KitLog pro

Powered By Kitlog Pro v2.0

Toms RV9-A project
' style=
Date:  8-18-2013
Number of Hours:  1.50
Manual Reference:  
Brief Description:  Drilled holes for Skyview OAT Probes

Drilled and deburred holes next to the Pitot tube for the Skyview OAT probes. Wrapped wires and pulled through Wing conduit.

Since I have Dual ADHAR units each one requires a seperate OAT probe. They will be out of the prop wash and being next to the pitot tube in clear air and under the wing and protected.
' style=

Holes drilled

Holes drilled

' style=

inside shot with mirror

inside shot with mirror

' style=

Probes installed

Probes installed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.