KitLog pro

Powered By Kitlog Pro v2.0

Toms RV9-A project
' style=
Date:  8-28-2013
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Fuel Pump Overflow Tubing

Been going through the plans as I finalize things before moving to Doylestown Airport. Missed installing the fuel pump overflow tubing. Installed per plans.
' style=

Overflow tubing saftey tied to  exit

Overflow tubing saftey tied to exit

' style=

Overflow tubing safety tied

Overflow tubing safety tied

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.