KitLog pro

Powered By Kitlog Pro v2.0

Toms RV9-A project
' style=
Date:  6-16-2013
Number of Hours:  2.50
Manual Reference:  
Brief Description:  Alternate Air Push-Pull Control

Installed the Alternate Air Push-Pull control in the panel. Secured with a few adel clamps on the firewall forward side and underneath the interrmediate bulkhead. Used the steel firewall pass through fitting I made some time ago.

In the picture you can see the first ste of adel plamps above the red fuel line center of the picture and down below.

I also drilled a 1/4" hole for the alternate static and ran aft to the baggage compartment. Ordered a Y fitting to tie into the existing static tubing.
' style=

Alt Air Installed

Alt Air Installed

' style=

Alt Air cable pass through

Alt Air cable pass through

' style=

firewall side adel clamps

firewall side adel clamps

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.