KitLog pro

Powered By Kitlog Pro v2.0

Eds Vans RV-6A/7A Web Site
' style=
Date:  8-6-2008
Number of Hours:  0.00
Manual Reference:  
Brief Description:  Rivet tank ribs part 3.

All 10 interior ribs are riveted in place. Thanks a lot Mindy. We did 3 ribs Saturday and 5 ribs Sunday. Very cool. Lots of work.

With the tank clecoed and set into place I had a full 1/16" gap between the tank skin and top main skin. I was very worried about this and just could not close that gap. I adjusted the rib flanges one more time to make sure they we 90 degress to the web before riveting. After riveting and placing it in place I am heppy to report the gap is totally gone. I have a perfect fit. Really, its a perfect fit. Amazing.

I'm so happy.

To date I've installed and riveted -
Fuel cap flange
Fuel drain flange
Stiffeners
All interior ribs

Time to install -
Capacitance fuel sender hardware
Fuel vent tubing and hardware
Fuel return tubing and hardware
Fuel pickup hardware
End ribs and doubler plates
Inspection plate
Baffle
Z brakets
Presure test

I actually still have a lot of work to do on these tanks.
' style=

Rib riveted and sealed.

Rib riveted and sealed.

' style=

Tank placed in position.

Tank placed in position.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.