KitLog pro

Powered By Kitlog Pro v2.0

Toms RV9-A project
' style=
Date:  3-30-2013
Number of Hours:  3.50
Manual Reference:  
Brief Description:  VPX Wiring 4

Completed Skyview EMS Wiring:

1) Boost Pumo
2) Oil Pressure
3) Fuel Pressure
4) Fuel Flow
5) Oil Temperature
6) Manifold Pressure
7) Carb Temperature

Drilled panel and installed switches for the rught side panel.
' style=

Fuel and Oil Pressure, MAP sensor

Fuel and Oil Pressure, MAP sensor

' style=

Fuel Flow

Fuel Flow

' style=

Richt side panesl switches

Richt side panesl switches

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.