KitLog pro

Powered By Kitlog Pro v2.0

Toms RV9-A project
' style=
Date:  5-5-2013
Number of Hours:  4.50
Manual Reference:  
Brief Description:  Transponder, ELT & Pitch Servo Wiring

Continued wiring the various avionics. Completed the following items:
1) Fabricated two splice blocks mounts (see below picture) that will be used for the stick grip wiring and the nav/strobe wiring.
2) Fabricated the wiring harness for Pitch Servo & ELT; Installed and tested ELT and Pitch Servo
3) Fabricated and Installed the extended wiring for the Transponder; Configured and tested
-----------------------------------------------------------------------------------------------------------------------------------
Getting close to finishing up the avionics wiring here is what is left of the punch list:
1) Drill hole for ELT Coax pass through into rear baggage compartment
2) Run Pilot /Co-Pilot headset wiring
3) Flaps – Install Flap assembly in fuselage; flap switch, servo wiring and position sensor; config with VPX
4) Run pitch & Roll trim wires and install stock grips
5) Install engine and other push pull controls
6) Run Engine primer copper tubing
7) Install blast tubes for Pmags and primary alternator
' style=

Micro splice block from Mouser

Micro splice block from Mouser

' style=

Wiring hardness

Wiring hardness

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.