KitLog pro

Powered By Kitlog Pro v2.0

Toms RV9-A project
Work Logs Found: 38
Category Work Time: 88 Hours
 Date
Hours
Work Log Summary

Details

 02-05-2013
3.00
Installed top cowling pins and Nosewheel fairing
Details
       

 02-05-2013
3.50
Bottom Cowling Support and hinge pins
Details
       

 01-26-2013
3.50
Installed left cowling pin and cowl epoxy
Details
       

 01-21-2013
8.00
Front Baffle Seal, Platenuts and RTV
Details
       

 01-13-2013
4.00
Fitting Top Cowling and Baffle
Details
       

 01-12-2013
3.50
Right Side baffle final riveting
Details
       

 01-04-2013
1.50
Front spinner nutplate installed and test fit
Details
       

 01-04-2013
3.50
Fabricating the Prop Filler Plates
Details
       

 01-03-2013
1.50
Installed Baffle Seal on bottom cowl inlet
Details
       

 01-03-2013
2.50
Fabricated Prop Spinner gap seal plates
Details
       

 01-01-2013
2.50
Threaded rod baffle keeper installation
Details
       

 01-01-2013
3.50
Left side baffle final riveting and top cowl clear
Details
       

 01-01-2013
1.00
Center baffle rough sizing
Details
     

 12-31-2012
3.50
Left Side Baffle progress
Details
       

 12-30-2012
3.50
Front Baffles started
Details
       

 11-12-2012
0.50
Top Cowling retainer pin bracket
Details
     

 11-11-2012
2.00
Riveted pin clips
Details
       

 10-27-2012
2.50
Second coat epoxy and final hinge riveting
Details
       

 10-26-2012
2.50
First coat epoxy acetone for lower cowling
Details
       

 10-26-2012
1.00
Cowling inlet finish epoxy coat
Details
     

 10-21-2012
0.50
Riveted Oil Access door
Details
       

 10-21-2012
1.50
Install Cowling Inlet Ducts
Details
     

 10-20-2012
2.50
Oil Door problem resolved
Details
       

 10-15-2012
0.00
Part 2 - Oil Door flush latch problem
Details
       

 10-15-2012
0.00
Part 1 - Oil Door flush latch problem
Details
       

 10-14-2012
1.50
Top Cowl sanding and second epoxy coat
Details
       

 10-14-2012
2.50
Riveted lower cowling top hinge
Details
       

 10-14-2012
3.50
Epoxy skim coat top cowling inside and out
Details
       

 10-13-2012
1.50
Riveted side and bottom fuselage hinge
Details
       

 10-07-2012
5.00
Drilled top and bottom cowling piano hinge
Details
       

 10-06-2012
2.00
Installed side cowling piano hinge
Details
       

 09-30-2012
0.00
Part 2 - Trial fit of lower cowling (Add'l picture
Details
       

 09-30-2012
1.50
Part 1 - Trial fit of lower cowling
Details
       

 09-23-2012
2.00
Part 4 - Set clearance for top Cowling
Details
       

 09-23-2012
0.50
Part 3 - Sanded and match drilled front cowling
Details
     

 09-23-2012
2.50
Part 2 - Installed Oil Door
Details
       

 09-21-2012
2.00
Sanded Front cowling for fit
Details
     

 09-21-2012
2.00
Part 1 - Test Fit canopy and made wood plate for s
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.