KitLog pro

Powered By Kitlog Pro v2.0

Toms RV9-A project
' style=
Date:  3-9-2013
Number of Hours:  1.50
Manual Reference:  
Brief Description:  Ran wiring and string through conduit

Got my shop vac adapter and vacuum pulled string through the two conduits in the aft section of the fuselate. Ran the ADSB DB9 cable to the front of the firewall. Secured conduit with Adel clamps and zip ties.
' style=

Conduit secured on firewall

Conduit secured on firewall

' style=

ADSB wiring run

ADSB wiring run

' style=

tail section string leader

tail section string leader

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.