       

 08-30-2012
0.00
Things to complete before moving to DYL
Details

 08-29-2012
2.00
Mounted Transponder and UAT blade antennas
Details
       

 08-28-2012
3.00
3 - Drilled Canopy Plexiglass to the Frame
Details
       

 08-28-2012
4.50
2 - Final Canopy cutting and clamp down
Details
       

 08-28-2012
0.50
1 - Moved ELT Antenna Mount and tapped screws
Details
       

 08-26-2012
0.00
Canopy Plexiglass final cut additional pictures
       

 08-26-2012
3.50
Cabin Plexiglass final cuts
Details
       

 08-25-2012
3.50
Canopy Brace and finish painting
Details
       

 08-22-2012
2.50
Drilled the canopy frame support brackets
Details
     

 08-21-2012
2.00
Splitting the Canopy plexiglass
Details
       

 08-19-2012
1.50
2 - Canopy Plexiglass Placement
Details
       

 08-19-2012
2.00
1 - First cut Canopy Plexiglass
Details
       

 08-18-2012
5.00
Riveted Canopy Frame
Details
       

 08-17-2012
0.00
Fuel Caps Engraved
Details
     

 08-16-2012
1.00
Canopy Frame Stiffener - Flanged lightening holes
Details
       

 08-15-2012
3.50
Canopy frame Primed and Riveted
Details
       

 08-12-2012
8.00
Drilling and Clecoing the Canopy fRame
Details
       

 08-11-2012
1.00
Picture of Canopy hinge gap (finally acceptable)
Details
     

 08-10-2012
1.50
Bastard canopy hinge pins take two
Details
       

 08-08-2012
1.50
Drilling Canopy Hinge Bolts
Details
       

 08-07-2012
0.00
Canopy splice plate additional pictures
Details
       

 08-07-2012
1.00
4 - Riveting canopy splice plate and hinge bracket
Details
       

 08-07-2012
3.50
3 - Drilling canopy splice block
Details
       

 08-07-2012
0.00
2 - Canopy ready for hinge drilling
Details
     

 08-07-2012
0.50
1 - Reinstalled canopy side handle parts
Details
       

 08-05-2012
1.00
Painted canopy latch side handle parts
Details
     

 08-05-2012
1.50
Mounted ELT Antenna
Details
       

 08-04-2012
2.50
Drilling Canopy Frame skins
Details
       

 08-02-2012
2.50
Canopy Latch Side Handle Install
Details
       

 07-28-2012
5.00
Drilled Canopy Hinge Blocks
Details
       

 07-26-2012
1.00
Painted Forward Upper Fuselage parts
Details
       

 07-25-2012
1.50
Upward Forward Fuselage deburring
Details
     

 07-23-2012
4.00
Cleocoed the Upper Forward Fuselage
Details
       

 07-22-2012
0.00
Installing the Canopy Release
Details

 07-22-2012
3.00
Final Install Canopy Deck
Details
       

 07-21-2012
1.50
Prepped Cockpit for Painting
Details
       

 07-21-2012
0.00
Drilling the Canopy Hinge Blocks to the Ribs
Details

 07-21-2012
2.00
Cockpit Painting Completed
Details
       

 07-20-2012
0.00
Installing the Front Deck (Tip-Up)
Details

 07-17-2012
1.50
Rear Baggage side panels and Canopy installation
Details
       

 07-15-2012
3.00
Riveted upper cabin fuselage skin
Details
     

 07-14-2012
8.00
Riveted canopy frame rear skin
Details
       

 07-14-2012
3.00
Riveted Canopy Frame
Details
       

 07-13-2012
1.50
Safety tied elevator servo
Details
     

 07-12-2012
2.50
Painting Canopy Frame parts
Details
       

 07-08-2012
3.50
Drilled Canopy Brace Bolts
Details
       

 07-04-2012
2.00
Oil cooler shutter final installation
Details
       

 07-03-2012
0.00
Finalized Paint Scheme Series #1
Details
       

 07-03-2012
0.00
Finalized Paint Scheme #2
       

 07-02-2012
2.00
Fabricated Oil Cooler shutter FW pass thru
Details
       

 07-01-2012
4.50
Riveted Baggage Floor Pans
Details
     

 06-30-2012
2.50
Installed Shoulder Harness Wear Blocks
Details
       

 06-28-2012
2.00
Installed upper gearleg intersection fairings
Details
       

 06-23-2012
4.00
Right Wheel Pants completed
Details
       

 06-23-2012
3.00
Left Wheelpant completed
Details
       

 06-03-2012
0.50
Switched out Adel G7 for G6 clamps for hoses
Details
     

 06-03-2012
4.00
Finished Left Wheel Pant
Details
       

 05-20-2012
2.00
Reworked Fuel Line
Details

 05-05-2012
3.50
Final Riveting Transponder and ELT mounts
Details
       

 04-22-2012
3.50
Transponder Mounting
Details
       

 04-21-2012
3.50
Glassing Right Wheel Pants
Details
     

 04-15-2012
4.50
Glassing Left Main Intersection Fairing
Details
       

 04-08-2012
2.50
Intersection Fairing - Left Wheel
Details
       

 04-01-2012
3.00
Gear Fairings alignment - Left Wheel
Details
       

 03-31-2012
3.00
Gear Fairings Install #1
Details
       

 03-24-2012
0.00
Wheel Pants Install Part #3
Details
       

 03-24-2012
4.00
Wheel Pants Install Part #2
Details
       

 03-11-2012
2.00
Wheel Pants Install part #1
Details
     

 03-11-2012
1.00
Bonaco Brake Line replacements
Details
       

 03-10-2012
1.50
Remade Fuel & Brake Line center Console spacers
Details
     

 03-10-2012
2.50
Install main gear leg brake lines
Details
       

 03-04-2012
3.50
Brake Line Installation
Details
       

 03-03-2012
1.50
Run Fuel Line right
Details
       

 03-03-2012
1.50
Fuel Line Left
Details
       

 02-26-2012
2.00
Pitot and AOS cockpit install
Details
       

 02-25-2012
3.00
Install Fuel Lines
Details
       

 02-19-2012
1.50
Secured Static line at rear bulkhead
Details
       

 02-19-2012
1.00
High Level Avionics Wire planning
Details
       

 02-18-2012
3.00
AOA, Pitot and Static lines , cabin painting
Details
       

 02-12-2012
1.50
Static Line routing
Details
       

 02-12-2012
1.50
RAMI Dual Com Antenna Installation
Details
       

 02-04-2012
1.00
Test Mounted ELT Bracket
Details
       

 02-04-2012
2.00
Rived Dynon ADHARS Bracket to Fuselage
Details
       

 02-04-2012
1.00
Install DB9 connector to Pitch Servo
Details
       

 01-29-2012
1.00
Finished Riveting Pitch Servo Bracket
Details
       

 01-29-2012
2.50
Fabricated ADHARS mount
Details
       

 01-28-2012
1.00
Prop Extension and spinner trial fit
Details
       

 01-28-2012
1.50
Pitch Servo Rough-in and review
Details
       

 01-28-2012
0.50
Game Plan for next few months
Details

 01-16-2012
4.50
Front Baffle Installation
Details
       

 01-15-2012
4.50
Passenger Side Baffle Installation
Details
       

 01-08-2012
3.50
Passenger Side Baffle prep
Details
     

 01-07-2012
0.50
Mainfold pressure tubing
Details
       

 01-07-2012
3.50
Baffle and Oil Filter Mounting
Details
       

 01-01-2012
1.50
Review and Analysis for MAP Sensor tubing
Details

 12-31-2011
0.00
Summary Build Accomplishments - 2011
Details

 12-31-2011
1.00
Finished Engine Breather
Details
       

 12-31-2011
3.50
Dynon MAP Sensor mounting and Alodyne Baffles
Details
       

 12-30-2011
1.00
Starter Cable Fabrication and Installation
Details
       

 12-29-2011
3.00
Oil Pressure line support and engine electric
Details
       

 12-27-2011
2.00
EGT Probe and Engine Baffle Install
Details
       

 12-22-2011
2.00
CHT Probe install, fuel and breather line support
Details
       

 12-18-2011
4.50
Red Cube and ATC Fuseholders install
Details
       

 11-12-2011
2.00
Forward Fuselage and Cockpit finish painting
Details
     

 11-05-2011
2.00
Finish Exhaust hangars & Torque carb bolts
Details
       

 10-29-2011
2.50
Vetterman Enhaust & Heat Muff installtion
Details
       

 10-29-2011
0.50
Gascolator Installation
Details
     

 10-23-2011
2.50
Reworked Engine attachment and installed cotter pi
Details

 10-06-2011
3.50
Mounting the Engine to the Fuselage
Details
       

 10-05-2011
2.00
Mounted Main gear
Details
       

 10-05-2011
0.00
Electric Primer mounting configuration
Details
     

 10-02-2011
2.00
Riveted Gascolater Stiffener
Details
       

 10-02-2011
1.00
Marked and Drilled FW Cable Penetrations
Details
     

 09-25-2011
5.00
Battery Contactor & Starter Relay FWF Install
Details
       

 09-24-2011
2.00
Installed Andair gascolator and stiffener
Details
       

 09-24-2011
2.00
Heat box install and FW recess sealing
Details
       

 09-18-2011
4.00
Install battery box and firewall recess
Details
       

 09-12-2011
2.00
Bolted landing gear weldments to fuselage
Details

 09-10-2011
2.00
Packing Main Wheel Bearings
Details
       

 09-10-2011
1.50
Packing Front Wheel Bearings
Details
       

 09-10-2011
3.00
Mounted Main Wheels
Details
       

 09-02-2011
3.50
Drilled engine to fuselage bolt holes
Details
       

 09-01-2011
0.00
Lycoming O320 Arrives
Details
       

 08-20-2011
1.50
Wings Completed !
Details

 08-17-2011
1.50
Right Wing root fairing nutplates
Details
       

 08-16-2011
2.00
Right Wing Flap pushrod clearance hole
Details
       

 08-13-2011
2.00
Flaprod Clearance Hole & rear spar bolt clearance
Details
       

 08-13-2011
4.00
Finished left Wing root fairing Nutplates
Details
       

 08-08-2011
1.50
Drill Left Wing Root Fairing Continued
Details
       

 08-04-2011
1.50
Drilled Left Wing root fairing
Details
       

 08-03-2011
2.50
Drilling Wing Spar bolts
Details
       

 07-24-2011
2.00
Setting Wing Incidence, Part 1
Details
       

 07-23-2011
3.50
Rework Right WingTip nutplates
Details

 07-09-2011
3.00
Right Access platenuts and wing fairing
Details
       

 07-05-2011
5.00
Riveted right wing bottom skin
Details
     

 07-04-2011
1.50
Misc Right Wing items
Details
     

 06-17-2011
3.00
Right bottom wing skin prep
Details
       

 06-14-2011
1.50
Right Wing Aileron pushrod clearance
Details
       

 06-13-2011
0.00
Ordered Lycoming O320-D2A from AeroSport Power
Details

 06-12-2011
1.00
Prime wing access plates
Details
     

 06-11-2011
0.00
Wingtip final assembly add'l pictures
Details
       

 06-11-2011
5.00
Left Wingtip platenut and final assembly
Details
       

 06-05-2011
3.00
Left Wingtip initial installation
Details
       

 05-30-2011
2.00
Panel Planning V 2.0
Details
     

 05-30-2011
3.00
Left bottom Wing skin 70% done
Details
       

 05-29-2011
2.50
Left Wing bottom skin prep
Details
       

 05-22-2011
1.50
Left Wing Skin Prep
Details
     

 05-22-2011
1.50
Left Wing Pitot fitings install
Details
       

 05-22-2011
1.50
First Cut Panel Layout
Details
       

 05-17-2011
1.00
Left Wing Pitot Heat Wiring
Details
       

 05-16-2011
2.50
Left Wingtip Lens install
Details
       

 05-11-2011
1.00
Dynon Roll Servo install Right Wing
Details
       

 05-09-2011
1.00
Pitot mount to mast
Details
       

 05-07-2011
1.50
VOR Coax runs for Right Wing
Details
       

 05-07-2011
2.50
Pitot mounting
Details
       

 05-07-2011
1.00
Installed left wing access plate nutplates
Details
       

 05-01-2011
4.50
Right Wing Aileron and Flap Alignment
Details
       

 04-12-2011
2.00
Pitot Location Decision and IFR provisions
Details
     

 04-10-2011
3.00
Left Wing Aleron Attachment
Details
       

 04-10-2011
2.00
Aileron stop install and pushrod clearance (Left)
Details
       

 04-05-2011
1.00
Fuel tank leak check
Details

 04-03-2011
1.50
Leak test right fuel tank
Details
       

 04-03-2011
1.00
Finished Prosealing vent screens, sealed left tank
Details
     

 04-02-2011
1.50
Prosealed vent screen and right tank
Details
       

 04-02-2011
1.50
Finish Duckworks lighting
Details
       

 03-27-2011
2.00
Finished plexiglass cover
Details
       

 03-27-2011
3.50
Assembled landing light bracket and outlined cover
Details
       

 03-26-2011
3.50
Duckworks Landing Light Cutout
Details
       

 03-20-2011
4.50
Installed Aileron gap seal left wing
Details
       

 03-19-2011
3.50
Aileron Bracket Installation
Details
       

 03-19-2011
0.00
Additional pictures wing aileron brackets
Details
       

 03-13-2011
2.50
Primed Aileron and Flap Gap Seals
Details

 03-06-2011
2.00
Proseal Tank Access plate hardware
Details
       

 02-27-2011
2.50
Builder Mod Cabin frame support cover
Details
       

 02-20-2011
3.50
Right Bellcrank and Fuel Pickup and sender assy
Details
       

 02-20-2011
1.00
QB Wing assembly planning
Details

 02-20-2011
0.00
Fuel Access plate CAD pictures
Details
       

 02-20-2011
0.00
Construction log analysis, more worktime needed
Details
     

 02-19-2011
4.50
Left Wing Conduit and Bellcrank Install
Details
       

 02-13-2011
3.00
Right Wing Conduit Run
Details
       

 01-30-2011
0.00
Drilling the Canopy Bolts (Right Side)
Details
       

 01-30-2011
2.00
Drilling Canopy Attach Bolts (Left side)
Details
       

 01-29-2011
5.00
Trimming and priming for Canopy Attach bolt
Details
       

 01-17-2011
2.00
Completed riveting cabin frame
Details
       

 01-08-2011
3.50
Riveted Forward Section of the Cabin Frame
Details
       

 01-03-2011
1.00
Canopy Frame priming
Details
       

 01-03-2011
3.00
Canopy Frame countersinking
Details
       

 12-31-2010
0.00
Summary Build Accomplishments - 2010
Details

 12-30-2010
1.50
Installed fuel vent line passenger side
Details
       

 12-30-2010
1.00
Drilled out broken tap on longeron
Details
       

 12-29-2010
4.00
Installed Fuel vent tubing pilot side
Details
       

 12-29-2010
0.00
Add'l pictures Fuel vent tubing
Details
       

 12-26-2010
2.00
Canopy Frame mechanical countersinking - Day 3
Details
       

 12-22-2010
3.50
Drilling Canopy Frame forward holes
Details

 12-19-2010
3.50
Cabin Frame Assembly Day 2
Details
       

 12-18-2010
3.50
Cabin Frame Assembly Day 1
Details
       

 12-17-2010
0.00
Catto Prop Arrives !
       

 12-17-2010
0.00
Catto Prop Arrives !
Details
       

 12-12-2010
1.00
Riveting Rudder cable exit fairings
Details
       

 12-12-2010
1.50
Priming Parts
Details
       

 12-05-2010
4.00
Rivet Rear Fuselage skins
Details
       

 11-28-2010
3.50
Pop Rivet vertical and horizontal stabilizer fairi
Details
       

 11-28-2010
0.00
Additional pictures
Details
       

 11-27-2010
3.50
Elevator Balancing and wing part prep
Details
       

 11-23-2010
1.50
ProSeal NACA Fresh air ducts
Details
       

 11-23-2010
1.50
Final Epoxy Coat for Empennage Fairing
Details
       

 11-23-2010
0.00
Expoxied Faring add'l pictures
Details
       

 11-23-2010
1.00
Epoxied Fairing
Details
       

 11-22-2010
1.50
Lower Empennage fairing holes fore and aft
Details
       

 11-22-2010
2.00
Install forward empennage fairing plate nuts
Details
       

 11-21-2010
3.50
Finish cutting Fuselage Fairing
Details
       

 11-20-2010
3.50
Install Nut Plates for Empennage Fairing
Details
       

 11-16-2010
0.00
Cockpit parts painted #2
       

 11-16-2010
0.00
Cockpit parts painted #1
Details
       

 11-14-2010
2.00
Empennage Fairing trial fit
Details
       

 11-13-2010
2.00
Platenut install for Rudder Fairing
Details
       

 11-08-2010
1.50
FInish sanding and drilling bottom rudder fairing
Details
       

 11-07-2010
2.00
Primed parts and Finished Aileron Pushrod
Details
       

 11-07-2010
2.50
Fabricated and Installed Rudder Stops
Details
       

 10-31-2010
3.00
Rudder Cable Exit Fairings
Details
       

 10-31-2010
3.50
Electric Elevator Trim
Details
       

 10-31-2010
1.50
Bottom Rudder Fairing test fit
Details
     

 10-30-2010
3.50
Rudder Cables
Details
       

 10-24-2010
1.00
Reamed Gear Leg holes
Details
     

 10-23-2010
1.00
Lower elevator horn hole (continued)
Details
       

 10-23-2010
2.50
Lower elevator horn hole
Details
       

 10-23-2010
0.50
Elevator push pull tube allignment
Details
       

 10-23-2010
1.50
Adjusted Elevator up / down stops
Details
       

 10-10-2010
2.00
Passenger side Crotch Strap assembly
Details
       

 10-10-2010
1.00
Elevator Push Pull tube blind rivets
Details
       

 10-03-2010
0.50
Crotch strap with seats installed
Details
       

 10-02-2010
2.00
Finish Crotch strap assembly (pilot side)
Details
       

 09-26-2010
2.00
Primed Push Pull Tubes
Details
       

 09-19-2010
3.00
Crotch Strap assembly
Details
       

 09-18-2010
1.50
Moved Rudder pedal assembly aft
Details
     

 09-18-2010
1.00
Adjusted control stick clearance
Details
       

 09-10-2010
0.50
Test Fit Interior seating
Details
       

 09-10-2010
0.00
Leather fitting
       

 08-01-2010
2.50
Epoxy finishing empennage tips
Details
       

 07-27-2010
2.00
Vertical Stabilizer Fiberglass tips
Details
       

 07-26-2010
2.00
Horizontal Stabilizer Fiberglass tip (right)
Details
       

 07-25-2010
2.50
Horizontal Stabilizer Fiberglass tips (left)
Details
       

 07-21-2010
1.50
Empennage Tips
Details
       

 07-20-2010
2.00
Tail Tie down bar and Rudder attach
Details
       

 07-18-2010
2.00
Horitontal Stabilizer front spar attach
Details
       

 07-17-2010
2.50
Elevator Horn Bolts
Details
       

 07-12-2010
0.00
Horizontal attach bolts underside edge clearance
Details
       

 07-11-2010
0.50
Horizontal Stabilizer Empennage Attach #1
Details
       

 07-11-2010
5.50
Horizontal Stabilizer Attach #2
Details
       

 07-10-2010
0.50
Install Elevator counterweights
Details
       

 07-10-2010
2.50
Horizontal Stabilizer fairing
Details
       

 07-09-2010
2.00
Elevator rod end bearings install
Details
       

 07-05-2010
1.50
SafeAir Pitot Static fuselage install
Details
       

 07-05-2010
1.00
Horizontal Stabilizer trial fit
Details
       

 06-13-2010
2.50
Electric Flap Assembly - 2
Details
       

 06-06-2010
3.00
Electric Flap assembly -1
Details
       

 06-05-2010
0.50
Testing cover plates with screws
Details
       

 06-05-2010
1.00
Riveted Heat baffle
Details
       

 06-05-2010
1.50
Mounting the Andiar Fuel Valve & Priming parts
Details
       

 06-05-2010
2.00
Finishing the Forward Fuselage Cover
Details
       

 06-05-2010
0.50
Drilled nutplates on firewall recesss
Details
       

 05-31-2010
3.00
Fitting the Forward Top Skins
Details
       

 05-31-2010
2.00
Fitting the Forward Top Skin - Continued
Details
       

 05-30-2010
1.00
Priming parts
Details
     

 05-30-2010
2.50
Elevator Bellcrank Assembly
Details
       

 05-29-2010
1.50
Ordered Oregon Aero Seats package
Details

 05-22-2010
2.50
Received Finishing Kit, Inventoried parts
Details

 05-16-2010
1.00
Rudder Pedals Finish Painting
Details
       

 05-15-2010
2.00
Drilling Landing Gear (Con't)
Details
       

 05-15-2010
4.00
Drilling Landing Gear
Details
       

 05-08-2010
1.00
Mounted Brake fluid resorvior
Details
       

 05-08-2010
2.50
Made spray bench and primed parts
Details
       

 05-08-2010
4.00
Drilled Brake Pedal piston holes & final assembly
Details
       

 05-02-2010
1.50
Cleaned & Primed Rudder Pedals
Details
     

 05-01-2010
4.00
Fabricated Rudder Pedals
Details
       

 04-25-2010
3.00
Rudder Pedals bearing assembly
Details
       

 04-24-2010
3.00
Test Fit rudder pedal assembly and deburred parts
Details
       

 04-24-2010
2.50
Fuselage forward test fitting
Details
       

 04-23-2010
1.00
Right side seat riveted
Details
       

 04-18-2010
2.00
Riveted Left Seat
Details
       

 04-18-2010
3.00
Drilled Steat backs
Details
       

 04-17-2010
2.00
Final Assembly Right Side Step
Details
       

 04-10-2010
2.50
Finish installing left side step
Details
       

 04-01-2010
2.00
Final fitting left side fuselage step
Details
       

 03-28-2010
1.50
Rough cut install of Fuselage Steps
Details
       

 03-28-2010
2.50
Removed Baggage floor and side skins
Details
       

 03-24-2010
1.50
Tunnel Cover & Flap Bracket
Details
       

 03-21-2010
4.50
Seat Adjustment Supports
Details
       

 03-21-2010
1.50
Enlarging Ribs for Control Stick Fitting
Details
       

 03-21-2010
1.00
Completed Control stick installation
Details
       

 03-21-2010
1.00
Added spacing washers to Control stick assmb
Details
       

 03-20-2010
1.50
Fuel Pump Doubler Prime and Rivet
Details
       

 03-20-2010
2.50
Fuel Pump Doubler Fabrication
Details
       

 03-14-2010
2.00
Tunnel Cover (F-741B)
Details
       

 03-14-2010
2.00
Drilling lightening holes for seatback support
Details
       

 03-13-2010
3.00
Control Stick Assembly
Details
       

 03-12-2010
1.50
Firewall Recess Drill & Dimple
Details
     

 03-08-2010
0.00
Potential Paint Schemes Page 2
Details
       

 03-08-2010
0.00
Poitential Paint Schemes Page 1
Details
       

 03-08-2010
0.00
Interior Seat Layout pictures
Details
       

 03-06-2010
0.50
Tap Tie-Down Bar (W-933)
Details
       

 03-06-2010
4.50
Parts Inventory and Storage
Details
     

 03-06-2010
2.00
Drill, Prime and Rivet brake line bracket (F-6122)
Details
       

 02-28-2010
0.00
QB Fuselage Quality Pictures #2
       

 02-28-2010
0.00
QB Fuselage Quality Pictures #1
       

 02-27-2010
4.00
Fabricate Seat Back Assembly & Tie down bar
Details
       

 02-20-2010
2.00
QB Fuselage and Wing Inventory
Details

 02-20-2010
2.00
Inventoried Parts Fabrication
Details

 02-17-2010
1.00
QB Fuselage & Wings Delivery
Details
       

 01-24-2010
5.00
EAA Modified Workbench
Details
       

 12-31-2009
0.00
Summary Build Accomplishments - 2009
Details

 11-17-2009
1.50
Wing Cradle
Details
       

 10-31-2009
6.00
Garage heater Gas line install
Details
       

 10-31-2009
0.00
Fellow Builder RV-9 At KDYL - Firewall Forward
Details
       

 10-31-2009
0.00
Fellow Builder RV-9 At KDYL - Avionics
Details
       

 10-18-2009
4.00
Garage Heater vent install
Details
       

 10-17-2009
4.00
Garage Heater unit ceiling installation
Details
       

 09-05-2009
0.00
Shop Tools
Details
       

 09-05-2009
0.00
Shop Tools
Details
       

 09-05-2009
0.00
Shop Tools
Details
       

 08-28-2009
0.10
Photo or Wally and Phil from Synergy Air
Details
     

 08-27-2009
1.00
rveting horizontal stabilizer spar
Details
     

 08-27-2009
2.00
riveting horizontal stabilizer skins
Details
       

 08-27-2009
1.00
riveting horizontal stabilizer frame ribs and spar
Details
     

 08-27-2009
1.00
pop riveting rudder leading edge
Details
     

 08-27-2009
2.00
flush riveting horizontal stabilizer leading edge
Details
       

 08-27-2009
2.00
cleaning up trailing edges before riveting
Details
     

 08-26-2009
2.00
riveting vertical stabilzer skin to frame
       

 08-26-2009
2.00
Glue elevator trailing edges
Details
       

 08-26-2009
1.00
fabricate horizontal stabilizer attach points
Details
     

 08-26-2009
1.00
countersinking rudder trailing edge
Details
     

 08-26-2009
1.00
assembling vertical stabilizer frame
Details
     

 08-25-2009
3.00
riveting skins to left elevator
Details
       

 08-25-2009
4.00
fitting skins to right elevator
Details
       

 08-25-2009
1.00
assemble left elevator frame
Details
       

 08-24-2009
2.00
Rivet Horizontal Stabilizer frame
Details
       

 08-24-2009
4.00
flush rivet horizontal stabilizer skins
Details
       

 08-24-2009
2.00
Building the Horizontal Stabilizer Frame
Details
       

 08-22-2009
8.00
Rudder Skeleton
Details
       

 08-02-2009
0.00
Aircraft Selection
Details
       

 08-01-2009
0.00
Getting into Aviation
Details
       