KitLog pro

Powered By Kitlog Pro v2.0

Toms RV9-A project
' style=
Date:  8-30-2013
Number of Hours:  1.50
Manual Reference:  
Brief Description:  Fuel Tank Sender Wiring

Measured offset for the fuel sensder location and transferred location to the fuselage and drilled a 1/4" hole and snap bushing. Ran seperate grounds for the Left and Right senders and added ring connectors and heat shrink to protect against the elements. Ran the heat shring a few inches inside the snap bushing.
' style=

Sender wirring exit from fuselage

Sender wirring exit from fuselage

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.