2011 • Oil Pressure line install, EGT and Engine Baffles started, Starter cables fabricated, Map Sensor, engine breather – Dec, 2011 • Finished Exhaust hangers, cockpit finish painting - November, 2011 • Drilled and mounted Engine Mount, Mounted Engine, mounted exhaust – October 2011 • Lycoming engine arrives, Installed Wheels and landing gear, FW attachments – Sept 2011 • Drilled Wing Spar bolts, Drilled Wing Root fairings, Flap rod clearance – August 2011 • Riveted Right wing skin, Set Wing Incidence – July 2011 • Wingtip installation, Lycoming O320-D2A Ordered, Right Wing skin prep – June, 2011 • Pitot mounting, Dynon roll servo, Wingtip lenses, left skin wing skin riveting – May 2011 • Fuel tank leak test, Aileron stops, Aileron attachment, Flap allignment – April, 2011 • Aileron bracket and gap seal assembly, Duck works landing light install – March 2011 • Wing Conduit, bell crank, fuel tank pickups and sender assembly – Feb, 2011 • Canopy Frame priming, Cabin Frame riveting, drilling canopy bolts – Jan 2011
|