KitLog pro

Powered By Kitlog Pro v2.0

Toms RV9-A project
' style=
Date:  1-28-2012
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Prop Extension and spinner trial fit

Ordered my prop extension from Saber and received it before the weekend. Installed the 7/16" bolts with locktte per instructions and got out the prop to check how the spinner fit. The spinner was cut by Craig Catto when I ordered the prop and all of the holes are drilled and the spinner is clocked with the prop for an exact fit. Removed the Prop for future installation and left the extension permanently on when I start the Cowl.
' style=

Prop and spinner temporarily installed

Prop and spinner temporarily installed

' style=

Side shot of prop and spinner

Side shot of prop and spinner

' style=

Prop extension installed

Prop extension installed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.