KitLog pro

Powered By Kitlog Pro v2.0

Eds Vans RV-6A/7A Web Site
' style=
Date:  8-29-2008
Number of Hours:  0.00
Manual Reference:  
Brief Description:  Install DuckWorks landing lights. Part 3

Today I installed the platenuts on the landing light lens brackets.

Image 1 shows what happens to the work bench in very shoet order. It was totally clear an hour ago. All these tools to attach platenuts.

Image 2 shows the perfect ham and cheese omlet. I make the best omlets. Really. It was perfect.

Image 3 shows the finished product. Make sure you make 2 pair of them. If you get in auto pilot you will end up with 3 of one kind and 1 of the other.

Oh, the instructions say to use 3.5 length rivets for the platenuts. I think they are too long. The 3's worked perfect.
' style=

Work bench after this small task.

Work bench after this small task.

' style=

The perfect omlet.

The perfect omlet.

' style=

Lens brackets.

Lens brackets.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.