Toms RV9-A project
Work Logs Found: 121
Category Work Time: 238 Hours
 Date
Hours
Work Log Summary

Details

 12-26-2013
2.00
Reinstalled Wheel Pants and Fairings
Details

 11-28-2013
0.00
Completed Weight and Balance - addl pics
       

 11-28-2013
4.00
Completed Weight and Balance
Details
       

 11-27-2013
4.00
Punch list items completed
Details

 11-23-2013
6.00
Rigging Ailerons, Elevator and Flaps
Details

 10-06-2013
1.00
Final Install Rear Plexiglass
Details
       

 09-23-2013
0.50
Installed Aileron Boot Flange
Details
       

 09-22-2013
1.50
Pop-Riveted bottom cover plate
Details
     

 09-16-2013
0.75
Front Skin 45% complete
Details
     

 09-15-2013
1.00
Started riveting front skin
Details

 09-01-2013
3.50
Installed cap strips
Details
       

 09-01-2013
2.00
Dimpled, marked and installed Top forward skin
Details
     

 08-31-2013
1.50
Added missing rivets to F-757-T
Details
       

 08-30-2013
1.50
Fuel Tank Sender Wiring
Details
     

 08-27-2013
0.50
Riveted Rudder Stops
Details
       

 08-27-2013
1.50
Installed Springs for Electric Aileron Trim
Details
       

 08-27-2013
0.50
Drilled and Tapped Co-Pilot set screw
Details
       

 08-24-2013
3.00
Added additional center section hole for wiring
Details
     

 08-18-2013
1.00
Added Dual USB Charger Port
Details
     

 07-07-2013
4.50
Cut and Installed Control Sticks
Details
       

 07-06-2013
2.00
Added Brake Fluid
Details
       

 08-05-2012
1.50
Mounted ELT Antenna
Details
       

 07-21-2012
1.50
Prepped Cockpit for Painting
Details
       

 07-21-2012
2.00
Cockpit Painting Completed
Details
       

 07-13-2012
1.50
Safety tied elevator servo
Details
     

 07-02-2012
2.00
Fabricated Oil Cooler shutter FW pass thru
Details
       

 06-03-2012
0.50
Switched out Adel G7 for G6 clamps for hoses
Details
     

 03-04-2012
3.50
Brake Line Installation
Details
       

 02-19-2012
1.50
Secured Static line at rear bulkhead
Details
       

 02-18-2012
3.00
AOA, Pitot and Static lines , cabin painting
Details
       

 02-12-2012
1.50
Static Line routing
Details
       

 02-27-2011
2.50
Builder Mod Cabin frame support cover
Details
       

 01-30-2011
0.00
Drilling the Canopy Bolts (Right Side)
Details
       

 01-30-2011
2.00
Drilling Canopy Attach Bolts (Left side)
Details
       

 01-29-2011
5.00
Trimming and priming for Canopy Attach bolt
Details
       

 01-17-2011
2.00
Completed riveting cabin frame
Details
       

 01-08-2011
3.50
Riveted Forward Section of the Cabin Frame
Details
       

 01-03-2011
1.00
Canopy Frame priming
Details
       

 01-03-2011
3.00
Canopy Frame countersinking
Details
       

 12-30-2010
1.50
Installed fuel vent line passenger side
Details
       

 12-30-2010
1.00
Drilled out broken tap on longeron
Details
       

 12-29-2010
4.00
Installed Fuel vent tubing pilot side
Details
       

 12-29-2010
0.00
Add'l pictures Fuel vent tubing
Details
       

 12-26-2010
2.00
Canopy Frame mechanical countersinking - Day 3
Details
       

 12-22-2010
3.50
Drilling Canopy Frame forward holes
Details

 12-19-2010
3.50
Cabin Frame Assembly Day 2
Details
       

 12-18-2010
3.50
Cabin Frame Assembly Day 1
Details
       

 12-12-2010
1.00
Riveting Rudder cable exit fairings
Details
       

 12-12-2010
1.50
Priming Parts
Details
       

 12-05-2010
4.00
Rivet Rear Fuselage skins
Details
       

 11-23-2010
1.50
ProSeal NACA Fresh air ducts
Details
       

 11-16-2010
0.00
Cockpit parts painted #2
       

 11-16-2010
0.00
Cockpit parts painted #1
Details
       

 10-31-2010
3.00
Rudder Cable Exit Fairings
Details
       

 10-31-2010
3.50
Electric Elevator Trim
Details
       

 10-31-2010
1.50
Bottom Rudder Fairing test fit
Details
     

 10-30-2010
3.50
Rudder Cables
Details
       

 10-24-2010
1.00
Reamed Gear Leg holes
Details
     

 10-23-2010
1.00
Lower elevator horn hole (continued)
Details
       

 10-23-2010
2.50
Lower elevator horn hole
Details
       

 10-23-2010
0.50
Elevator push pull tube allignment
Details
       

 10-23-2010
1.50
Adjusted Elevator up / down stops
Details
       

 10-10-2010
2.00
Passenger side Crotch Strap assembly
Details
       

 10-10-2010
1.00
Elevator Push Pull tube blind rivets
Details
       

 10-03-2010
0.50
Crotch strap with seats installed
Details
       

 10-02-2010
2.00
Finish Crotch strap assembly (pilot side)
Details
       

 09-26-2010
2.00
Primed Push Pull Tubes
Details
       

 09-19-2010
3.00
Crotch Strap assembly
Details
       

 09-18-2010
1.50
Moved Rudder pedal assembly aft
Details
     

 09-18-2010
1.00
Adjusted control stick clearance
Details
       

 09-10-2010
0.50
Test Fit Interior seating
Details
       

 09-10-2010
0.00
Leather fitting
       

 07-05-2010
1.50
SafeAir Pitot Static fuselage install
Details
       

 06-13-2010
2.50
Electric Flap Assembly - 2
Details
       

 06-06-2010
3.00
Electric Flap assembly -1
Details
       

 06-05-2010
1.00
Riveted Heat baffle
Details
       

 06-05-2010
1.50
Mounting the Andiar Fuel Valve & Priming parts
Details
       

 06-05-2010
2.00
Finishing the Forward Fuselage Cover
Details
       

 06-05-2010
0.50
Drilled nutplates on firewall recesss
Details
       

 05-31-2010
3.00
Fitting the Forward Top Skins
Details
       

 05-31-2010
2.00
Fitting the Forward Top Skin - Continued
Details
       

 05-30-2010
1.00
Priming parts
Details
     

 05-30-2010
2.50
Elevator Bellcrank Assembly
Details
       

 05-29-2010
1.50
Ordered Oregon Aero Seats package
Details

 05-16-2010
1.00
Rudder Pedals Finish Painting
Details
       

 05-15-2010
2.00
Drilling Landing Gear (Con't)
Details
       

 05-15-2010
4.00
Drilling Landing Gear
Details
       

 05-08-2010
1.00
Mounted Brake fluid resorvior
Details
       

 05-08-2010
4.00
Drilled Brake Pedal piston holes & final assembly
Details
       

 05-02-2010
1.50
Cleaned & Primed Rudder Pedals
Details
     

 05-01-2010
4.00
Fabricated Rudder Pedals
Details
       

 04-25-2010
3.00
Rudder Pedals bearing assembly
Details
       

 04-24-2010
3.00
Test Fit rudder pedal assembly and deburred parts
Details
       

 04-23-2010
1.00
Right side seat riveted
Details
       

 04-18-2010
2.00
Riveted Left Seat
Details
       

 04-18-2010
3.00
Drilled Steat backs
Details
       

 04-17-2010
2.00
Final Assembly Right Side Step
Details
       

 04-10-2010
2.50
Finish installing left side step
Details
       

 04-01-2010
2.00
Final fitting left side fuselage step
Details
       

 03-28-2010
1.50
Rough cut install of Fuselage Steps
Details
       

 03-28-2010
2.50
Removed Baggage floor and side skins
Details
       

 03-24-2010
1.50
Tunnel Cover & Flap Bracket
Details
       

 03-21-2010
4.50
Seat Adjustment Supports
Details
       

 03-21-2010
1.50
Enlarging Ribs for Control Stick Fitting
Details
       

 03-21-2010
1.00
Completed Control stick installation
Details
       

 03-21-2010
1.00
Added spacing washers to Control stick assmb
Details
       

 03-20-2010
1.50
Fuel Pump Doubler Prime and Rivet
Details
       

 03-20-2010
2.50
Fuel Pump Doubler Fabrication
Details
       

 03-14-2010
2.00
Tunnel Cover (F-741B)
Details
       

 03-14-2010
2.00
Drilling lightening holes for seatback support
Details
       

 03-13-2010
3.00
Control Stick Assembly
Details
       

 03-12-2010
1.50
Firewall Recess Drill & Dimple
Details
     

 03-06-2010
0.50
Tap Tie-Down Bar (W-933)
Details
       

 03-06-2010
4.50
Parts Inventory and Storage
Details
     

 03-06-2010
2.00
Drill, Prime and Rivet brake line bracket (F-6122)
Details
       

 02-28-2010
0.00
QB Fuselage Quality Pictures #2
       

 02-28-2010
0.00
QB Fuselage Quality Pictures #1
       

 02-27-2010
4.00
Fabricate Seat Back Assembly & Tie down bar
Details
       

 02-20-2010
2.00
QB Fuselage and Wing Inventory
Details

 02-20-2010
2.00
Inventoried Parts Fabrication
Details

 02-17-2010
1.00
QB Fuselage & Wings Delivery
Details
       