KitLog pro

Powered By Kitlog Pro v2.0

Toms RV9-A project
' style=
Date:  10-5-2011
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Mounted Main gear

Setup the engine hoist and strapped the fuselage to raise it for the main gear attachments. The right gear went on smoothly, however the left side was very tight. I used some open mesh pipe sandpaper and polished both suftaces. Lining up the hole also took some doing. Steve stoppped by and assited with a long drift punch he had. All went well after that and now the fuselage stands on two of the three legs.
' style=

Main Gears on

Main Gears on

' style=

Left side done, what a prolem

Left side done, what a prolem

' style=

right side went on in 10 minutes.

right side went on in 10 minutes.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.