Powered By Kitlog Pro v2.0
Toms RV9-A project
RV-9A
All
3-13-2010
< Previous Log Entry
Next Log Entry >
Date:
3-13-2010
Number of Hours:
3.00
Manual Reference:
8-2, DWG 38
Brief Description:
Control Stick Assembly
Complete the WD-610 control stick assembly. Ground down the control stick bushings and weldments to size. Reamed out bushing with a 1/4: drill bit so the AN4 bolt would fit. Assembled hardware per plans. Still need to prime F-665 pushrod.
Left control stick
Completed Assembly
Right control stick
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-9A Home
Category
# Logs
# Hours
All
615
1246
01- Why RV-9
2
02- Shop
10
27
03- Empennage
56
112
04 - Wings
73
172
05- Fuselage
121
238
06 - Gear & Fairing
27
68
07 - Firewall Fwd
70
150
08 - FAB
8
19
09- Tip-Up Canopy
69
152
10 - Cowl & Baffle
38
88
11 - Avionics
79
173
12 - Registration
7
8
13 - Training
2
6
14 - Phase 1 Testing
11
18
15 - RV Trips
1
2
99 - Miscellaneous
41
13
Copyright © 2001-2024 Matronics. All Rights Reserved.