Powered By Kitlog Pro v2.0
Toms RV9-A project
RV-9A
03- Empennage
Work Logs Found:
56
Category Work Time:
112 Hours
Date
Hours
Work Log Summary
Details
12-14-2013
1.00
Tinnerman washers for Empennage Fairing
Details
11-25-2013
0.50
Secured Tail Strobe wiring bundle
Details
11-25-2013
1.00
Installed Strobe wiring pass through
Details
11-03-2013
2.00
Installed Elevator tips
Details
10-20-2013
3.00
Installed Elevator and Rudder
Details
10-20-2013
3.50
Final Empennage Assembly
Details
08-18-2013
1.00
"N" Number decal installation
Details
06-30-2012
2.50
Installed Shoulder Harness Wear Blocks
Details
11-28-2010
3.50
Pop Rivet vertical and horizontal stabilizer fairi
Details
11-28-2010
0.00
Additional pictures
Details
11-27-2010
3.50
Elevator Balancing and wing part prep
Details
11-23-2010
1.50
Final Epoxy Coat for Empennage Fairing
Details
11-23-2010
0.00
Expoxied Faring add'l pictures
Details
11-23-2010
1.00
Epoxied Fairing
Details
11-22-2010
1.50
Lower Empennage fairing holes fore and aft
Details
11-22-2010
2.00
Install forward empennage fairing plate nuts
Details
11-21-2010
3.50
Finish cutting Fuselage Fairing
Details
11-20-2010
3.50
Install Nut Plates for Empennage Fairing
Details
11-14-2010
2.00
Empennage Fairing trial fit
Details
11-13-2010
2.00
Platenut install for Rudder Fairing
Details
11-08-2010
1.50
FInish sanding and drilling bottom rudder fairing
Details
11-07-2010
2.50
Fabricated and Installed Rudder Stops
Details
08-01-2010
2.50
Epoxy finishing empennage tips
Details
07-27-2010
2.00
Vertical Stabilizer Fiberglass tips
Details
07-26-2010
2.00
Horizontal Stabilizer Fiberglass tip (right)
Details
07-25-2010
2.50
Horizontal Stabilizer Fiberglass tips (left)
Details
07-21-2010
1.50
Empennage Tips
Details
07-20-2010
2.00
Tail Tie down bar and Rudder attach
Details
07-18-2010
2.00
Horitontal Stabilizer front spar attach
Details
07-17-2010
2.50
Elevator Horn Bolts
Details
07-12-2010
0.00
Horizontal attach bolts underside edge clearance
Details
07-11-2010
0.50
Horizontal Stabilizer Empennage Attach #1
Details
07-11-2010
5.50
Horizontal Stabilizer Attach #2
Details
07-10-2010
0.50
Install Elevator counterweights
Details
07-10-2010
2.50
Horizontal Stabilizer fairing
Details
07-09-2010
2.00
Elevator rod end bearings install
Details
07-05-2010
1.00
Horizontal Stabilizer trial fit
Details
08-28-2009
0.10
Photo or Wally and Phil from Synergy Air
Details
08-27-2009
1.00
rveting horizontal stabilizer spar
Details
08-27-2009
2.00
riveting horizontal stabilizer skins
Details
08-27-2009
1.00
riveting horizontal stabilizer frame ribs and spar
Details
08-27-2009
1.00
pop riveting rudder leading edge
Details
08-27-2009
2.00
flush riveting horizontal stabilizer leading edge
Details
08-27-2009
2.00
cleaning up trailing edges before riveting
Details
08-26-2009
2.00
riveting vertical stabilzer skin to frame
08-26-2009
2.00
Glue elevator trailing edges
Details
08-26-2009
1.00
fabricate horizontal stabilizer attach points
Details
08-26-2009
1.00
countersinking rudder trailing edge
Details
08-26-2009
1.00
assembling vertical stabilizer frame
Details
08-25-2009
3.00
riveting skins to left elevator
Details
08-25-2009
4.00
fitting skins to right elevator
Details
08-25-2009
1.00
assemble left elevator frame
Details
08-24-2009
2.00
Rivet Horizontal Stabilizer frame
Details
08-24-2009
4.00
flush rivet horizontal stabilizer skins
Details
08-24-2009
2.00
Building the Horizontal Stabilizer Frame
Details
08-22-2009
8.00
Rudder Skeleton
Details
SITE NAVIGATION
Contact Builder
RV-9A Home
Category
# Logs
# Hours
All
615
1246
01- Why RV-9
2
02- Shop
10
27
03- Empennage
56
112
04 - Wings
73
172
05- Fuselage
121
238
06 - Gear & Fairing
27
68
07 - Firewall Fwd
70
150
08 - FAB
8
19
09- Tip-Up Canopy
69
152
10 - Cowl & Baffle
38
88
11 - Avionics
79
173
12 - Registration
7
8
13 - Training
2
6
14 - Phase 1 Testing
11
18
15 - RV Trips
1
2
99 - Miscellaneous
41
13
Copyright © 2001-2024 Matronics. All Rights Reserved.