KitLog pro

Powered By Kitlog Pro v2.0

Toms RV9-A project
' style=
Date:  7-25-2013
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Reiff Oil sump heater installation

Purchased some paint remove at Sherwin Williams and scraped the left and right side of the oil sumps for installing the heating pads. Prepped and cleaned the pan and heating pads and mixed the supplied epoxy. Duct taped in position. Needs to cure for a full 24 hours.
' style=

Left Side heater epoxied and taped

Left Side heater epoxied and taped

' style=

Left side headter and thermostat

Left side headter and thermostat

' style=

Right side heater

Right side heater

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.